MONTHYEARL-99-033, Application for Amends to Licenses NPF-2 & NPF-8,to Change TS Re Control Room,Penetration Room & Containment Purge Filtration Sys & Radiation Monitoring Instrumentation,Which Reflect Agreements Reached in 990909 & 16 Discussions1999-10-0404 October 1999 Application for Amends to Licenses NPF-2 & NPF-8,to Change TS Re Control Room,Penetration Room & Containment Purge Filtration Sys & Radiation Monitoring Instrumentation,Which Reflect Agreements Reached in 990909 & 16 Discussions ML20212C5831999-09-15015 September 1999 Application for Amends to Licenses NPF-2 & NPF-8,committing Util to Transfer Certain CTS Requirements Into Util Controlled Documents & Specifying Schedule for Performing New & Revised ITS Surveillances.Revised License Pages,Encl ML20210R5181999-08-12012 August 1999 Revised Page 6 to 990430 LAR to Operate Farley Nuclear Plant,Unit 1,for Cycle 16,based on risk-informed Approach for Evaluation of SG Tube Structural Integrity.Marked Page of Current License,Included L-99-018, Application for Amend to License NPF-2 for Approval to Operate Unit 1,cycle 16 Only,Based on risk-informed Approach for Evaluation of SG Tube Structural Integrity1999-04-30030 April 1999 Application for Amend to License NPF-2 for Approval to Operate Unit 1,cycle 16 Only,Based on risk-informed Approach for Evaluation of SG Tube Structural Integrity L-99-013, Application for Amends to Licenses NPF-2 & NPF-8.Amends Would Increase Dei Limit from 0.15 to 0.3 Uci/Gram IAW 10CFR50.90.Marked-up & Revised Current TS Encl1999-04-0202 April 1999 Application for Amends to Licenses NPF-2 & NPF-8.Amends Would Increase Dei Limit from 0.15 to 0.3 Uci/Gram IAW 10CFR50.90.Marked-up & Revised Current TS Encl ML20155J4391998-11-0606 November 1998 Application for Amends to Licenses NPF-2 & NPF-8,requesting Change to TS Nuclear Instrumentation Sys Power Range Daily Surveillance Requirement ML20154K2451998-10-12012 October 1998 Application for Amends to Licenses NPF-2 & NPF-8,revising Section 6 of TS by Recognizing Addl Mgt Positions Associated with SG Replacement Project & Providing Ability to Approve Procedures Re Project Which May Affect Nuclear Safety ML20216F7051998-03-12012 March 1998 Application for Amends to Licenses NPF-2 & NPF-8 to Revise Existing TS in Entirety.Amend Consists Primarily of Conversion of Current TS to Improved Ts,Per NUREG-1431,rev 1.Vols 1-10 Contain Listed Attachments ML20198H3561998-01-0707 January 1998 Application for Amends to Licenses NPF-2 & NPF-8,adding Note to TS to Specifically Indicate Normal or Emergency Power Supply May Be Inoperable in Modes 5 or 6 Provided That Requirements of TS 3.8.1.2 Are Satisified ML20198E6531997-12-31031 December 1997 Application for Amends to Licenses NPF-2 & NPF-8,changing Nis IR Neutron Flux Reactor Trip Setpoint & Allowable Value to Be Consistent W/W Std TS,NUREG-1431,Rev 1.Proprietary Safety Analysis,Encl.Proprietary Info Withheld ML20198E2891997-12-30030 December 1997 Application for Amends to Licenses NPF-2 & NPF-8,changing Requirements for Auxiliary Bldg & Svc Water Bldg Batteries, Per NRC Staff Concerns as Described in URI 50-348/97-201 & 50-364/97-201 & NOV 50-348/97-11 & 50-364/97-11 ML20211P5811997-10-16016 October 1997 Application for Amends to Licenses NPF-2 & NPF-8,revising Number of Allowable Charging Pumps Capable of Injecting in RCS When Temperature of One or More of RCS Cold Leg Temperatures Is Less than 180 F ML20211A6811997-09-17017 September 1997 Application for Amends to Licenses NPF-2 & NPF-8,amending Primary Coolant Specific Activity,Per GL 95-05 ML20216C9231997-09-0303 September 1997 Application for Amend to License NPF-2,allowing Reduction in Available Paths to Min of 50% w/3 Per Core Quadrant. Non-proprietary & Proprietary W Repts CAA-97-234 & CAA-97-235,encl.Proprietary Info,Withheld ML20149K0971997-07-23023 July 1997 Application for Amends to Licenses NPF-2 & NPF-8,relocating RCS P/T Limits from TS to Proposed PT Limits Rept IAW Guidance Provided by GL 96-03, Relocation of P/T Limit Curves & LTOP Protection Sys Limits ML20148R7351997-06-30030 June 1997 Application for Amends to Licenses NPF-2 & NPF-8, Incorporating Requirements Necessary to Change Basis for Prevention of Criticality in Fuel Storage Pool.Change Eliminates Credit for Boraflex as Neutron Absorbing Matl ML20148Q0981997-06-30030 June 1997 Application for Amends to Licenses NPF-2 & NPF-8,revising & Clarifying Requirements for CR Emergency & Penetration Room Filtration Sys & Related Storage Pool Ventilation Sys & Revises Radiation Monitoring Instrumentation Channels ML20148K7421997-06-13013 June 1997 Application for Amends to Licenses NPF-2 & NPF-8,proposing Changes Found in Tech Specs 3/4.9.13, Storage Pool Ventilation (Fuel Movement) ML20140A3861997-05-28028 May 1997 Application for Amends to Licenses NPF-2 & NPF-8,clarifying That Testing of Each Shared EDG to Comply W/Sr 4.8.1.1.2.e Is Only Required Once Per Five Years on a Per EDG Basis,Not on Per Unit Basis ML20148E5851997-05-27027 May 1997 Application for Amends to Licenses NPF-2 & NPF-8,revising Applicable Modes for Source Range Nuclear Instrumentation & Providing Allowances for an Exception to Requirements for State of Power Supplies for RHR Discharge to Pump Valves ML20138B9161997-04-23023 April 1997 Application for Amends to Licenses NPF-2 & NPF-8,revising Proposed TS Pages to Include Footnote Concerning Filter Pressure Drop Testing & Mechanical Heater Testing ML20137H6011997-03-25025 March 1997 Application for Amend to License NPF-2,requesting Implementation of voltage-based Alternate Repair Criteria, Per GL 95-05 ML20136F8141997-03-0707 March 1997 Application for Amends to Licenses NPF-2 & NPF-8,revising TS 3/4.6.3 Re Containment Isolation Valves Surveillance Requirements ML20135C6511997-02-24024 February 1997 Application for Amends to Licenses NPF-2 & NPF-8,requesting Revision & Clarification to Surveillance Requirements for Control Room Emergency Filtration Sys,Penetration Room Filtration Sys & Containment Purge Exhaust Filter ML20135C8311997-02-14014 February 1997 Application for Amends to Licenses NPF-2 & NPF-8,revising Specified Max Power Level & Definition of Rated Thermal Power ML20138G9451996-12-26026 December 1996 Application for Amends to Licenses NPF-2 & NPF-8,reflecting Guidance in GL 95-05, SG Tube Support Plate Voltage-Based Repair..., to Use Revised Accident Leakage Limit of 20 Gpm & Include 50% of Rpc Ndds in Calculation.W/O Unit 2 TSs ML20134K5501996-11-15015 November 1996 Application for Amends to Licenses NPF-2 & NPF-8,requesting Deletion of TS 3.6.2.2 Re Containment Spray Additive Sys ML20128F8681996-09-30030 September 1996 Application for Amends to Licenses NPF-2 & NPF-8,relocating cycle-specific Core Operating Parameter Limits to Colr. Proposed Changes Based on Guidance Found in NRC GL 88-16, WOG-90-016,NUREG-1431 & VEGP COLR Approved by NRC ML20117G2911996-08-30030 August 1996 Application for Amend to License NPF-8,requesting Deletion of References to Cycle Specific L* Criteria ML20117D2201996-08-23023 August 1996 Application for Amends to Licenses NPF-2 & NPF-8,requesting to Allow Use of Elevated Sleeve ML20113B6931996-06-24024 June 1996 Application for Amends to Licenses NPF-2 & NPF-8,deleting Requirement for Surveillance of Manual SI Input to Reactor Trip Circuitry Until Next Unit Shutdown ML20113A7991996-06-20020 June 1996 Application to Revise Ts,Reflecting Implementation of 10CFR50,App J,Option B & Represent Crossed Beneficial Licensee Actions ML20112G9711996-06-12012 June 1996 Application for Amends to Licenses NPF-2 & NPF-8,providing Improved Operating Margins as Well as Increased Flexibility W/Respect to Core Designs & Plant Operating Strategy. Rev 2 to NSD-NT-OPL-96-152 Withheld ML20107J9551996-04-23023 April 1996 Application for Amend to License NPF-8,requesting Unit 2 Cycle 11 TS Change for SG Tubes Remaining in Svc ML20107J1521996-04-22022 April 1996 Application for Amend to License NPF-8,reflecting Implementation of New F* Criteria Based on Maintaining Existing Safety Margins for SG Tube Structural Integrity Concurrent W/Allowance for NDE Eddy Current Uncertainty ML20101L9041996-03-29029 March 1996 Application for Amend to License NPF-8,revising TS 3/4.4.6, Steam Generators & Associated Bases,Reflecting Guidance in GL 95-05.Responses to GL & Revised TS Encl ML20095L0161995-12-19019 December 1995 Application for Amends to Licenses NPF-2 & NPF-8,revising Tech Specs Section 3/.7.7 Re Control Room Emergency Ventilation Sys ML20098B0911995-09-26026 September 1995 Application for Amends to Licenses NPF-2 & NPF-8,changing TS 4.6.1.3 to Incorporate Improvements to Containment Air Lock Testing Ref in Chapter 3.6,containment Sys of NUREG-1431, Sts,Westinghouse Plants ML20092F3821995-09-15015 September 1995 Application for Amend to License NPF-2 & NPF-8,eliminating Periodic Pressure Sensor Response Time Testing Requirements ML20084P4901995-05-31031 May 1995 Application for Amends to Licenses NPF-2 & NPF-8,revising TS Associated W/Steam Generator Tube Support Plate voltage- Based Repair Criteria ML20080R8201995-03-0606 March 1995 Application for Amends to Licenses NPF-2 & NPF-8,relocating Seismic & Meteorological Monitoring Instrumentation TSs to FSAR ML20078P8331995-02-14014 February 1995 Application for Amend to Licenses NPF-2 & NPF-8 Re Permanent voltage-based Repair Criteria for Outside Diameter Stress Corrosion Cracking at SG Tube Support Plates for Both Units at Plant ML20077R4071995-01-0909 January 1995 Application for Amends to Licenses NPF-2 & NPF-8, Incorporating line-item TS Improvements to Reduce Surveillance Requirements for Testing During Power Operation in Response to GL 93-05 ML20078S7531994-12-19019 December 1994 Application for Amends to Licenses NPF-2 & NPF-8,revising TS Pages for Mssv,Per NRC Information Notice 94-060, Potential Overpressurization of Main Steam Sys ML20077E3461994-12-0707 December 1994 Application for Amends to Licenses NPF-2 & NPF-8,revising TS to Reflect Guidance in Draft GL 94-XX, Voltage-Based Repair Criteria for Repair of Westinghouse SG Tubes Affected by Outside Diameter Stress Corrosion Cracking ML20078B5451994-10-20020 October 1994 Application for Amends to Licenses NPF-2 & NPF-8,proposing TS 3/4.3.3.6 & Associated Bases,Which Will Delete Requirements for Chlorine Detection Sys from Units 1 & 2 TS ML20072F3401994-08-17017 August 1994 Application for Amends to Licenses NPF-2 & NPF-8,eliminating Periodic Pressure Sensor Response Time Testing Requirements. Rev 1 to WCAP-13787 & Proprietary Rev 1 to WCAP-13632, Elimination of Pressure... encl.WCAP-13632,Rev 1 Withheld ML20070A1001994-06-17017 June 1994 Application for Amend to License NPF-2,revising TS 3/4.2.3 to Increase Nuclear Enthalpy Rise Hot Channel Factor Limit from 1.65 to 1.70 for Vantage 5 Fuel,In Order to Provide Greater Flexibility in Farley Unit 1 Core Design ML20069K2781994-06-10010 June 1994 Application for Amends to Licenses NPF-2 & NPF-8,changing RTS & ESFAS Setpoints Associated W/Sg Water Level. Westinghouse Nonproprietary & Proprietary Version of Rept, SG Lower Level Tap... Encl.Proprietary Rept Withheld ML20064C2111994-02-23023 February 1994 Application for Amend to License NPF-2,revising TS, to Allow Implementation of 2 Volt Interim Plugging Criteria 1999-09-15
[Table view] Category:TEXT-LICENSE APPLICATIONS & PERMITS
MONTHYEARL-99-033, Application for Amends to Licenses NPF-2 & NPF-8,to Change TS Re Control Room,Penetration Room & Containment Purge Filtration Sys & Radiation Monitoring Instrumentation,Which Reflect Agreements Reached in 990909 & 16 Discussions1999-10-0404 October 1999 Application for Amends to Licenses NPF-2 & NPF-8,to Change TS Re Control Room,Penetration Room & Containment Purge Filtration Sys & Radiation Monitoring Instrumentation,Which Reflect Agreements Reached in 990909 & 16 Discussions ML20212C5831999-09-15015 September 1999 Application for Amends to Licenses NPF-2 & NPF-8,committing Util to Transfer Certain CTS Requirements Into Util Controlled Documents & Specifying Schedule for Performing New & Revised ITS Surveillances.Revised License Pages,Encl ML20210R5181999-08-12012 August 1999 Revised Page 6 to 990430 LAR to Operate Farley Nuclear Plant,Unit 1,for Cycle 16,based on risk-informed Approach for Evaluation of SG Tube Structural Integrity.Marked Page of Current License,Included L-99-018, Application for Amend to License NPF-2 for Approval to Operate Unit 1,cycle 16 Only,Based on risk-informed Approach for Evaluation of SG Tube Structural Integrity1999-04-30030 April 1999 Application for Amend to License NPF-2 for Approval to Operate Unit 1,cycle 16 Only,Based on risk-informed Approach for Evaluation of SG Tube Structural Integrity L-99-013, Application for Amends to Licenses NPF-2 & NPF-8.Amends Would Increase Dei Limit from 0.15 to 0.3 Uci/Gram IAW 10CFR50.90.Marked-up & Revised Current TS Encl1999-04-0202 April 1999 Application for Amends to Licenses NPF-2 & NPF-8.Amends Would Increase Dei Limit from 0.15 to 0.3 Uci/Gram IAW 10CFR50.90.Marked-up & Revised Current TS Encl ML20155J4391998-11-0606 November 1998 Application for Amends to Licenses NPF-2 & NPF-8,requesting Change to TS Nuclear Instrumentation Sys Power Range Daily Surveillance Requirement ML20154K2451998-10-12012 October 1998 Application for Amends to Licenses NPF-2 & NPF-8,revising Section 6 of TS by Recognizing Addl Mgt Positions Associated with SG Replacement Project & Providing Ability to Approve Procedures Re Project Which May Affect Nuclear Safety ML20216F7051998-03-12012 March 1998 Application for Amends to Licenses NPF-2 & NPF-8 to Revise Existing TS in Entirety.Amend Consists Primarily of Conversion of Current TS to Improved Ts,Per NUREG-1431,rev 1.Vols 1-10 Contain Listed Attachments ML20198H3561998-01-0707 January 1998 Application for Amends to Licenses NPF-2 & NPF-8,adding Note to TS to Specifically Indicate Normal or Emergency Power Supply May Be Inoperable in Modes 5 or 6 Provided That Requirements of TS 3.8.1.2 Are Satisified ML20198E6531997-12-31031 December 1997 Application for Amends to Licenses NPF-2 & NPF-8,changing Nis IR Neutron Flux Reactor Trip Setpoint & Allowable Value to Be Consistent W/W Std TS,NUREG-1431,Rev 1.Proprietary Safety Analysis,Encl.Proprietary Info Withheld ML20198E2891997-12-30030 December 1997 Application for Amends to Licenses NPF-2 & NPF-8,changing Requirements for Auxiliary Bldg & Svc Water Bldg Batteries, Per NRC Staff Concerns as Described in URI 50-348/97-201 & 50-364/97-201 & NOV 50-348/97-11 & 50-364/97-11 ML20198R5181997-10-29029 October 1997 Amends 132 & 124 to Licenses NPF-02 & NPF-08,respectively, Changing TS 3/4.4.9, Specific Activity & Associated Bases to Reduce Limit Associated W/Dose Equivalent iodine-131 ML20211P5811997-10-16016 October 1997 Application for Amends to Licenses NPF-2 & NPF-8,revising Number of Allowable Charging Pumps Capable of Injecting in RCS When Temperature of One or More of RCS Cold Leg Temperatures Is Less than 180 F ML20211A6811997-09-17017 September 1997 Application for Amends to Licenses NPF-2 & NPF-8,amending Primary Coolant Specific Activity,Per GL 95-05 ML20216C9231997-09-0303 September 1997 Application for Amend to License NPF-2,allowing Reduction in Available Paths to Min of 50% w/3 Per Core Quadrant. Non-proprietary & Proprietary W Repts CAA-97-234 & CAA-97-235,encl.Proprietary Info,Withheld ML20149K0971997-07-23023 July 1997 Application for Amends to Licenses NPF-2 & NPF-8,relocating RCS P/T Limits from TS to Proposed PT Limits Rept IAW Guidance Provided by GL 96-03, Relocation of P/T Limit Curves & LTOP Protection Sys Limits ML20148R7351997-06-30030 June 1997 Application for Amends to Licenses NPF-2 & NPF-8, Incorporating Requirements Necessary to Change Basis for Prevention of Criticality in Fuel Storage Pool.Change Eliminates Credit for Boraflex as Neutron Absorbing Matl ML20148Q0981997-06-30030 June 1997 Application for Amends to Licenses NPF-2 & NPF-8,revising & Clarifying Requirements for CR Emergency & Penetration Room Filtration Sys & Related Storage Pool Ventilation Sys & Revises Radiation Monitoring Instrumentation Channels ML20148K7421997-06-13013 June 1997 Application for Amends to Licenses NPF-2 & NPF-8,proposing Changes Found in Tech Specs 3/4.9.13, Storage Pool Ventilation (Fuel Movement) ML20140A3861997-05-28028 May 1997 Application for Amends to Licenses NPF-2 & NPF-8,clarifying That Testing of Each Shared EDG to Comply W/Sr 4.8.1.1.2.e Is Only Required Once Per Five Years on a Per EDG Basis,Not on Per Unit Basis ML20148E5851997-05-27027 May 1997 Application for Amends to Licenses NPF-2 & NPF-8,revising Applicable Modes for Source Range Nuclear Instrumentation & Providing Allowances for an Exception to Requirements for State of Power Supplies for RHR Discharge to Pump Valves ML20138B9161997-04-23023 April 1997 Application for Amends to Licenses NPF-2 & NPF-8,revising Proposed TS Pages to Include Footnote Concerning Filter Pressure Drop Testing & Mechanical Heater Testing ML20137H6011997-03-25025 March 1997 Application for Amend to License NPF-2,requesting Implementation of voltage-based Alternate Repair Criteria, Per GL 95-05 ML20137E2891997-03-24024 March 1997 Amends 125 & 119 to Licenses NPF-2 & NPF-8,respectively, Revising TS to Incorporate Latest Revised Topical Repts Governing Installation of Laser Welded SG Tube Sleeves ML20136F8141997-03-0707 March 1997 Application for Amends to Licenses NPF-2 & NPF-8,revising TS 3/4.6.3 Re Containment Isolation Valves Surveillance Requirements ML20135C6511997-02-24024 February 1997 Application for Amends to Licenses NPF-2 & NPF-8,requesting Revision & Clarification to Surveillance Requirements for Control Room Emergency Filtration Sys,Penetration Room Filtration Sys & Containment Purge Exhaust Filter ML20135C8311997-02-14014 February 1997 Application for Amends to Licenses NPF-2 & NPF-8,revising Specified Max Power Level & Definition of Rated Thermal Power ML20138G9451996-12-26026 December 1996 Application for Amends to Licenses NPF-2 & NPF-8,reflecting Guidance in GL 95-05, SG Tube Support Plate Voltage-Based Repair..., to Use Revised Accident Leakage Limit of 20 Gpm & Include 50% of Rpc Ndds in Calculation.W/O Unit 2 TSs ML20134K5501996-11-15015 November 1996 Application for Amends to Licenses NPF-2 & NPF-8,requesting Deletion of TS 3.6.2.2 Re Containment Spray Additive Sys ML20128F8681996-09-30030 September 1996 Application for Amends to Licenses NPF-2 & NPF-8,relocating cycle-specific Core Operating Parameter Limits to Colr. Proposed Changes Based on Guidance Found in NRC GL 88-16, WOG-90-016,NUREG-1431 & VEGP COLR Approved by NRC ML20117G2911996-08-30030 August 1996 Application for Amend to License NPF-8,requesting Deletion of References to Cycle Specific L* Criteria ML20117D2201996-08-23023 August 1996 Application for Amends to Licenses NPF-2 & NPF-8,requesting to Allow Use of Elevated Sleeve ML20113B6931996-06-24024 June 1996 Application for Amends to Licenses NPF-2 & NPF-8,deleting Requirement for Surveillance of Manual SI Input to Reactor Trip Circuitry Until Next Unit Shutdown ML20113A7991996-06-20020 June 1996 Application to Revise Ts,Reflecting Implementation of 10CFR50,App J,Option B & Represent Crossed Beneficial Licensee Actions ML20112G9711996-06-12012 June 1996 Application for Amends to Licenses NPF-2 & NPF-8,providing Improved Operating Margins as Well as Increased Flexibility W/Respect to Core Designs & Plant Operating Strategy. Rev 2 to NSD-NT-OPL-96-152 Withheld ML20107J9551996-04-23023 April 1996 Application for Amend to License NPF-8,requesting Unit 2 Cycle 11 TS Change for SG Tubes Remaining in Svc ML20107J1521996-04-22022 April 1996 Application for Amend to License NPF-8,reflecting Implementation of New F* Criteria Based on Maintaining Existing Safety Margins for SG Tube Structural Integrity Concurrent W/Allowance for NDE Eddy Current Uncertainty ML20101L9041996-03-29029 March 1996 Application for Amend to License NPF-8,revising TS 3/4.4.6, Steam Generators & Associated Bases,Reflecting Guidance in GL 95-05.Responses to GL & Revised TS Encl ML20095L0161995-12-19019 December 1995 Application for Amends to Licenses NPF-2 & NPF-8,revising Tech Specs Section 3/.7.7 Re Control Room Emergency Ventilation Sys ML20098B0911995-09-26026 September 1995 Application for Amends to Licenses NPF-2 & NPF-8,changing TS 4.6.1.3 to Incorporate Improvements to Containment Air Lock Testing Ref in Chapter 3.6,containment Sys of NUREG-1431, Sts,Westinghouse Plants ML20092F3821995-09-15015 September 1995 Application for Amend to License NPF-2 & NPF-8,eliminating Periodic Pressure Sensor Response Time Testing Requirements ML20084P4901995-05-31031 May 1995 Application for Amends to Licenses NPF-2 & NPF-8,revising TS Associated W/Steam Generator Tube Support Plate voltage- Based Repair Criteria ML20080R8201995-03-0606 March 1995 Application for Amends to Licenses NPF-2 & NPF-8,relocating Seismic & Meteorological Monitoring Instrumentation TSs to FSAR ML20078P8331995-02-14014 February 1995 Application for Amend to Licenses NPF-2 & NPF-8 Re Permanent voltage-based Repair Criteria for Outside Diameter Stress Corrosion Cracking at SG Tube Support Plates for Both Units at Plant ML20077R4071995-01-0909 January 1995 Application for Amends to Licenses NPF-2 & NPF-8, Incorporating line-item TS Improvements to Reduce Surveillance Requirements for Testing During Power Operation in Response to GL 93-05 ML20078S7531994-12-19019 December 1994 Application for Amends to Licenses NPF-2 & NPF-8,revising TS Pages for Mssv,Per NRC Information Notice 94-060, Potential Overpressurization of Main Steam Sys ML20077E3461994-12-0707 December 1994 Application for Amends to Licenses NPF-2 & NPF-8,revising TS to Reflect Guidance in Draft GL 94-XX, Voltage-Based Repair Criteria for Repair of Westinghouse SG Tubes Affected by Outside Diameter Stress Corrosion Cracking ML20078B5451994-10-20020 October 1994 Application for Amends to Licenses NPF-2 & NPF-8,proposing TS 3/4.3.3.6 & Associated Bases,Which Will Delete Requirements for Chlorine Detection Sys from Units 1 & 2 TS ML20072F3401994-08-17017 August 1994 Application for Amends to Licenses NPF-2 & NPF-8,eliminating Periodic Pressure Sensor Response Time Testing Requirements. Rev 1 to WCAP-13787 & Proprietary Rev 1 to WCAP-13632, Elimination of Pressure... encl.WCAP-13632,Rev 1 Withheld ML20070A1001994-06-17017 June 1994 Application for Amend to License NPF-2,revising TS 3/4.2.3 to Increase Nuclear Enthalpy Rise Hot Channel Factor Limit from 1.65 to 1.70 for Vantage 5 Fuel,In Order to Provide Greater Flexibility in Farley Unit 1 Core Design 1999-09-15
[Table view] |
Text
_. -
Mrihng Addrsts
, Alabama Power Company
. 600 North 18th Street Post Office Box 2641 Birmingham, Alabama 35291 Telephone 205 783-6081 F. L. Clayton, Jr.
Senior %ce President December 12, 1983 Fhntridge Building A abamaPower we soun:m enc g,wm l
Docket Nos. 50-348 50-364 Director, Nuclear Reactor Regulation U. S. Nuclear Regulatory Commission Washington, D.C. 20555 Attention: Mr. S. A. Yarga Joseph M. Farley Nuclear Plant - Units 1 and 2 Response to Generic Letter 83-37, NUREG-0737 Technical Specifications Gentlemen:
NRC Generic Letter 83-37, dated November 1,1983, requested submittal of certain technical specification changes based on NUREG-0737 items scheduled for completion after December 31, 1981. In response to that request, Alabama Power Company herewith submits proposed technical specification changes based on the guidance in Generic Letter 83-37.
Attachment 1 contains a response to each of the NUREG-0737 items listed in Enclosure 1, " Staff Guidance on Technical Specifications for NUREG-0737 Items Scheduled Af ter December 31, 1981," to Generic Letter 83-37. Attachment 2 contains the proposed technical specification changes for Farley Nuclear Plant, Units 1 and 2.
The proposed changes do not involve a significant hazards consideration as defined in 10CFR50.92. These changes are similar to example (ii) of " Examples of Amendments That Are Considered Not Likely to Involve Significant Hazards Considerations" listed in 48FR14870 dated April 6, 1983. These changes are similar in that an additional limitation, restriction and control not presently included in the technical specifications are involved. Additionally, the proposed changes are in accordance with NRC guidance contained in Generic Letter 83-37.
The Plant Operations Review Committee has reviewed this proposed change. The Nuclear Operations Review Board will review this change at a future meeting.
8312210117 831212 a PDR ADOCK 05000 g WOW 9%400
, m Mr. S. A. Varga December 12, 1983 U. S. Nuclear Regulatory Commission Page 2 l
l The class of this proposed technical specification change is designated as Class III for Unit 1 and Class I for Unit 2 in a*cordance with 10CFR170.22 requirements and a check for $4,400 to cover the fee required is enclosed. This proposed change is being made at the request of the NRC and does not involve an impact on plant operation. Since the reactor vessel head vent system is not currently operational, NRC is requested to approve the enclosed Technical Specification changes by July 1,1984 with the provision that the effective date for proposed Technical Specification 3/4.4.12 is no earlier than prior to entry into Mode 1 following the third refueling outage at Unit 2. This schedule is compatible with Alabama Power Company's plan to make the vent system operational as will be described in a letter scheduled for submittal on December 15, 1983.
In accordance with 10CFR50.30 (c)(1)(1), three (3) signed originals and forty (40) additional copies of this proposed change are enclosed.
As noted by the distribution, a copy of this letter is being sent to the Alabama State Designee in accordance with 10CFR50.91 (b)(1).
If you have any questions, please advise.
Yours very tru ,
$N hN. L. Clayton, Jr.
FLCJ r/GGY:lsh-D13 SWORN TO AND SUBSCRIBED BEFORE ME Attachments THIS 10 tb DAY OFdeadge,-1983 cc: Mr. R. A. Thr; mas Mr. G. F. Trowbridge Mr. J. P. O'Reilly clCv NM Notary Public Mr. E. A. Reeves Mr. W. H. Bradford Dr. I. L. Myers My Commission Expires: l-lb 47
bc: Mr. W. O. Whitt '
Mr. R. P. Mcdonald Mr. H. O. Thrash M r. O. D. Ki n gsl ey , J r.
Mr. W. G. Hai rston, III Mr. J. W. McGowan i Mr. C. D. Nesbitt Mr. R. G. Berryhill Mr. D. E. Mansfield Mr. J. A. Ripple Mr. W. G. Ware Mr. L. B. Long Mr.-B. J. George Mr. J. R. Crane Mr. K. C. Gandhi Reference Listing i
i i
I
l ATTACHMENT 1 l RESPONSES TO ENCLOSURE 1 0F GENERIC LETTER 83-37
- 1) Reactor Coolant System Vents NRC Guidance At least one reactor coolant system vent path (consisting of at least two valves in series which are powered from emergency buses) shall be operable and closed at all times (except shutdown and refueling) at each of the following locations:
a) Reactor Vessel Head b) Pressurizer Steam Space c) Reactor Coolant System High Point.
For the plants using a power operated relief valve (PORV) as a reactor coolant system vent, the block valve is not required to be closed if the PORV is operable.
APCo Response Alabama Power Company's compliance with NUREG-0737 item II.B.1 is described in letters dated January 14,1981, June 25,1981 and April 30, 1982. Of the three locations mentioned in the above guidance, only the Reactor Yessel Head is applicable to Farley Nuclear Plant for this technical specification. Pressurizer steam space is covered by an existing technical specification, and Farley Nuclear Plant does not have a Reactor Coolant System High Point l separate from the Reactor Yessel Head. Alabama Power Company's compliance with the NRC's guidance for Reactor Coolant System Vents (for all applicable locations and plant specific differences) is described in Attachment 2.
- 2) Post-Accident Sampling NRC Guidance Licensees should ensure that their plant has the capability to obtain and analyze reactor coolant and containment atmosphere samples under accident conditions. An administrative program should be established, implemented and maintained to ensure this capability. The program should include:
a) training of personnel b) procedures for sampling and analysis, and c) provisions for maintenance of sampling and analysis equipment.
l t
Attachment 1 Responses to Enclosure 1 of Generic Letter 83-37 Page 2 It is acceptable to the Staff, if the licensee elects to reference this program ,in the administrative controls section of the Technical Specifications and include a detailed description of the program in the plant operation manuals. A copy of the program should be easily available to the operating staff during accident and transient conoitions.
APCo Response The current Farley Nuclear Plant Technical Specification is in accordance with the NRC's guidance.
- 3) Long Term Auxiliary Feedwater System Evaluation NRC Guidance The objective of this item is to improve the reliability and performance of the auxiliary feedwater ( AFW) system. Technical Specifications depend on the results of the licensee's evaluation and staff review of each plant. The limiting conditions of operation (LCO) and surveillance requirements for the AFW system should be similar to safety-related systems. These specifications are for a plant which has three auxiliary feedwater pumps. Pl ant-specific Technical Specifications could be established by using the I generic Technical Specifications for the AFW system.
APCo Response Tne current Farley Nuclear P1 ant Technical Specification is technically in accordance with the NRC's guidance; however, there are minor editorial differences in that the FNP Technical i Specification includes inservice testing as a part of another l Technical Specification. No modifications are planned for this l Technical Specification.
l l 4) Noble Gas Effluent Monitors NRC Guidance Noble gas effluent monitors provide information, during and following an accident, which is considered helpful to the operator in assessing the plant condition. It is desired that these monitors be operable at all times during plant operation, but they are not required for safe shutdown of the plant. In case of i
failure of the monitor, appropriate actions should be taken to l restore its operational capability in a reasonable period of time.
Considering the importance of the availability of the equipment and l
possible delays involved in administrative controls, 7 days is considered to be the appropriate time period to restore the operability of the monitor. An alternate method for monitoring the effluent should be initiated as soon as practical, but no later than 72 hours8.333333e-4 days <br />0.02 hours <br />1.190476e-4 weeks <br />2.7396e-5 months <br /> after the identification of the failure of the monitor. If the monitor is not restored to operable conditions
Attachment 1 R;sp:ns s to Enclosure 1 of Generic letter 83-37 Page 3 l l
within 7 days after the failure, a special report should be i submitted to the NRC within 14 days following the event, outlining I the cause of inoperability, actions taken and the planned schedule i for restoring the system to operable status.
APCo Response In accordance with NRC guidance, the proposed Technical Specification is included in Attachment 2.
- 5) Sampling and Analysis of Plant Effluents NRC Guidance Each operating nuclear power reactor should have the capability to collect and analyze or measure representative samples of radioactive iodines and particulates in plant gaseous effluents during and following an accident. An administrative program should be established, implemented and maintained to ensure this capability. The program should include:
a) training of personnel b) procedures for sampling and analysis, and c) provisions for maintaining of sampling and analysis equipment.
lt is acceptable to the staff, if the licensee elects to reference this program in the administrative controls section of the Technical Specifications and include a detailed description of the program in the plant operation manuals. A copy of the progrzm should be readily available to the operating staff during accident and transient conditions.
APCo Response The current Farley Nuclear Plant Technical Specification is in accordance with the NRC's guidance.
- 6. The Containment High-Range Radition Monitor NRC Guidance A minimum of two in-contair. ment radiation-level monitors with a maximum range of 108 rad /hr (107 R/hr for photon only) should be operable at all times except for cold shutdown and refueling outages. In case of failure of the monitor, appropriate actions should be taken to restore its operational capability as soon as possible. If the monitor is not restored to operable condition within 7 days after the failure, a special report should be
I .
Attachment 1 Responses t3 Encicsure 1 of Generic Letter 83-37 Page 4 submitted to the NRC within 14 days following the event, outlining the cause of inoperability, actions taken and the planned schedule for restoring the equipment to operable status. The setpoint for the high radiation level alarm should be determined such that spurious alarms will be precluded. Note that the acceptable calibration techniques for these monitors are discussed in NUREG-0737.
APCo Response The current Farley Nuclear Plant Technical Specification is in accordance with the NRC's guidance.
- 7) Containment Pressure Monitor NRC Guidance Containment pressure should be continuously indicated in the control room of each operating reactor during Power Operation, Startup and Hot Standby modes of operation. Two channels should be operable at all times when the reactor is operating in any of the above mentioned modes. Technical Specifications for these monitors should be included with other accident monitoring instrumentation in the present Technical Specifications. Limiting conditions for operation (including the required Actions) for the containment pressure monitor should be similar to other accident monitoring instrumentation included in the present Technical Specifications.
APCo Response The current Farley Nuclear Plant Technical Specification is in accordance with the NRC's guidance.
- 8) Containnent Water Level Monitor NRC Guidance A continuous indication of containment water level should be provided in the control room of each reactor during Power Operation, Startup and Hot Standby modes of operation. At least one channel for narrow range and two channels for wide range instruments should be operable at all times when the reactor is operLting in any of the above modes. Narrow range instruments should cover the range from the bottom to the top of the containment sump. Wide range instruments should cover the range from the bottom of the containment to the elevation equivalent to a 600,000 gallon (or less if justified) capacity. Technical Specifications for containment water level monitors should be included with other accident monitoring instrumentation in the present Technical Specifications. LCOs (including the required
- - _ - ___ __ \
Attachment 1 Resp:nses to Enclosure 1 of Generic Letter 83-37 Page 5 Actions) for wide range monitors should be similar to other accident monitoring instrumentation included in the present Technical Specifications. LCOs for narrow range monitors should include the requirement that the inoperable channel will be restored to operable status within 30 days or the plant will be brought to Hot Shutdown condition as required for other accident monitoring instrumentation.
APCo Response Alabama Power Company's compliance with the NRC's guidance is provided in Attachment 2.
- 9) Containment Hydrogen Monitor NRC Guidance Two independent containment hydrogen monitors should be operable at all times when the reactor is operating in Power Operation or Startup modes. LC0 for these monitors should include the requirement that with one hydrogen monitor inoperable, the monitor should be restored to operable status within 30 days or the plant should be brought to at least a hot standby conaition within the next 6 hours6.944444e-5 days <br />0.00167 hours <br />9.920635e-6 weeks <br />2.283e-6 months <br />. If both monitors are inoperable, at least one monitor should be restored to operable status within 72 hours8.333333e-4 days <br />0.02 hours <br />1.190476e-4 weeks <br />2.7396e-5 months <br /> or the plant should be brought to at least hot standby condition within the next 6 hours6.944444e-5 days <br />0.00167 hours <br />9.920635e-6 weeks <br />2.283e-6 months <br />.
APCo Response Alabama Power Company's compliance with the NRC's guidance is described in Attachment 2; however, there are plant-specific differences involving the surveillance requirements. The existing Farley surveillance requirements have provided acceptable demonstration of hydrogen monitor operability for a number of years. The difference in sample gases is based on the plant specific zero and span gas currently used at Farley Nuclear Plant.
- 10) Instrumentation for Detection of Inadequate Core Cooling NRC Guidance Subcooling margin monitors, core exit thermocouples, and a reactor coolant inventory tracking system (e.g., differential pressure measurement system designed by Westinghouse, Heated Junction Themocouple System designed by Combustion Engineering, etc.) may be used to provide indication of the approach to, existence of, and recovery from inadequate core cooling (ICC). This instrumentation should be operable during Power Operation, Startup and Hot Shutdown modes of operation for each reactor.
. Attachment 1 Resptnses to Enclosure 1 of Generic Letter 83-37 Page 6 Subcooling margin monitors should have already been included in the present Technical Specifications. Technical Specifications for core exit thermocouples and the reactor coolant inventory tracking system should be included with other accident monitoring instrumentation in the present Technical Specifications. Four core-exit thermocouples in each core quadrant and two channels in the reactor coolant inventory tracking system 3re required to be operable when the reactor is operating in any of the above mentioned modes. A minimum of two core-exit thermocouples in each quadrant and one channel in the reactor coolant invencory tracking system should be operable at all times when the reactor is operating in any of the above mentioned modes.
APCo Response Alabama Power Company's current Technical Specification conforms with the NRC guidance except that Farley Nuclear Plant does not have a reactor coolant inventory tracking system. As stated in letter dated March 10, 1983, Alabama Power Company is awaiting NRC approval of an operating system prior to installation of an inventory tracking system at Farity Nuclear Plant.
- 11) Control Room Habitability Requirements NRC Guidance Licensee should ensure that control room operators will be adequately protected against the effects of the accidental release of toxic and/or radioactive gases and that the nuclear power plant can be safely operated or shutdown under design basis accident conditions. If the results of the analyses of postulated accider.tal release of toxic gaces (at or near the plant) indicate any need for installing the toxic gas detection system, it should be included in the Technical Specifications. All detection systems should be included in the Technical Specifications. In addition to the above requirements, other aspects of the control room habitability requirements should be included in the Technical Specifications for the control room emergency air cleanup systems should be operable continuously during all modes of plant operation and capable of meeting design requirements.
APCo Response Alabama Power Company's current Technical Specification conforms with the NRC guidance except for plant-specific design differences since Farley Nuclear Plant does not have a filter bypass system.
Other differences involve actual plant design values such as control room air temperature. No modifications are planned for this Technical Specification.
.