ML20083C183

From kanterella
Jump to navigation Jump to search
Monthly Operating Rept for April 1995 for Vogtle Electric Generating Plant Unit 1
ML20083C183
Person / Time
Site: Vogtle  Southern Nuclear icon.png
Issue date: 04/30/1995
From: Hooper G
GEORGIA POWER CO.
To:
Shared Package
ML20083C154 List:
References
NUDOCS 9505150186
Download: ML20083C183 (10)


Text

U --

1 i

1 ENCLOSURE 1 VOGTLE ELECTRIC GENERATING PLANT - UNIT 1 MONTHLY OPERATING REPORT FOR APRIL 1995 i

TABLE OF CONTENTS i

NARRATIVE REPORT Page Vl-1 OPERATING DATA REPORT Page VI-2 AVERAGE DAILY POWER LEVEL Page VI-3 UNIT SHUTDOWNS AND POWER REDUCTIONS Page VI-4 i

l i

c

{

l 9505150186 950508 j

PDR ADOCK 05000424 i

R pop

.l i

A

+

NARRATIVE REPORT DOCKET NO. 50424 UNIT 1 DATE:

MAY 1,1995 COMPLETED BY: G. L. HOOPER TELEPHONE:

(706) 826-4104 APRIL 01 00:00 UNIT 1 AT 100% POWER WITH NO OPERATIONAL PROBLEMS.

APRIL 30 23:59 UNIT 1 AT 100% POWER WITH NO OPERATIONAL PROBLEMS.

l l

l l

l V1-1

G OPERATING DATA REPORT DOCKET NO. 50-424 DATE:

MAY 1,1995 COMPLETED BY: G. L. HOOPER TELEPHONE:

(706) 826-4104 OPERATING STATUS

-1. UNIT NAME:

VEGP UNIT 1

2. REPORT PERIOD:

APRIL 1995

3. LICENSED THERMAL POWER (MWt):

3565

4. NAMEPLATE RATING (GROSS MWe):

1215

5. DESIGN ELECTRICAL RATING (NET MWe):

1169-

6. MAXIMUM DEPENDABLE CAPACITY (GROSS MWe):

1216

7. MAXIMUM DEPENDABLE CAPACITY (NET MWe):

1162

8. IF CHANGES OCCUR IN CAPACITY RATINGS (ITEMS 3 THROUGH 7) SINCE LAST REPORT, GIVE REASONS:

NA

9. POWER LEVEL TO WHICH RESTRICTED,IF ANY (NET MWe):

NO RESTRICTIONS

10. REASONS FOR RESTRICTION, IF ANY:

NA THIS MONTH YR. TO DATE CUMULATIVE

11. HOURS IN REPORTING PERIOD:

719 2879 69384

12. NUMBER OF HOURS REACTOR WAS CRITICAL:

719.0 2879.0 60643.6

13. REACTOR RESERVE SHUTDOWN HOURS:

0.0 0.0 0.0

14. HOURS GENERATOR ON-LINE:

719.0 2806.6 59527.4

15. UNIT RESERVE SHUTDOWN HOURS:

0.0 0.0 0.0

16. GROSS THERMAL ENERGY GENERATED (MWH):

2561802 9992982 200786283

17. GROSS ELEC. ENERGY GENERATED (MWH):

877138 3420308 67646995

18. NET ELEC. ENERGY GENERATED (MWH):

839138 3267778 64326225

19. REACTOR SERVICE FACTOR 100.0 %

100.0 %

87.4%

20. REACTOR AVAILABILITY FACTOR 100.0 %

100.0 %

87.4 %

21. UNIT SERVICE FACTOR:

100.0 %

97.5 %

85.8 %

22. UNIT AVAILABILITY FACTOR:

100.0 %

97.5 %

85.8 %

23. UNIT CAPACITY FACTOR (USING MDC NET):

100.4 %

97.7 %

83.6 %

24. UNIT CAPACITY FACTOR (USING DER NET):

99.8 %

97.1 %

83.0%

25. UNIT FORCED OUTAGE RATE:

0.0%

0.0%

4.7%

36. SHUTDOWNS SCHEDULED OVER THE NEXT 6 MONTHS (TYPE, DATE, AND DURATION OF EACH):

NONE

27. IF SHUTDOWN AT END OF REPORT PERIOD ESTIMATED DATE OF STARTUP:

NA V1-2

r.

UNIT 1 AVERAGE DAILY DOCKET NO. 50-424 POWER LEVEL DATE:

MAY 1,1995 COMPLETED BY: G. L. HOOPER TELEPHONE:

(706) 826-4104 DAY Net MW 1.

1172

  • 2..

1174

  • 3.

1172

  • 4......

1170

  • 5....

1174

  • 6..

1174

  • 7.

1173

  • 8..

1170

  • 9 1165
  • 10.

1162

  • 11.

1160 12.

1160 13..

1167

  • 14...

1174

  • 15.

1172

  • 16.

1166

  • 17, 1162
  • 18..

1159 19..

1158 20.

1160 21.

1158 22.

1161 23.....

1163

  • 24..

1170

  • 25..

1177

  • 26.

1173

  • 27...

1171

  • 28.

1169

  • 29.

1165

  • 30.

1163 *

  • MDC CAN BE EXCEEDED UNDER OPTIMAL CONDITIONS V1-3

UNIT SHUTDOWNS AND POWER REDUCTIONS DOCKET NO. 50-424 DATE:

MAY 1,1995 UNIT NAME:

VEGP UNIT 1 COMPLETED BY: G. L. HOOPER TELEPHONE:

(706)826-4104 REPORT MONTH APRIL 1995 l

R M

S i

E E

Y T

A T

LICENSEE SC Y

S H

EVENT TO COMPONENT CAUSE & CORRECTIVE P

DURATION O

O REPORT ED CODE ACTION TO NO.

DATE E

(HOURS)

N D

NUMBER ME (SUBCODE)

PREVENT RECURRENCE i

NA NA NA NA NA NA NA NA NA NA F: FORCED REASON:

METHOD:

EVENTS REPORTED INVOLV S: SCHEDULED A-EQUIPMENT FAILURE (EXPLAIN) 1 - MANUAL A GREATER THAN 20%

B-MAINTENANCE OR TEST 2 - MANUAL SCRAM REDUCTION IN AVERAGE C-REFUELING 3 - AUTO. SCRAM DAILY POWER LEVEL FOR D-REGULATORY RESTRICTION 4 - CONTINUATIONS THE PRECEDING 24 HOURS.

E-OPERATOR TRAINING & LICENSE 5 - LOAD REDUCTION F-ADMINISTRATIVE 9 - OTHER (EXPLAIN)

G-OPERATIONAL ERROR (EXPLAIN)

H-OTHER (EXPLAIN) i l

V1-4

ENCLOSURE 2 VOGTLE ELECTRIC GENERATING PLANT - UNIT 2 MONTHLY OPERATING REPORT FOR APRIL 1995 TABLE OF CONTENTS NARRATIVE REPORT Page V2-1 OPERATING DATA REPORT Page V2-2 AVERAGE DAILY POWER LEVEL Page V2-3 UNIT SHUTDOWNS AND POWER REDUCTIONS Page V2-4

r t

NARRATIVE REPORT DOCKET NO. 50-425 UNIT 2 DATE:

MAY 1,1995 COMPLETED BY: G. L. HOOPER TELEPHONE:

(706) 826-4104 APRIL 01 00:00 UNIT 2 AT 28% POWER. POWER ASCENSION IN PROGRSS.

APRl8 ')1 09:11 UNIT 2 TURBINE TRIPPED FOR TURBINE OVERSPEED TESTING.

APRIL 01 10:30 UNIT 2 GENERATOR TIED TO GRID.

APRIL 04 19:00 UNIT 2 AT 100% POWER.

APRIL 30 23:59 UNIT 2 AT 100% POWER, NO OPERATIONAL PROBLEMS.

f 4

V2-1

n s.

OPERATING DATA REPORT DOCKET NO. 50-425 DATE:

MAY 1,1995 COMPLETED BY: G. L. HOOPER i

TELEPHONE:

(706) 826-4104 i

i OPERATING STATUS

1. UNIT NAME:

VEGP UNIT 2

2. REPORT PERIOD:

APRll 1995

3. LICENSED THERMAL POWER (MWt):

3565 i

4. NAMEPLATE RATING (GROSS MWe):

1215

5. DESIGN ELECTRICAL RATING (NET MWe):

1169

6. MAXIMUM DEPENDABLE CAPACITY (GROSS MWe):

1216

7. MAXIMUM DEPENDABLE CAPACITY (NET MWe):

1162

8. IF CHANGES OCCUR IN CAPACITY RATINGS r

(ITEMS 3 THROUGH 7) SINCE LAST REPORT, GIVE REASONS:

NA I

9. POWER LEVEL TO WHICH RESTRICTED, IF ANY (NET MWe):

NO RESTRICTIONS j

10. REASONS FOR RESTRICTION,IF ANY:

NA j

THIS MONTH YR. TO DATE CUMULATIVE i

11. HOURS IN REPORTING PERIOD:

719 2879 52128

12. NUMBER OF HOURS REACTOR WAS CRITICAL:

719.0 2104.6 46252.3

13. REACTOR RESERVE SHUTDOWN HOURS:

0.0 0.0 0.0

14. HOURS GENERATOR ON-LINE:

717.7 2071.1 45661.3

15. UNIT RESERVE SHUTDOWN HOURS:

0.0 0.0 0.0 l

16. GROSS THERMAL. ENERGY GENERATED (MWH):

2438900 7162979 152721607 l

17. GROSS ELEC. ENERGY GENERATED (MWH):

834914 2466647 51915343 l

18. NET ELEC. ENERGY GENERATED (MWH):

798374 2351737 49430813

19. REACTOR SERVICE FACTOR 100.0 %

73.1%

88.7 %

o

20. REACTOR AVAILABILITY FACTOR 100.0 %

73.1 %

88.7 %

21. UNIT SERVICE FACTOR:

99.8 %

71.9 %

87.6 %

22. UNIT AVAILABILITY FACTOR:

99.8 %

71.9 %

87.6 %

33. UNIT CAPACITY FACTOR (USING MDC NET):

95.6 %

70.3 %

84.5 %

84. UNIT CAPACITY FACTOR (USING DER NET):

95.0 %

69.9%

84.5 %

25. UNIT FORCED OUTAGE RATE:

0.0%

0.0%

2.1%

' 26. SHUTDOWNS SCHEDULED OVER THE NEXT 6 MONTHS (TYPE, DATE, AND DURATION OF EACH):

NONE

27. IF SHUTDOWN AT END OF REPORT PERIOD, ESTIMATED DATE OF STARTUP :

NA i

V2-2

n i!.

7 L

UNIT 2 - AVERAGE DAILY DOCKET NO. 50-425 POWER LEVEL DATE:

MAY 1,1995 COMPLETED BY: G. L. HOOPER

-l TELEPHONE:

-(706)8264104

~1 i

i i

l DAY.

Net MW l

1.

193 2.............

519.

3................

901 j

4.................

1105 i

i 5..................

1178

  • l 6..............

1187 *

-l

-7............

1184

  • 8.................

1179

  • 9.............

1179

  • 10...

1173

  • t 11........

1170

  • l 12........

1162

  • l 13................

1173

  • 14....

1182

  • 15-1182
  • 16..

1177

  • l 17.............

1172 *

!-l 18...................

i'70

  • 19..

1167 *

]

20....

1170 *

.l 21........

1169

  • 22...

1170 *

}

23.

1173

  • I 24......

1179

  • 25...............

1184

  • I 26...........

1183

  • 27...

1180

  • 28.....

1178

  • 29....

1178

  • 30..

1171

  • 1 1
  • MDC CAN BE EXCEEDED UNDER OPTIMAL CONDITIONS j

i 1

1 i

1 f

]

V2-3 1

l

UNIT SHUTDOWNS AND POWER REDUCTIONS DOCKET NO. 50-425 DATE:

MAY 1,1995 UNIT NAME:

VEGP UNIT 2 COMPLETED BY: G. L. HOOPER TELEPHONE:

(706) 826-4104 REPORT MONTH APRIL 1995 R

M S

E E

Y T

A T

LICENSEE SC Y

S H

EVENT TO COMPONENT CAUSE & CORRECTIVE P

DURATION O

O REPORT ED CODE ACTION TO NO.

DATE E

(HOURS)

N D

NUMBEF ME (SUBCODE)

PREVENT PECURRENCE 95-2 4/1/95 S

1.3 B

1 NA TA

/eeeee SEE BELOW F: FORCED REASON:

METHOD:

EVENTS REPORTED INVOLV S: SCHEDULED A-EQUIPMENT FAILURE (EXPLAIN) 1 - MANUAL A GREATER THAN 20%

B-MAINTENANCE OR TEST 2 - MANUAL SCRAM REDUCTION IN AVERAGE C-REFUELING 3 - AUTO. SCRAM DA!LY POWER LEVEL FOR D-REGULATORY RESTRICTION 4 - CONTINUATIONS THE PRECEDING 24 HOURS.

E-OPERATOR TRAINING & LICENSE 5 - LOAD REDUCTION F-ADMINISTRATIVE 9 - OTHER (EXPLAIN)

G-OPERATIONAL ERROR (EXPLAIN)

H-OTHER (EXPLAIN)

EVENT 95-2 CAUSEL UNIT TAKEN OFF LINE FOR TURBINE OVERSPEED TESTING CORRECINEACIlONLTESTING COMPLETED. UNIT RETURNED TO SERVICE.

V2-4

i; o

i t

i I

i ENCLOSURE 3 i

i VOGTLE ELECTRIC GENERATING PLANT-UNITS 1 AND 2 CHALLENGES TO PORY OR SAFETY VALVES DOCKET NOS. 50-424,50-425 DATE:

MAY 1,1995 i

COMPLETED BY: G. L. HOOPER TELEPHONE:

(706) 826-4104 l

i EVENT DATE TAG NO.

TYPE DESCRIPTION NA NA NA NA i

I