ML20083C182

From kanterella
Jump to navigation Jump to search

Notifies NRC of Change in Schedule for Submittal of Individual Plant Exam Repts.Intends to Extend Schedule for Unit 2 Submittal to 911129 & Unit 1 Submittal to 920901
ML20083C182
Person / Time
Site: Beaver Valley
Issue date: 09/18/1991
From: Sieber J
DUQUESNE LIGHT CO.
To:
NRC OFFICE OF INFORMATION RESOURCES MANAGEMENT (IRM)
References
GL-88-20, TAC-74378, NUDOCS 9109260077
Download: ML20083C182 (1)


Text

_ _ _ _

.e

.; w s.a o*w sum w;wynn r4 !sn cw4 CISME., c,.=

September 18. 1991 ees U.

S.. Nuclear Regulatory Commission Attn:

Document Control Desk Washington, DC -20555

Subject:

Beaver Valley Power Station, Unit No. 1 (DVPS-1) and No. 2 (BVPS-2)

BV-1 Docket No. 50-334, Licensa No. DPR-66 BV-2 Docket No. 50-412, License No. NPF-73 Generic Let-ter 88-20 (TAC No. 74378)

-Ref:

Duquesne Light Company (DLC)

Letter to the NRC providing the 60-day Response to Generic Letter 88-20, dated October 30, 1989 The' purpose.of this letter is to notify the NRC of a change.in the schedule for submittal of the BVPS-1 and BVPS-2 Individual Plant Exainination (IPE) reports.

We have re-evaluated the remaining PRA vork and determined the effort required to finalize each Unit's IPE report.:

As a result, we intend to extend the schedule for the BVPS-2 IPE submittal to November 29, 1991, and for the BVPS-1 IPE submittal to September 1,

1992.

This remains consistent with the schedule regnested by.the NRC in Generic Letter 88-20.

Should you have any questions, regarding this change in schedule, please contact Ed-Cobolich at (412) 393-5224.

Sincerely, A>

,~

J.

D. Siebe Vice President Nuclear Group cc:

Mr. J.-Beall, Sr. Resident Inspector Mr. T. T. Martin, NRC Region I Administrator Mr. A. W.

DeAgazio,-Project Manager Mr. M.

L. Bowling (VEPCO) 92 f

[

'(