September 18. 1991 ees U.
S.. Nuclear Regulatory Commission Attn:
Document Control Desk Washington, DC -20555
Subject:
Beaver Valley Power Station, Unit No. 1 (DVPS-1) and No. 2 (BVPS-2)
BV-1 Docket No. 50-334, Licensa No. DPR-66 BV-2 Docket No. 50-412, License No. NPF-73 Generic Let-ter 88-20 (TAC No. 74378)
-Ref:
Duquesne Light Company (DLC)
Letter to the NRC providing the 60-day Response to Generic Letter 88-20, dated October 30, 1989 The' purpose.of this letter is to notify the NRC of a change.in the schedule for submittal of the BVPS-1 and BVPS-2 Individual Plant Exainination (IPE) reports.
We have re-evaluated the remaining PRA vork and determined the effort required to finalize each Unit's IPE report.:
As a result, we intend to extend the schedule for the BVPS-2 IPE submittal to November 29, 1991, and for the BVPS-1 IPE submittal to September 1,
1992.
This remains consistent with the schedule regnested by.the NRC in Generic Letter 88-20.
Should you have any questions, regarding this change in schedule, please contact Ed-Cobolich at (412) 393-5224.
Sincerely, A>
,~
J.
D. Siebe Vice President Nuclear Group cc:
Mr. J.-Beall, Sr. Resident Inspector Mr. T. T. Martin, NRC Region I Administrator Mr. A. W.
DeAgazio,-Project Manager Mr. M.
L. Bowling (VEPCO) 92 f
[
'(