MONTHYEARML20217G0361999-09-30030 September 1999 Monthly Operating Repts for Sept 1999 for Jm Farley Nuclear Plant,Units 1 & 2.With ML20212E7451999-08-31031 August 1999 Monthly Operating Rept for Aug 1999 for Hcgs,Unit 1.With Summary of Changes,Tests & Experiments Implemented During Aug 1999.With ML20216E4941999-08-31031 August 1999 Monthly Operating Repts for Aug 1999 for Jmfnp.With ML20210R6031999-07-31031 July 1999 Monthly Operating Repts for July 1999 for Jm Farley Nuclear Plant,Units 1 & 2.With L-99-267, Monthly Operating Repts for June 1999 for Jm Farley Nuclear Plant,Units 1 & 2.With1999-06-30030 June 1999 Monthly Operating Repts for June 1999 for Jm Farley Nuclear Plant,Units 1 & 2.With ML20209G0661999-06-30030 June 1999 Monthly Operating Repts for June 1999 for Jm Farley Nuclear Plant,Units 1 & 2.With L-99-023, Monthly Operating Repts for May 1999 for Jfnp Units 1 & 2. with1999-05-31031 May 1999 Monthly Operating Repts for May 1999 for Jfnp Units 1 & 2. with L-99-020, Monthly Operating Repts for Apr 1999 for Jm Farley Nuclear Plant,Units 1 & 2.With1999-04-30030 April 1999 Monthly Operating Repts for Apr 1999 for Jm Farley Nuclear Plant,Units 1 & 2.With L-99-161, Monthly Operating Repts for Mar 1999 for Jm Farley Nuclear Plant,Units 1 & 2.With1999-03-31031 March 1999 Monthly Operating Repts for Mar 1999 for Jm Farley Nuclear Plant,Units 1 & 2.With ML20205N0961999-03-31031 March 1999 Monthly Operating Repts for Mar 1999 for Jm Farley Nuclear Plant,Units 1 & 2.With ML20207M6421999-02-28028 February 1999 Monthly Operating Repts for Feb 1999 for Jm Farley Nuclear Plant,Units 1 & 2.With ML20203A2651999-01-31031 January 1999 Monthly Operating Repts for Jan 1999 for Jm Farley Nuclear Plant,Units 1 & 2.With ML20199E6591998-12-31031 December 1998 Monthly Operating Repts for Dec 1998 for Jm Farley Nuclear Plant,Units 1 & 2.With ML20198B2561998-11-30030 November 1998 Monthly Operating Repts for Nov 1998 for Jm Farley Nuclear Plant,Units 1 & 2.With ML20195C9681998-10-31031 October 1998 Monthly Operating Repts for Oct 1998 for Jm Farley Nuclear Plant,Units 1 & 2.With ML20154H6001998-09-30030 September 1998 Monthly Operating Repts for Sept 1998 for Jm Farley Nuclear Plant,Units 1 & 2.With ML20197C8991998-08-31031 August 1998 Monthly Operating Repts for Aug 1998 for Jm Farley Nuclear Plant,Units 1 & 2.With ML20237B1891998-07-31031 July 1998 Monthly Operating Repts for July 1998 for Jm Farley Nuclear Plant,Units 1 & 2 ML20236M5981998-06-30030 June 1998 Monthly Operating Repts for June 1998 for Jm Farley Nuclear Plant,Units 1 & 2 ML20248M3121998-05-31031 May 1998 Monthly Operating Repts for May 1998 for Jm Farley Nuclear Plant,Units 1 & 2 ML20247F3631998-04-30030 April 1998 Monthly Operating Repts for Apr 1998 for Jm Farley Nuclear Plant,Units 1 & 2 ML20216D5941998-03-31031 March 1998 Monthly Operating Repts for Mar 1998 for Joseph M Farley Nuclear Plant,Units 1 & 2 ML20216D9811998-02-28028 February 1998 Monthly Operating Repts for Feb 1998 for Jm Farley Nuclear Plant,Units 1 & 2 ML20202G4211998-01-31031 January 1998 Monthly Operating Repts for Jan 1998 for Jm Farley Nuclear Plant,Units 1 & 2 ML20198L6191997-12-31031 December 1997 Monthly Operating Repts for Dec 1997 for Jm Farley Nuclear Plant,Units 1 & 2 ML20203F6391997-11-30030 November 1997 Monthly Operating Repts for Nov 1997 for Jm Farley Nuclear Plant,Units 1 & 2 ML20198T4151997-10-31031 October 1997 Monthly Operating Repts for Oct 1997 for Jm Farley Nuclear Plant ML20211N7221997-09-30030 September 1997 Monthly Operating Repts for Sept 1997 for Jm Farley Nuclear Plant Units 1 & 2 ML20216J3151997-08-31031 August 1997 Monthly Operating Repts for August 1997 for Jfnp ML20210K5981997-07-31031 July 1997 Monthly Operating Repts for Jul 1997 for Jm Farley Nuclear Plant,Units 1 & 2 ML20141H3191997-06-30030 June 1997 Monthly Operating Repts for June 1997 for Joseph M Farley Nuclear Plant Units 1 & 2 ML20148K6081997-05-31031 May 1997 Monthly Operating Repts for May 1997 for Joseph M Farley Nuclear Plant ML20141E3121997-04-30030 April 1997 Monthly Operating Repts for Apr 1997 for Jm Farley Nuclear Plant Units 1 & 2 ML20137T1841997-03-31031 March 1997 Monthly Operating Repts for Mar 1997 for Jm Farley Nuclear Plant Units 1 & 2 ML20136G4731997-02-28028 February 1997 Monthly Operating Repts for Feb 1997 for Jm Farley Plant Units 1 & 2 ML20138K5881997-01-31031 January 1997 Monthly Operating Repts for Jan 1997 for Jm Farley Nuclear Plant Units 1 & 2 ML20133F4791996-12-31031 December 1996 Monthly Operating Repts for Dec 1996 for Jm Farley Nuclear Plant Units 1 & 2 ML20132C0631996-11-30030 November 1996 Monthly Operating Repts for Nov 1996 for Jm Farley Nuclear Plant Units 1 & 2 ML20134K7141996-10-31031 October 1996 Monthly Operating Repts for Oct 1996 for Jm Farley Nuclear Plant Units 1 & 2 ML20128Q1161996-09-30030 September 1996 Monthly Operating Repts for Sept 1996 for Jm Farley Nuclear Plant,Units 1 & 2 ML20117M1291996-08-31031 August 1996 Monthly Operating Repts for Aug 1996 for Jm Farley Nuclear Plant Units 1 & 2 ML20116J6421996-07-31031 July 1996 Monthly Operating Repts for Jul 1996 for Jm Farley Nuclear Plant Units 1 & 2 ML20115D6821996-06-30030 June 1996 Monthly Operating Repts for June 1996 for Jm Farley Nuclear Plant Units 1 & 2 ML20117M2721996-05-31031 May 1996 Monthly Operating Repts for May 1996 for Jm Farley Nuclear Plant Units 1 & 2 ML20111D1401996-04-30030 April 1996 Monthly Operating Rept for Apr 1996 for Jm Farley Plant Units 1 & 2 ML20101R6271996-03-31031 March 1996 Monthly Operating Repts for Mar 1996 for Jm Farley Nuclear Plant ML20106H0791996-02-29029 February 1996 Monthly Operating Repts for Feb 1996 for Jm Farley Nuclear Plant ML20097D5651996-01-31031 January 1996 Monthly Operating Repts for Jan 1996 for Jm Farley Nuclear Plant ML20096C0921995-12-31031 December 1995 Monthly Operating Repts for Dec 1995 for Jm Farley Nuclear Plant Units 1 & 2 ML20095E9451995-11-30030 November 1995 Monthly Operating Repts for Nov 1995 for Joseph M Farley Nuclear Plant 1999-09-30
[Table view] Category:TEXT-SAFETY REPORT
MONTHYEARML20217P0761999-10-0606 October 1999 Non-proprietary, Farley Units 1 & 2 LBB Calculation Results Due to SG Replacement & SG Snubber Elimination Programs ML20217G0361999-09-30030 September 1999 Monthly Operating Repts for Sept 1999 for Jm Farley Nuclear Plant,Units 1 & 2.With ML20212E7451999-08-31031 August 1999 Monthly Operating Rept for Aug 1999 for Hcgs,Unit 1.With Summary of Changes,Tests & Experiments Implemented During Aug 1999.With ML20216E4941999-08-31031 August 1999 Monthly Operating Repts for Aug 1999 for Jmfnp.With ML20210T2161999-08-0606 August 1999 Draft SE Supporting Proposed Conversion of Current TS to ITS for Plant ML20211B2011999-08-0404 August 1999 Informs Commission About Results of NRC Staff Review of Kaowool Fire Barriers at Farley Nuclear Plant,Units 1 & 2 & Staff Plans to Address Technical Issues with Kaowool & FP-60 Barriers ML20210R6031999-07-31031 July 1999 Monthly Operating Repts for July 1999 for Jm Farley Nuclear Plant,Units 1 & 2.With ML20196J3791999-06-30030 June 1999 Safety Evaluation of TR WCAP-14750, RCS Flow Verification Using Elbow Taps at Westinghouse 3-Loop Pwrs. Rept Acceptable ML20209G0661999-06-30030 June 1999 Monthly Operating Repts for June 1999 for Jm Farley Nuclear Plant,Units 1 & 2.With L-99-267, Monthly Operating Repts for June 1999 for Jm Farley Nuclear Plant,Units 1 & 2.With1999-06-30030 June 1999 Monthly Operating Repts for June 1999 for Jm Farley Nuclear Plant,Units 1 & 2.With L-99-023, Monthly Operating Repts for May 1999 for Jfnp Units 1 & 2. with1999-05-31031 May 1999 Monthly Operating Repts for May 1999 for Jfnp Units 1 & 2. with ML20206G7471999-05-0404 May 1999 Safety Evaluation Accepting Corrective Actions Taken by SNC to Ensure That Valves Perform Intended Safety Functions & Concluding That SNC Adequately Addressed Requested Actions in GL 95-07 L-99-020, Monthly Operating Repts for Apr 1999 for Jm Farley Nuclear Plant,Units 1 & 2.With1999-04-30030 April 1999 Monthly Operating Repts for Apr 1999 for Jm Farley Nuclear Plant,Units 1 & 2.With ML20206C9461999-04-30030 April 1999 1:Final Cycle 16 Freespan ODSCC Operational Assessment L-99-161, Monthly Operating Repts for Mar 1999 for Jm Farley Nuclear Plant,Units 1 & 2.With1999-03-31031 March 1999 Monthly Operating Repts for Mar 1999 for Jm Farley Nuclear Plant,Units 1 & 2.With ML20205N0961999-03-31031 March 1999 Monthly Operating Repts for Mar 1999 for Jm Farley Nuclear Plant,Units 1 & 2.With ML20204D7271999-03-15015 March 1999 ISI Refueling 15,Interval 2,Period 3,Outage 3 for Jm Farley Nuclear Generating Plant,Unit 1 ML20207M6421999-02-28028 February 1999 Monthly Operating Repts for Feb 1999 for Jm Farley Nuclear Plant,Units 1 & 2.With ML20203A2651999-01-31031 January 1999 Monthly Operating Repts for Jan 1999 for Jm Farley Nuclear Plant,Units 1 & 2.With ML20199D8611999-01-12012 January 1999 SER Accepting Relief Request for Inservice Insp Program for Plant,Units 1 & 2 ML20199E6591998-12-31031 December 1998 Monthly Operating Repts for Dec 1998 for Jm Farley Nuclear Plant,Units 1 & 2.With ML20206C8081998-12-31031 December 1998 Alabama Power 1998 Annual Rept ML20198K4091998-12-18018 December 1998 COLR for Jm Farley,Unit 1 Cycle 16 ML20198B2561998-11-30030 November 1998 Monthly Operating Repts for Nov 1998 for Jm Farley Nuclear Plant,Units 1 & 2.With ML20195E2281998-11-16016 November 1998 Safety Evaluation Authorizing Relief Request for Second 10-year ISI Program Relief Request 56 for Plant,Unit 1 ML20195C9681998-10-31031 October 1998 Monthly Operating Repts for Oct 1998 for Jm Farley Nuclear Plant,Units 1 & 2.With ML20155E0271998-10-29029 October 1998 SER Approving & Denying in Part Inservice Testing Program Relief Requests for Plant.Relief Requests Q1P16-RR-V-3 & Q2P16-RR-V Denied Since Requests Do Not Meet Size Requirement of GL 89-04 ML20154B6121998-10-0101 October 1998 Safety Evaluation Granting Second 10-year ISI Requests for Relief RR-13 & RR-49 Through RR-55 for Jm Farley NPP Unit 1 ML20151V8341998-09-30030 September 1998 Non-proprietary Rev 2 to NSA-SSO-96-525, Jm Farley Nuclear Plant Safety Analysis IR Neutron Flux Reactor Trip Setpoint Change ML20154H6001998-09-30030 September 1998 Monthly Operating Repts for Sept 1998 for Jm Farley Nuclear Plant,Units 1 & 2.With ML20154H0121998-09-30030 September 1998 Submittal-Only Screening Review of Farley Nuclear Plant IPEEE (Seismic Portion) ML20197C8991998-08-31031 August 1998 Monthly Operating Repts for Aug 1998 for Jm Farley Nuclear Plant,Units 1 & 2.With ML20237C5471998-08-20020 August 1998 Suppl to SE Re Amends 137 & 129 to Licenses NPF-2 & NPF-8, Respectively.Se Being Supplemented to Incorporate Clarifications/Changes & Revise Commitment for Insp of SG U-bends in Rows 1 & 2 for Unit 2 Only ML20236Y1121998-07-31031 July 1998 Voltage-Based Repair Criteria 90-Day Rept ML20237B1891998-07-31031 July 1998 Monthly Operating Repts for July 1998 for Jm Farley Nuclear Plant,Units 1 & 2 ML20237A2181998-07-24024 July 1998 Jm Farley Unit 2 ISI Rept Interval 2,Period 3 Outage 1, Refueling Outage 12 ML20236U6141998-07-23023 July 1998 Safety Evaluation Authorizing Use of Alternative Alloy 690 Welds (Inco 52 & 152) as Substitute for Other Weld Metal ML20236R8671998-07-0909 July 1998 Safety Evaluation Concluding That Southern Nuclear Operating Co USI A-46 Implementation Program Has Met Purpose & Intent of Criteria in GIP-2 & Staff SSER-2 on GIP-2 for Resolution of USI A-46 ML20236M5981998-06-30030 June 1998 Monthly Operating Repts for June 1998 for Jm Farley Nuclear Plant,Units 1 & 2 ML20154H0461998-06-30030 June 1998 Technical Evaluation Rept on Review of Farley Nuclear Plant IPEEE Submittal on High Winds,Flood & Other External Events (Hfo) ML20248M3121998-05-31031 May 1998 Monthly Operating Repts for May 1998 for Jm Farley Nuclear Plant,Units 1 & 2 ML20247F3631998-04-30030 April 1998 Monthly Operating Repts for Apr 1998 for Jm Farley Nuclear Plant,Units 1 & 2 ML20217D2591998-04-21021 April 1998 Safety Evaluation Accepting Licensee Proposed Alternative Re Augmented Exam of Reactor Vessel Shell Welds for Plant ML20247E8851998-03-31031 March 1998 FNP Unit 2 Cycle 13 Colr ML20217H3191998-03-31031 March 1998 Safety Evaluation Accepting Proposed Changes to Plant Matl Surveillance Programs ML20216D5941998-03-31031 March 1998 Monthly Operating Repts for Mar 1998 for Joseph M Farley Nuclear Plant,Units 1 & 2 ML20217D4081998-03-24024 March 1998 Safety Evaluation Accepting Proposed Changes to Maintain Calibration Info Required by ANSI N45.2.4-1972 ML20216H6731998-03-17017 March 1998 SER Accepting Quality Assurance Program Description Change for Joseph M Farley Nuclear Plant,Units 1 & 2 ML20216J6851998-03-16016 March 1998 Revised Pages 58 & 59 to Fnp,Units 1 & 2,Power Uprate Project BOP Licensing Rept ML20216D9811998-02-28028 February 1998 Monthly Operating Repts for Feb 1998 for Jm Farley Nuclear Plant,Units 1 & 2 1999-09-30
[Table view] |
Text
-
l JOSEPH M. FARLEY NUCLEAR PLANT UNIT 2 NARRATIVE
SUMMARY
OF OPERATIONS NOVEMBER, 1983 During the month of November, there were two (2) automatic shutdowns.
The first occurred on November 1, 1983 and the second occurred on November 6, 1983.
The following safety-related maintenance was performed in the month of November:
- 1. Performed miscellaneous maintenance on diesel generators.
- 2. Repaired 2D inverter.
- 3. Overhauled 2B component cooling water pump.
- 4. Repacked #1 river water pump.
- 5. Repaired 2A containment spray pump.
- 6. Replaced two universal driver cards in SSPS.
- 7. Performed annual PM on 1-2A and 2B diesel generators.
8312200182 831130 PDR ADOCK 05000364 R PDR
OPERATING DATA REPORT DOCKET NO. 50-364 DATE 12/5/83
. COMPLETED BY L7 O. Hairston, III:
TELEPHONE /9mn Roo-5156 OPERATING STATUS Tacanh M
- 1. Unit Name: Pn ' T ay n 4 '- ?
- 2. Reporting Period: November. 1981 (1) Cumulative data since 2652 7/30/81, date of j 3. Licensed Thermal Power (MWt):
- 4. Nameplate Rating (Gross MWe): 860
- 5. Design Electrical Rating (Net MWe): 829
- 6. Maximum Dependable Capacity (Gross MWe): 854.7
- 7. Maximum Dependable Capacity (Net MWe): 813.7
- 8. If Changes Occur in Capacity Ratings (Items Number 3 Through 7) Since Last Report. Give Reasons:
N/A .
- 9. Power Level To Which Restricted. If Any (Net MWe): fi/A
- 10. Reasons For Restrictions. lf Any: N/A This Month Yr.-to-Date Cumulative
- 11. Hours In Reporting Period _ 720 8,016 20.497
- 12. Number Of Hours Reactor Was Critical 630.9 7,021.6 17,806.1
- 13. Reactor Reserve Shutdown Hours
. 0.0 138.0
- 14. Hours Generator On Line 618.0 6.961.0 t7 sA t _a
- 15. Unit Reserve Shutdown Hours 0.0 0.0 0_0
- 16. Gross Thermal Energy Generated (MWH) 1 474 567 17 con 767 t, A9n sni
- 17. Gross Electrical Energy Generated (MWH) 483.422 5.685.004 16 1sg 719
- 18. Net Electrical Energy Generated (MWH) 453.102 s.1RS,716 11 An1.76A ~
- 19. Unit Service Factor 85.8 86.8 85.7
{ 20. Unit Availability Factor 85.8 86.8 85.7
- 21. Unit Capacity Factor (Using MDC Net) 77.4 82.6 81.6
- 22. Unit Capacity Factor (Using DER Net) 75.9 81.0 80.0
- 23. Unit Forced Outage Rate 14.2 2.0 5.5
- 24. Shutdowns Scheduled Over Next 6 Months (Type. Date. and Duration of Eacht:
N/A
- 25. If Shur Down At End Of Report Period. Estimated Date of Startup: N/A
- 26. Units in Test Status (Prior to Commercial Operation): Forecast Achiesed iNiTiA L CRITICALITY 5/6/81 5/8/81 INITIAL ELECTRICITY 5/24/81 5/25/81 COMMERCIAL OPERATION 8/1/81 7/30/81 pu- >
DOC)GT NO. s0-164 2
UNIT DATT. 12/5/83 COMPLETED BY b' - C- HM rs ton , III TELEPHONE (205) 899-5156 MONTil Nn - bor 10R' DAY AVERAGE DAILY POWER LEVEL DAY' AVERAGE DAILY POWER LEVEL (MWe Net) (MWe Net) 0 g7 832 1
n 33 834 2
0 19 816 3
27 731 4 20 273 22 6'n 5
443 ;; 624 6
a r, 23 741 7
g 549 24 g99 788 15-825 9
8I4 26 838 10 11 828 27 A'A 9'n 23 829 12 835 ;9 gu 13 _
A?1 834 14 30 821 3y IS 16 824 QLSTRUGONS On this form:t. list the aversge dady unit puwer levelin MWe Net for c:ch d:y in the reporting month. Compute to
, the neare:t whole rnegswatt.
(9f77)
DOCKET NO.
50-364 UNIT Sil01 DOWNS AND POWER REDUCTIONS UNIT NAhlE J .M.Farley - Unit 2 DATE 12/5/83 HEPORT hlON111 November, 1983 COMPI.E1ED ilY W C- Hnfrenn TII ;
TEl.LPilONE ('>nsi Roo_si s: A w.
- E E
{ -, .$ g "g $ _b" ~4 1.icensee 5 r, j"1, Cause & Corrective No. Date g 3g ;; .j y 5 Q
Event g? Action to H 5
$E 3 gg =
e !
Repor1 # -
v) U u
o Prevent Recunence 6
004 831101 F 87.6 A 3 NA IA INSTRU Reactor trip due to failure of universal driver card.
005 831106 F 13.4 A 3 NA CD INSTRU Reactor trip due to'MSIV limit switch failure.
006 831120 F 0 A 4 NA IIH j
MOTORX Power reduction to 76% for repair of condensate pump motor.
f 1 2 3 4 I: 1:orted Reason: hfethod: Exhibit G -Instructions S: Schednicd A Iquipment Failure (Explain) 1 hlanual for Picparation of Data Il-Maintenance of Test 2 hfanual Scram. Entry Sheets for I.icensee
' C.Itefneling 3 Automatic Scram. Event Report (1.Elt) File INllitEG-D llegulatoiy Resiniction 4 Other (Explain) 0161)
'. 1 Operatur liaining & license Examination F Administrative 5 G Opnational I.isor (limplain) thfubit I - Same Source
! (9/N) 11 Othes (E xplain)
JOSEPH M. FARLEY NUCLEAR PLANT UNIT 2 NARRATIVE
SUMMARY
OF OPERATIONS NOVEMBER, 1983 During the month of November, there were two (2) automatic shutdowns.
The first occurred on November 1, 1983 and the secr,nd occurred on November 6, 1983.
The following safety-related maintenance was performed in the month of November:
- 1. Performed miscellaneous maintenance on diesel generators.
- 2. Repaired 2D inverter.
- 3. Overhauled 2B component cooling water pump.
- 4. Repacked #1 river water pump.
- 5. Repaired 2A containment spray pump.
- 6. Replaced two universal driver cards in SSPS.
- 7. Performed annual PM on 1-2A and 2B diesel generators.
l l
l l
I l
l l
l i
l l
l . .
OPERATING DATA REPORT DOCKET NO. 50-364 DATE 12/5/83 COMPLETED BY W. C. Haftston, III TELEPHONE r9nn n00-5156 OPERATING STATUS T'M e '
- 1. Unit Name: in=h" hl-November. I'83 9 (1) Cumulative data since
- 2. Reporting Period: 7/30/81, date of
- 3. Licensed Thermal Power (MWt): 2652
- 4. Nameplate Rating (Gross MWe):
860 829
- 5. Design Elecuical Rating (Net MWe):
- 6. Maximum Dependable Capacity (Gross MWe): 854.7
- 7. Maximum Dependable Capacity (Net MWe): 813.7
- 8. If Changes Occur in Capacity Ratings (Items Numb r 3 Through 7) Since Last Report. Give Reasons:
N/A
- 9. Power Level To Which Restricted,if Any (Net MWe): N/A
- 10. Recsons For Restrictions,if Any: N/A This Month Yr..to-Date Cumulative
- 11. Hours In Reporting Period 720 8,016 20.497 630.9 7,021.6 17,806.1
- 12. Number Of Hours Reactor Was Critical 0.0 0.0 138.0
- 13. Reactor Reserve Shutdown Hours
- 14. Hours Generator On.Line 618.0 6.961.0 17 sA1 a 0.0 0.0 0.0
- 15. Unit Reserve Shutdown Hours
- 16. Gross Thermal Energy Generated (MWH) i 470 567 17 ooA 7A7 A1 A9n sni
- 17. Gross Electrical Energy Generated (MWH) 483.422 5.6R5.004 16.1sg 91g
- 18. Net Electrical Energy Generated (MWH) 453.302 5.1RS 916 11 An1.966 85.8 86.8 85.'7
- 19. Unit Service Factor
- 20. Unit Availability Facter 85.8 86.3 85.7 77.4 82.6 81.6
- 21. Unit Capacity Factor (Using MDC Net)
- 22. Unit Capacity Factor (Using DER Net) 75.9 81.0 80.0 14.2 2.0 5.5
- 23. Unit Forced Outage Rate
- 24. Shutdowns Scheduled Over Next 6 Months (Type. Date.and Duration of Each1:
- 25. If Shut Down At End Of Report Period. Estimated Date of Startup: N/A
- 26. Units in Test StatuHPrior to Commercial Operation): Forecast Achiesed i.NiTiAi CRITICALITY 5/6/81 5/8/81 5/24/81 5/25/81 INITIAL ELECTRICITY COMMERCIAL OPER ATION 8/l/81 7/30/81 p-,
r -
DOCKET NO. 50-364 2
UNIT DATE 12/5/83 C05fPLETED 8Y W. c unirgron, III TELEPHONE (205) 899-5156 Nov -kor 10A' 3!ONTl!
DAY AVERAGE DAILY POWER LEVEL DAY AVERAGE DAILY POWER LEVEL (5tWe Net) ($1We. Net) 0 17 832 1
n jg 834 2
0 gig 3 -_
39 go 731 4 27 273 22 630 5
624 6 443 , ;3
" 23 741 7
549 24 A9A 8
825 9 788 25 814 26 838 IO gg 828 yy 99g R?n 23 829 12 835 ,g pu 13 834 14 A?1 30 821 3g
- 15 16 824 l INSTRUCTIONS On this formst. list the svenge daily unit power icvet in MWe-Net for c:ch d:y in the reporting month. Compute to
, the neare:r whole rne;swatt.
(907)
.c - .'
DOCKET NO. 50-364 UNIT Sil01 DOWNS AND POWER REDUCTIONS UNIT NAME J.M.Farley - Unit 2 DATE 12/5/83 COMPLETED ilY W A hirarnn, TII REPORT MONill November. 1983 TEl.LPilONE (?ns) Rog_sisn
.=
c
- E ' !-
U Licensee Er E* Cause & Corrective No. Date k t--
j$
gE &
h 3 {E'd t; g =
Event Report #
U in u
[o't, 8 Action to Pievent Recurrence 2 !
u 6
004 831101 F 87.6 A 3 NA IA INSTRU Reactor trip due to failure of universal driver card.
005 831106 F 13.4 A 3 NA CD INSTRU Reactor trip due to MSIV limit switch failure.
006 831120 F 0 A 4 NA HH MOTORX Power reduction to 76% for repair of condensate pump motor.
I 2 3 4 F: l'orted Reason: Meth xt: Exhibit G. Instructions S: Stheduled A l'ignipment 17ailure (Explain) 1. Manual for Preparation of Data II. Maintenance of Test 24fannal Scram. Entry Sheets for I.icensee C Itefocling 3. Automatic Scram. Esent Repor t ll.E Ri l'ile INURI:G-D llegulaimy Restsittion 4.Olhes (Explain) 01611 I Operator training & I.icense Examination I:. Ad ministiative 5 l G Opciational I.iror (limplain) Exhibis 1 Same Source 19/77) ll Olhes (E xplain)
e .
Malling Address Al;bama Power Company 600 North 18th Street Post Office Box 2641 Birmingham. Alabama 35291 Telephone 205 783-6081 F. L. Clayton, Jr.
Senior Vice President Fhntridge Building AlabamaPower the sou:wn elecinc sys:em December 12, 1983 Docket No. 50-364 Director, Office of Management Information and Program Control U. S. Nuclear Regulatory Commission Washington, D.C. 20555
Dear Sir:
RE: Joseph M. Farley Nuclear Plant Unit 2 Monthly' Operating' Data' Report Attached are two (2) copies of the November,1983 Monthly Operating Report for Joseph M. Farley Nuclear Plant, Unit 2, required by Section 6.9.1.10 of the Unit 2 Technical Specifications. As requested by letter from Mr. John F. Stolz to Mr. Alan R. Barton, dated October 21, 1977, a
" Narrative Summary of Operating Experience" is included in the attached report.
If you have any questions, please advise.