ML20083C083
| ML20083C083 | |
| Person / Time | |
|---|---|
| Site: | Limerick |
| Issue date: | 12/19/1983 |
| From: | Kemper J PECO ENERGY CO., (FORMERLY PHILADELPHIA ELECTRIC |
| To: | Schwencer A Office of Nuclear Reactor Regulation |
| References | |
| NUDOCS 8312220096 | |
| Download: ML20083C083 (5) | |
Text
PHILADELPHIA ELECTRIC 881 -1981 2301 MARKET STREETCOMPANY P.O. BOX 8699 PHILADELPHIA PA V K E PRESIDENT 19101 tasGshee n Ns Ann (2151041-4502 ma ss a mcw Licensing Branch NoMr. A. Schwencer, Chief U.S. Nuclear Regulator 2
Washington, DC 20555 y Commission
Subject:
Limerick Generating St
Reference:
Questionnaire on Facility Station, Units 1 and 2 affing R. E. Martin to Person List letter dated Dec s on Limerick Service
Dear Mr. Schwencer:
ember 6, 1983 Enclosed is Questionnaire Philadelphia on Facility StaffingElectric Ccmpany's response to the Sincerely, OMA SL "
/
s' Copies to:
See Attached Service Li LN/mtk/121483930 st 1I 8312220096 831219 PDR ADOCK 05000352 A
e cc: Judge Lawrence Brenner (w/ enclosure)
Judge Peter A. Morris (w/ enclosure)
Judge Richard F. Cole (w/ enclosure)
Troy B. Conner, Jr., Esq.
(w/ enclosure)
Ann P. Hodgdon, Esq.
(w/ enclosure)
Mr. Frank R. Romano (w/ enclosure)
Mr. Robert L. Anthony (w/ enclosure)
Mr. Marvin 1,. Lewis (w/ enclosure)
Ms. Phyllis Zitzer (w/ enclosure)
Charles W. Elliott, Esq.
(w/ enclosure)
Zori G. Ferkin, Esq.
(w/ enclosure)
'Mr. Thomas Gerusky (w/ enclosure)
Director, Pennsylvania Emergency Management Agency (w/ enclosure)
Mr. Steven P. Hershey (w/ enclosure)
Angus Love, Esq.
(w/ enclosure)
Mr. Joseph H. White, III (w/ enclosure)
David Wersan, Esq.
(w/ enclosure)'
Robert J. Sugarman, Esq.
(w/ enclosure)
Martha W. Bush, Esq.
(w/ enclosure)
Spence W. Perry, Esq.
(w/ enclosure)
Jay M. Gutierrez, Esq.
(w/ enclosure)
Atomic Safety and Licensing Appeal Board (w/ enclosure)
Atomic Safety and Licensing Board Panel (w/ enclosure)
Docket and Service Section (w/ enclosure) e 0
y-y
~
,. -... - -. - -. - - - - - ~
5..
]
g.
B.
ON-SITE MANAGEMENT Fill in Table (Use Appropriate Titles)
Operations.
Assistant Maint. Tech. Startup STA Supervisor Plant Mgr.
Plant'Mgr.
'Eng.
Eng.
Director To have license at time of OL No Yes
-Yes No Yes Yes' No Previously licenses No SRO SRO SRO No No No SRO RO/SRO Type Plant BWR-1100MWe BRW HTGR BWR-1100 1100 40 MWe MWe MWe No. Years 3
8 3
3 No. Years "Not" Exp.
3 8
3 3
Degreed Yes Yes Yes Yes Yes Yes Yes (8)
Type (Discipline (s))
ME (5)
EE (2)
ME ME ME ME ME ME ChE (1)
Level (A/B/M/D)
BS BS BS MS BS BS BS e
d 7 '-
CORPORATE NUCLEAR EXPERIENCE (i.e.,
"Of f-Site" Management)
Yrs. In Operator Lic.
Yrs. at Nuc'. Support /
Degrees we e
)
per.
uc.
anagement Lael POSITION NAME NUC NAVY RO/SRO/Ncne Stations Positions' (A/B/M/D)
Discipline (s)
(Yrs)
(On-Site)
(Off-Site)
MECH. ENGR.
SR. VP -
BS &
. PROF. ENGR.
NUCLEAR VS BOYER NONE NONE 23 HTGR/BWR MS VP -
SL DALTROFF HTGR/BWR MECH. ENGR.
E.P. 14 BS PROF. ENGR.
MGR.
E.P. 8 BS PROF. ENGR.
VP -
JS KEMPER SRO - 4 YRS.
ELEC. ENGR.
E&R NONE HTGR 4
20 HTGR/BWR BS PROF. ENGR.
OONEY SRO - 8 YRS.
7 YRS.
U GEN.
O RIDGE L
F HTGR HTGR/BWR DIV. 12 BWR/HTGR REACTOR TECHNOLOGY SUPT. -
W. WHITFIELD MAINT. DIV. 11 BWR/HTGR BS ELEC. ENGR.
SUPT. -
R. MOORE QUAL. ASSUR. 11 BWR/HTGR BS MECH. ENGR.
CHIEF EC KISTNER 18 HTGR/BWR BS PROF. ENGR.
MECH. ENGR.
ME NONE NONE CHIEF ELEC. ENGR.
EE GN DE COWSKY NONE NONE 10 HTGR/nWR BS PROF. ENGR.
ASST.
MECH. ENGR.
CHIEF ME J. ALLEN NONE NONE 22 HTGR/BWR BS PROF. ENGR.
ASST.
ELEC. ENGR.
CHIEF EE G. BRECHT ~
NONE NONE 4 BWR BS PROF. ENGR.
SUPT.
10 YRS. SRO 18 YRS.
1 YR.
NUC. SERV.
WT ULLRICH HTGR HTGR/BWR BWR BS ELEC. ENGR.
EIC -
WM ALDEN HTGR BS MINING ENGR.
LIC. SECT. 8 YRS. - SRO 9 HTGR 9 YRS. - BWR BS CIVIL ENGR.
SUP. ENGR.
4 YRS. - PWR BS MECH. ENGR.
FUEL MGT.
LF RUBINO 17 YRS. - BWR MS NUC. ENGR.
l E _.__. _ __
FACILITY STAFFING SURVEY The attached s'urvey has been prepared to assist in developing the expected staffing profile for your facility that will be in place at the time you are ready to obtain an operating license.
Please fill in the blanks with the best information available.
FACILITY STAFFING SURVEY PLANT LIMERICK UNITS 1& 2 Unit 1 Anticipated Licensing Date August 1, 1984 A.
OPERATING SHIFT 1.
No. of Shifts 6
2.
No of ROs Assigned to Shift Work 18 No. of Yrs. of Commercial RO experiment on BWR PWR Hot plants (post initial criticality) 0 0
3.
No. of SROs Assigned to Snift Work 12 No. of Yrs, of Commerical RO experience on BWR PWR HTGR Hot plants 20 0
13 No. of Yrs. of Commercial SRO experience on BWR PWR Hot plants 20 0
0 4.
No. of SROs with 4-yr. degrees Non-engineering Engineering 0
0 l
S.
No. of Shift Supervisors ($$)
Non-engineering Engineering 0
0 Note:
$$ is senior authority on shift work.
d 1