OPERATING DATA REPORT DOCKET No. 50-369 DATE 12-15-83 COMPLETED BY J. A. Reavis TELEPHONE 704-373-7567 OPERATING STATUS Notes
- NOTE:
Nameplate Rating McGuire Unit 1
. l. Unit Name:
(Gross MWe) calculated as
'2. Reporting Period: Novesnher 1.1983-November 30. 1983 1450.000 MVA x.90 power 3411
' 3. Licensed Thennal Power iMWo:
1305*
.l. Nameplate Rating (Grow MWe):
N
-0 0.
^
1180
- 5. Design Electrical RatingINet alwel:
- 6. Maximum Dependsble Capacity (Grow 31We):
1180
- 7. Maximum Dependable Capacity (Net MWe):
S. If Changes occur in capacity Rating titems Number 3 Through 7)Since Lad Report.Gise Reasons:
- 9. Power Level To which Restricted.If Any (Net MWe):
- 10. Res>ons For Restrictions. If Any:
This Month Yr..to.Dste Cumuistive 720.0 8 016.0 17 520.0
!!. Hours in Reporting Period 540.3 4 237.5 11 375.6
- 12. Number Of Hours Reactor was Critical
- 13. Reactor Reserve Shutduwn Hours 532.0 4 169.5 11 261.8
- 14. Hours Generstnr On.Line
- 15. Unit Resene Shutdown Hours
- 16. Gross Thermal Energy Generated (MWH) 1 623 905 11 023 764 75 425 6R7
- 17. Gross Electrical Energy Generated (MWH) 574 272 4 176 661 8 803 252 IS. Net Electrical Energy Generated (MWH) 548 076 3 950 543 8 271 866
- 19. Unit Senice Fsetor 73.9 52.0 64.3
- 20. Unit Availability Factor 73.9 52.0 64.3
- 21. Unit Capacity Factor IUsing MDC Nett 64.5 41.8 40.0 64.5 41.8 40.0
- 22. Unit Capacity Factor IUsing DER Net) 0.6 19.1 21.2
- 23. Unit Forced Outage Rate c_
- 24. Shutdowns Scheduled Oser Nest 6 Months IType.Dste.and Duration uf Eschi:
Refueling - February 26. 1984 - 7 Weeks-
- 25. If Shut Down At End Of Itepo. l'crind. Estimated Date of Startup:
- 26. Units in Test Ststus tPrior io Cununercial Operation):
Fnrecast Achiesed INITI A L CRITICA LiTY
, INITIAL ELEClRICITY COMMEltCIA L Opt'.R A flON O
gof7;3 R
J
AVERAGE D AILY L* NIT ?OWER LEVEL 50-369 DCCKET NO.
'gyg7 McGuire Unit 1 04TE 12-15-83 COMPLETED BY J. A. Reavis l
TELEPHONE 704-373-7567 310 NTH Novanber,1983 DAY AVERAGE DAILY ?OWER LEVEL DAY AVERAGE DAILY POWER LEVEL (5the-Ned i3 we.Neu g
1106 g.
2 1125 g3 3
1113 gg 4
1084 20 132 5
1084 930 6
1060 n
1042 969 1074
,3 3
1088 1075 4
9 1085 1075
,j 10 1085 25 1075 11 1017 1075 458 3
1096 13 1111
- 9 1027 14 30 15 31 16 INSTRL'CTICNS Cn t.".is icr: st,ilst :he v.er:ge j:t!y ;n:: ;.$wer :evet :a twe.3e :;r,:e, ::.. -.,,...,;.
et,
.: nearnt.vheie. ep.,:::
.o - i
50~369' DOCKET ND.'.
UNITSilUTDOWNS ANI) POWER REDUC 110NS UNIT NAhlE MCGuire 1 DATE 12/15/83 Coh 0
REPORT AIONTil November 1983 7b 3 -
7 (p0 l
.I e.
c
,-r,
'j%
Canse & Ceurective
.!?.
3*
h.E 5 Licensee E
No.
Date
.. g 5 g' j g 5-Event y,y e-?
Actiam to H
gE jii;g g Repost 8.
in O UU Prevent Recurrence o
g l
A CC VALVEX
- 4 governor valve isolated.
j 37-P 83-11-01 F
38-P 83-11-01 F
A CC VALVEX
- 4 governor valve isolated, elevated l
temperature.
39-P 83-11-03 F
A CC VALVEX
- 4 governor valva isolated.
40-P 83-11-07 F
A SB PUMPXX Repair mister pump to reduce' lower containment temperature.
A CC VALVEX
- 4 governor valve isolated.
41-P 83-11-07 F
19 83-11-12 5
184.62 H-1 XX ELECON Seal electrical connections'in containment.
20 83-11-20 F
3.42 A
HA CKTBRK Generator breaker 1A opened due to malfunctioning relay. Reactor remained critical.
42-P 83-11-20 F
B lE ZZZZZZ Incore/Excore calibratidn due to realigned power range detector.
I I
2 3
4 F: ForceJ Reason:
Meilugi:
Exhibit G Instructiims S: Scheduled A Eiluipmeni Failure (Explain) 1 Manual for Preparation of Dasa 11 hlaintenance of Test'
~
2 Manual Scram.
linary Slicens for I.ieensee C Refueling 1 Automatic Scram.
livent Report (1 l!R) File INtlREG.
D Itegulatory Restriction 1 Other (lixplain) 0161) l I?-Opeintur Training & l.icenso finaminstlim F Administrative 5
l G-Operationat lirror (lixplain)
Exhibit I Same Source
-19/77)
Il-Other (lixplain)
50-369 LINil SillfillOWNS AND l't)Wl R HlillurilONS DOCKET NO.
UNIT NAhtE _McGuire.l.
!)A'I E 12/15/83 H El'U R I hlO N~Ill November, 1983 COMI'LE1ED isy J. A. Reavis TELEl'il0NE 704-373-7567
i 3
=
nn -
hieiln.il:
Exhibit C. Instinctions S S licilieleil A.Iigniginieni I;ailuie iI siil.nn)
I hl.iini.il
-,,, gi,eg,.,,a ii,,,,,,g Da t a 11 hiaintenince un l'est 2.Al.snu.nl Seraisi.
Ents) Sheets lin 1.icesisce C Iteinclinr.
1 Antin i.itic Scrani.
livent Regiini gl.liltl 1 ile (NilRI.G-li Res;nlatin) Itc>isi,inen
..Oilies g Lxi.1,iisit ol g,1 y I Ogiciaans is.uning;.1 liccin. I xanunasi..n l' Aihnenisti.iinve 3
G Ogies.stional I is..: IINg.lanil gj.shiliit I Saisie S iiiss s-I'8/11) 11 Oihes (lixiii.inil
.r DOCKET N0:
50-369 UNIT:
-McGuire 1 DATE:
12/15/83 NARRATIVE
SUMMARY
' Month:
November,1983 McGuire unit 1 entered' the month limited to between 93 and 96 percent power due to problems with the number-4 governor valve. Repairs will be completed in the re-fueling outage next-spring.
Power was also reduced on the 7th to repair a lower containment mister pump used to help control lower containment temperature.
The unit was shutdown on the 12th. to seal electrical connections within the
-reactor building and returned to service on-the 20th. The turbine-generator tripped about three hours after being placed on-line. The cause was a danaged relay operating the 1A generator breaker. The reactor was not shutdown and the unit returned to service within 31 hours3.587963e-4 days <br />0.00861 hours <br />5.125661e-5 weeks <br />1.17955e-5 months <br />.
-Incore/Excore Nuclear Instrumentation was calibrated on November 20 and 21-requiring power output to be reduced.
McGuire 1 ended the month at 50% while repairs were being made to the IB feed-water pump control oil system.
i
s f
MONTHLY REFUELIEG INFORMATION REQUEST McGuire Unit 1 1.
Facility name:
February
, 1984 2.
Scheduled next refueling shutdown:
3.
Scheduled restart following refueling:
April., 1984 4.
Will refueling or resumption of operation thereafter require a technical Yes specification change or other license amendment?
If yes, what will these be?
Technical Specification change needed to support transition to optimized fuel.
If no, has reload design and core configuration been reviewed by Safety Review Committee regarding unreviewed safety questions?
No 5.
Scheduled date(s) for submitting proposed licensing action and supporting information:
December 12, 1983 6.
Important licensing considerations (new or different design or supplier, unreviewed design or performance analysis methods, significant changes in design or new operating procedures).
Optimized fuel to be used.
Improved thermal design procedure used in safety analysis.
7.
Number of fuel assemblies (a) in the core:
193 (b) in the spent fuel pool:
31 8.
Present licensed fuel pool capacity:
500 Size of requested or planned increase:
9.
Projected date of last refueling which can be accommodated by present licensed capacity:
DUKE POWER COMPANY Date:
December 15, 1983 Name or
Contact:
J. A. Reavis Phone: 704-373-7567 _
1 OPERATING DATA REPORT DOCKET NO.
50-369
' CORRECTED COPY DATE 11-15-83 COSIPLETED BY.:!: A. Reavis
(
TELEPil0NE 704-373-7567 OPERATING STATUS McGuire Unit 1 Notes
- NOTE: Nameplate Ra' ting
- 1. Unit Name:
. 2. Reporting Period: October 1, 1983 - October 31, 1983 (Gross MWe) calculated as 1450.000 MVA x.90 power 3411
- 3. Licensed Thennsl Power t.\\lWti:
_ factor per Page 111, 1305*
- 4. Nameplate listing (Grow StWe):
1180
- 5. Design Electriesi Ratin;:INet.slWel:
- 6. >tssimum Dependsble Capacity IGrow 31Wc):
1180
- 7. 51ssimum Dependshte Capacity INet.\\tw l:
e S. If Changes Occur in Capacity listinp titems Number 3 Throu;h 7) Since Last Report.Gise Renons:
- 9. Power Level To which Restricted. lf Any (Net.stwe):
- 10. Ressons For Restrictions. lf Any:
This Slonth Yr. to.Dste Cumulative 745.0 7 296. 0 16 800.0
- 11. Hours in Reporting Period 672.6 3 697.2 10 835.4
- 12. Number Of Hours Resetor Was Critical
- 13. Ilesctor Reserve Shutdown llours
- 14. llours Generator On Line 664.5 3 637.6 10 729.8
- 15. Unit Reserse Shutdown Hours 1 935 163 10 299 359 23 801 777
- 16. Gross Thermst Energy Genersted D1Wil) 682 916 3 602 389 8 228 980
- 17. Gross Electric:t Ener;y Genersted O!Wil)
IS. Net Electrical Energy Genersted (.\\ twit) 652 350 3 402 467 7 723 790
- 19. Unit Service Fsetor Ro ?
do 4 614 89.2 49.9 63.9
- 20. Unit Avsilsbility Factor 2t. Unit Capscity Factor IUsing SIDC Nett 74.2 39.5 39.0
- 22. Unit Capacity Fsetor (Using Deli Net) 74.2 39.5 39.0
- 23. Unit Forced Outate Rste 10_8 21 2 22.0
- 24. Shutdowns Scheduled Oser Nest 6 5to:iths IType. Dste.snd Durstion of Eschi:
Refueling - February 26, 1984 - 7 Weeks.
- 25. If Shut Down At End Of lleport Permd. Estimated Date of Sisrtup:
- 26. Units in Test Status (Print to Comm resal Operaimnl:
Forces >t Achiesed INITI \\ L CRITICA Li1 Y INITI A l. I'.Lir 1 RICI T Y C0\\lsil.itCI \\L Ol'I.it A TION Pill 7 )
6
- e i,
a OPERATING DATA REPORT 0-370 DOCKET NO.
DATE 12-15-83 l
COMPLETED BY J. A. Reavis TELEPHONE 704-373-7567 f
OPERATING STATUS McGuire Unit 2 Notes: Nameplate Rating
- 1. Unit Name:
- 2. Reporting Period: November 1, 1983-November 30, 1983 (Gross Mwe) calculated as
- 3. Licensed Thermal Power Olwti: 170 1450.000 MVA x.90 power
- 4. Nameplate Rating (Gross MWel: 1305*
factor per page 111, NUREG-0020-1180 5.' Design Electrical Rating (Net MWe):
- 6. Maximum Dependabfe Capacity dGross MWei:
- 7. Staximum Dependable Capacity (Net MWel:
1180 S. If Changes Occur in Capacity Ratings litems Number 3 Through 7) Since Last Report. Give Reasons:
- 9. Power Level To Which Restricted. If Any (Net MWei:
- 10. Reasons For Restnetions. If Any:
This Month Yr..to-Date Cumulative
- 11. Hours in Reporting Period
- 12. Number Of Hours Reactor Was Critical
- 13. Reactor Reserve Shutdown Hours
- 14. Hours Generator On-Line -
- 15. Unit Reserve Shutdown Hours NOT IN COMMERCIAL OPERATION
- 16. Gross Thermal Energy Generated (MWH)
- 17. Gross Electrical Energy Generated (MWH)
- 13. Net Electrical Energy Generated (MWH)
- 19. Urut Service Factor
- 20. Unic Availability Factor
- 21. Unit Capacity Factor iUsing MDC Net
- 22. Unit Capacity Factor IUsing DER Net)
- 23. Unit Forced Outage Rate
- 24. Shutdowns Scheduled Over Next 6 Months (Type. Date and Duration of Eachn
- 25. If Shut Down At End Of Report Penod. Estimated Date of *.,tartup:
- 26. Units in Test Status Prior to Commercial Operationi:
Forecast Achieved INITIAL CRITICALITY INITIAL ELECTRICITY COMMERCIAL OPER ATION e
~.
---(e #...,
1 e
i f
^
McGuire Nuclear _ Station Pressurizer Power Operated Relief Valve (PORV) and Safety Valve Challenges
.L 4
i -
Unit Date Valve No. (*)
No. of Challenges
-2l
.11/16/83 2NC36'(P) 1 2
'11/16/83 2NC32 (P) 1 f
t i
F i-
- S - Safety Valve I'
P - PORV L.
[
{ ::-
L t
(
t-t i
r:
L
g..*
McGUIRE NUCLEAR STATION Operating Status Report 1.
Personnel Exposure For the month of October, no individual (s) exceeded 10 percent of their allowable annual radiation dose limit.
2.
The total station liquid release contribution to whole body dose for October-has been compared with the Technical Specifications annual value of 3 mrem, the total release for October was less than 10 percent.
The total station gaseous release contribution to any organ dose for October has been compared with the Technical Specifications annual value of 15 mrem; the total release for October was less than 10 percent of this limit.
q._. j sj.
DUKE POWER COMPANY P.O. Box 33189 CHARL(FFFE, N.C. 28242
- HAL B. TUCKER ratsy, sown m e rese===v (704)373-483
. December 15,'1983
= = = - =
-Director Office of Inspection and Enforcement
.U. S. Nuclear-Regulatory Commission-
-Washington, D. C.
20555
. Attention: Document' Control Desk Re:-'McGuire Nuclear Station' Docket No.- 50-369, -370-
Dear Sir:
- Please find attached information concerning the performance and operating status of the McGuire Nuclear Station for the month of November, 1983.
Also attached is a corrected copy of the Operating Data Report for Unit 1.
'Very truly yours,.
O dh cd
.Hal B. Tucker
? JAR:ses Attachments cc:. Regional Administrator Mr. Ralph Birkel U. S. Nuclear Regulatory Commission Office of Nucle... Reactor Regulation Region II U. S.. Nuclear Regulatory Commission 101:Marietta. Street, Suite 2900-Washington, D. C.
20555 Atlanta,; Georgia 30303 Mr. Phil Ross Mr. Bill Lavallee U. S. Nuclear Regulatory Commission Nuclear Safety Analysis Center
.NNBB-5715-P. O. Box 10412 Washington, D. C.
20555 Palo Alto, California 94303 INPO Records Center Senior Resident Inspector Suite 1500 McGuire Nuclear Station
.1100 circle.75 Parkway Atlanta, Georgia 30339 o,
i
_ _ _ _ _ _ _ - _ - _ _ _ _ _ _ _ _ _ _ _