ML20083A289
| ML20083A289 | |
| Person / Time | |
|---|---|
| Site: | Beaver Valley |
| Issue date: | 04/30/1995 |
| From: | David Jones, Noonan T DUQUESNE LIGHT CO. |
| To: | NRC OFFICE OF INFORMATION RESOURCES MANAGEMENT (IRM) |
| References | |
| NUDOCS 9505100143 | |
| Download: ML20083A289 (9) | |
Text
y
- o1:
- p_
Y 7f 4
T.mpnon. om asse00 -
E$YN "," ~
shippingport PA 15077-0004.-
]
y,{.,.
z t:
- May 5,1995 Beaver Valley Power Station Unit 1 - Docket No. 50-334, License No. DPR-66 '
Unit 2 - Docket No. 50-412, License No. NPF-73 Monthly Oaerating Reoort U. S. Nuclear Regulatory Commission Document Control Desk Washington, D.C. 20555 Gentlemen:
In accordance with Appendix A, Technical Specifications, the Monthly Operating Report is submitted ' for Unit 1 and Unit 2 for the month of April,1995.
Respectfully, T. P. Noonan Division Vice President, Nuclear Operations /
Plant Manager DTJ/mmg Enclosures cc: NRC Regional Office King of Prussia, PA k
w; The Nuclear Professionals I
/ g[i 9505100143 950430 A
PDR ADDCK 05000334 l
R PDR
/
i t
- (
i g
1 ENIHLY OPERATDG EXPERIENCE INIT 1 APRIL 1995-April 1-
'1he Unit operated at a nominal value of 100% output for tho' through entire t w t period.
1 April 30 i
1 l
i
)
-)
l t
i e
1 i
I i
1
.I
Y. ~
t l
7 AVERAGE DAILY INIT POWER LEVEL p
.j DOCKET NO.
50-334 LNIT BVPS Ikiit 1-DATE May 2. 1995 CINPLEITD BY David T. Jonas TELEPHCHE (412) 393-7553
'l 1
30tfM Anri1~1995 r
i DAY AVERAGE DAILY POWER LEVEL DAY AVERAGE DAILY POWER LEVEL (We.-Net)
(We-Net) i 1
833 17 829 l
2 822 18 829 3
833 19 825 i
4 833 20 838 5
838 21 825 6
833 22 821 7
833 23 829' t
^
8 833 24 838 l
9 812 25 829 10 838 26 838
.l 11 829 27 838 l
12 833 28 829 13 825 29 821
]
14 825 30 821 15 825 31 16-825 INSIRUCI'ICNS on this form, list the average daily unit power level )Me-Net for each day in the risporting nanth. Capute to the nearest whole megawatt.
4 1
1
OPERATING DATA REPORT 4
DOCKET No.:
50-334 REPORT DATE: 05/02/95 COMPLETED BY: DAVID T. JONES TELEPHONE:
(412) 393-7553 OPERATING STATUS j
- 1. UNIT NAME: BEAVER VALLEY POWER STATION, UNIT 1 Notes
- 2. REPORTING PERIOD: APRIL 1995
- 3. LICENSED THERMAL POWER (MWt):
2652
- 4. NAMEPIATE RATING (Gros,s MWe):
f23
- 5. DESIGN ELECTRICAL RATING (Net MWe):
835 g
- 6. MAX. DEPENDABLE CAPACITY (Gross MWe):
860 l
L
- 7. MAX. DEPENDABLE CAPACITY (Net MWe):
810
- 8. IF CHANGES OCCUR IN CAPACITY RATINGS SINCE IAST REPORT, GIVE REASONS:
- 9. POWER LEVEL TO WHICH RESTRICTED, IF ANY (Net MWe):
None
- 10. REASONS FOR RESTRICTIONS, IF ANY:
N/A THIS MONTH YEAR TO DATE CUMUIATIVE
- 11. HOURS IN REPORTING PERIOD:
719.0 2879.0 166535.0
- 12. NO. OF HRS. REACTOR WAS CRITICAL:
719.0 1376.1 107932.9
- 13. REACTOR RESERVE SHUTDOWN HOURS:
0.0 0.0 4482.8
- 14. HOURS GENERATOR WAS ON LINE:
719.0 1310,7 105848.4
- 15. UNIT RESERVE SHUTDOWN HOURS:
0.0 0.0 0.0
- 16. GROSS THERMAL ENERGY GEN. (MWH):
1903021.0 3200554.0 254527620.5
- 17. GROSS ELECT. ENERGY GEN. (MWH):
630370.0 1050580.0 82076547.0
- 18. NET ELECTRICAL ENERGY GEN. (MWH):
596300.0 974660.0 76698564.0
- 19. UNIT SERVICE FACTOR: (PERCENT) 100.0 45.5 65.4
- 20. UNIT AVAIIABILITY FACTOR:(PERCENT) 100.0 45.5 65.4
- 22. UNIT CAPACITY FACTOR (DER): PCT 99.3 40.5 57.5
- 23. UNIT FORCED OUTAGE RATE: (PERCENT) 0.0 2.7 16.0
- 24. SHUTDOWNS SCHEDULED OVER NEXT SIX MONTHS (TYPE,DATE,AND DURATION OF EACH):
- 25. IF SHUT DOWN AT END OF REPORT PERIOD, ESTIMATED DATE OF STARTUP:
5
- 26. UNITS IN TEST STATUS (PRIOR TO COMMERCIAL OPERATION):
FORECAST ACHIEVED INITIAL CRITICALITY N/A N/A INITIAL ELECTRICITY N/A N/A COMMERCIAL OPERATION N/A N/A
s.
,d N
UNIT SMUTDOWNS AND POWER REDUCTIONS (t20%)
Docket No.
50-334 Unit Name SVPS Unit #1 Date May 2. 1995 Completed By David T. Jonee REPORT MONTN April 1995 Telephone (412) 393-7553 Method of Licensee Lause & Corrective Duration Shutting Event System Component Action to No.
Date' Type 1 (Nours)
Reason 2 Down Reactor 3 Report #-
Code 4 Code 5-Prevent Recurrence NONE 1
2 3
4 F-Forced Reason:
Method:
Exhibit F-Instructions'for S-Scheduled A-Equipme.'.t Feiture (Emplain) 1-menuel Preparation of Data Entry Sheets B Meintenance or Test 2-Manuel Scram for Licensee Event Report (LER) File C-Refueling 3-Autometic Scram (NUREG0161).
D-Regulatory Restriction 4 Cont'd. from Previous Month E-operator Training & License Emma 5-Reduction 5
F-Administrative 9-Other Exhibit N-Seme Source.
G-operational Error (Emptein)
N-Other (Emplain) 2.
.. - _ ~, -
=
mmy M2f!HLY OPERATING EXPERIENCE I. NIT 2 APRIL 1995 April 1 The. Unit began the report period in Mode 5 while shutdown for its fifth refueling cutage.
The Unit entered Mode 6 at 1110 hours0.0128 days <br />0.308 hours <br />0.00184 weeks <br />4.22355e-4 months <br />.
April 2 The Unit rinnained in Mode 6 while shutdown for. its fifth through refueling outage.
April 24 April 25 The Unit-entered m:de 5 at 0405 hours0.00469 days <br />0.113 hours <br />6.696429e-4 weeks <br />1.541025e-4 months <br /> and remained in Mode 5 through for the remainder of the iwi. period.
April 30 e
AVDtAGE DAILY INIT POWIR IEVEL l
D00GT NO.
50-412 INIT BVPS Unit 2 DPGE May 2. 1995 CGtPIEITD BY David T. Jonas TELEPIENE (412) 393-7553 i
PENIH Atril' 1995 DAY AVfRAGE DAILY POWER IEVEL DAY AVERAGE DAILY POWER LEVEL G".% !%t)
()Mit-Net) 1 0
17 0
2 0
18 0
3 0
19 0
4 0
20 0
5 0
21 0
6 0
22 0
t 7
0 23 0
8 0
24 0
9 0
25 0
10 0
26 0
11 0
27 0
12 0
28 0
13 0
29 0
14 0
30 0
1 15 0
31 16 0
1 INSIRDCTIONS On this fcrm, list the average daily unit power level Mie-Net for eact1 day in the t w Ling month. Ctapute to the nearest whole megawatt.
l I
OPERATING DATA REPORT DOCKET NO.:
50-412 REPORT DATE: 05/02/95 COMPLETED BY: DAVID T. JONES i
TELEPHONE:
(412) 393-7553
)
F OPERATING STATUS
.s.
- 1. UNIT NAME: BEAVER VALLEY POWER STATION, UNIT 2 Notes l
- 2. REPORTING PERIOD: APRIL 1995
[*'
- 3. LICENSED THERMAL POWER (MWt):
2.652
- 4. NAMEPLATE RATING (Gross MWe):
923
- 5. DESIGN ELECTRICAL RATING (Net MWe):
836
- 6. MAX. DEPENDABLE CAPACITY (Gross MWe):
870
- 7. MAX. DEPENDABLE CAPACITY (Net MWe):
820
- 8. IF CHANGES OCCUR IN CAPACITY RATINGS SINCE LAST REPORT, GIVE REASONS:
- 9. POWER LEVEL TO WHICH RESTRICTED, IF ANY (Net MWe):
None
- 10. REASONS FOR RESTRICTIONS, IF ANY:
N/A THIS MONTH YEAR TO DATE CUMULATIVE
- 11. HOURS IN REPORTING PERIOD:
719.0 2879.0 65318.0
- 12. NO. OF HRS. REACTOR WAS CRITICAL:
0.0 1989.1 55813.6
- 13. REACTOR RESERVE SHUTDOWN HOURS:
0.0 0.0 0.0
- 14. HOURS GENERATOR WAS ON LINE:
0.0 1989.1 55466.7
- 15. UNIT RESERVE SHUTDOWN HOURS:
0.0 0.0 0.0
- 16. GROSS DIERMAL ENERGY GFN (MWH):
0.0 4929811.0 137451133.0
- 17. GROSS F' ECT. ENERGY GEN. (MWH):
0.0 1631762.0 44683555.0
- 18. NET ELECTRICAL ENERGY GEN. (MWH):
-2502.0 1543253.0 42218258.0 l
- 19. UNIT SERVICE FACTOR: (PERCENT) 0.0 69.1 84.9
- 20. UNIT AVAILABILITY FACTOR:(PERCENT) 0.0 69.1 84.9
- 22. UNIT CAPACITY FACTOR (DER): PCT 0.0 64.1 77.3
- 23. UNIT FORCED OUTAGE RATE: (PERCENT) 0.0 0.0 2.9
- 24. SHUTDOWNS SCHEDULED OVER NEXT SIX MONTHS (TYPE,DATE,AND DURATION OF EACH):
THE UNIT WAS SHUTDOWN FOR ITS FIFTH REFUELING OUTAGE ON MARCH 24. 1995.
THE FIFTH REFUELING OUTAGE IS SCHEDULED TO IAST FOR 60 DAYS.
- 25. IF SHUT DOWN AT END OF REPORT PERIOD, ESTIMATED DATE OF STARTUP:
5/23/95 i
- 26. UNITS IN TEST STATUS (PRIOR TO COMMERCIAL OPERATION):
FORECAST ACHIEVED INITIAL CRITICALITY N/A N/A INITIAL ELECTRICITY N/A N/A 1
COMMERCIAL OPERATION N/A N/A
=,..
5.
C* l UNIT SMUTDOWNS AND POWER REDUCTIONS (1201)
Docket No.
50-412 Unit Name-BVPS Unit 82 Date - New 2. 1995 Completed By David T. Jones REPORT MONTN April 1995 Telephone (4121 393-7553 Method of Licensee cause & Corrective?
Duration Shutting Event system Component Action to No.
Date Typel (Nours)
Reason 2 Down Reector3 Report 8-Code 4 Code 5 Prevent Recurrence 4
950401 S
719.0 C
4 N/A RC FUELXX The Unit remel'ned shutdown to continue with its fifth refueling, outege.
1 2
3 4
F-Ferced
' Reason:
Method Exhibit F-Instructions for-5 Scheduled A-Equipment Felture (Emplain) 1-Manuel Properation of Data Entry Sheets s Neintenance or Test 2-Manuel Scram-for Licensee Event Report (LER) File C-Refueling 3-Autonetic Scram (NUREG0161).
D-Regulatory Restriction 4-Cont'd. from Previous Month E-Operator Training & License Emen 5-Reduction 5
F-Administrative 9 ^ther Exhibit N-Seme source.
G-Operational Error (Explain)
N-Other (Emptein) m m.
.m mm...
..m.
~....
m
. - -,.. -, -.....-.