l JOSEPH M. FARLEY NUCLEAR PLANT UNIT 2 NARRATIVE

SUMMARY

OF OPERATIONS NOVEMBER, 1983 During the month of November, there were two (2) automatic shutdowns.

The first occurred on November 1, 1983 and the second occurred on November 6, 1983.

The following safety-related maintenance was performed in the month of November:

1. Performed miscellaneous maintenance on diesel generators.
2. Repaired 2D inverter.
3. Overhauled 2B component cooling water pump.
4. Repacked #1 river water pump.
5. Repaired 2A containment spray pump.
6. Replaced two universal driver cards in SSPS.
7. Performed annual PM on 1-2A and 2B diesel generators.

8312200182 831130 PDR ADOCK 05000364 R PDR

OPERATING DATA REPORT DOCKET NO. 50-364 DATE 12/5/83

. COMPLETED BY L7 O. Hairston, III:

TELEPHONE /9mn Roo-5156 OPERATING STATUS Tacanh M

1. Unit Name: Pn ' T ay n 4 '- ?
2. Reporting Period: November. 1981 (1) Cumulative data since 2652 7/30/81, date of j 3. Licensed Thermal Power (MWt):
4. Nameplate Rating (Gross MWe): 860
5. Design Electrical Rating (Net MWe): 829
6. Maximum Dependable Capacity (Gross MWe): 854.7
7. Maximum Dependable Capacity (Net MWe): 813.7
8. If Changes Occur in Capacity Ratings (Items Number 3 Through 7) Since Last Report. Give Reasons:

N/A .

9. Power Level To Which Restricted. If Any (Net MWe): fi/A
10. Reasons For Restrictions. lf Any: N/A This Month Yr.-to-Date Cumulative
11. Hours In Reporting Period _ 720 8,016 20.497
12. Number Of Hours Reactor Was Critical 630.9 7,021.6 17,806.1
13. Reactor Reserve Shutdown Hours

. 0.0 138.0

14. Hours Generator On Line 618.0 6.961.0 t7 sA t _a
15. Unit Reserve Shutdown Hours 0.0 0.0 0_0
16. Gross Thermal Energy Generated (MWH) 1 474 567 17 con 767 t, A9n sni
17. Gross Electrical Energy Generated (MWH) 483.422 5.685.004 16 1sg 719
18. Net Electrical Energy Generated (MWH) 453.102 s.1RS,716 11 An1.76A ~
19. Unit Service Factor 85.8 86.8 85.7

{ 20. Unit Availability Factor 85.8 86.8 85.7

21. Unit Capacity Factor (Using MDC Net) 77.4 82.6 81.6
22. Unit Capacity Factor (Using DER Net) 75.9 81.0 80.0
23. Unit Forced Outage Rate 14.2 2.0 5.5
24. Shutdowns Scheduled Over Next 6 Months (Type. Date. and Duration of Eacht:

N/A

25. If Shur Down At End Of Report Period. Estimated Date of Startup: N/A
26. Units in Test Status (Prior to Commercial Operation): Forecast Achiesed iNiTiA L CRITICALITY 5/6/81 5/8/81 INITIAL ELECTRICITY 5/24/81 5/25/81 COMMERCIAL OPERATION 8/1/81 7/30/81 pu- >

DOC)GT NO. s0-164 2

UNIT DATT. 12/5/83 COMPLETED BY b' - C- HM rs ton , III TELEPHONE (205) 899-5156 MONTil Nn - bor 10R' DAY AVERAGE DAILY POWER LEVEL DAY' AVERAGE DAILY POWER LEVEL (MWe Net) (MWe Net) 0 g7 832 1

n 33 834 2

0 19 816 3

27 731 4 20 273 22 6'n 5

443  ;; 624 6

a r, 23 741 7

g 549 24 g99 788 15-825 9

8I4 26 838 10 11 828 27 A'A 9'n 23 829 12 835 ;9 gu 13 _

A?1 834 14 30 821 3y IS 16 824 QLSTRUGONS On this form:t. list the aversge dady unit puwer levelin MWe Net for c:ch d:y in the reporting month. Compute to

, the neare:t whole rnegswatt.

(9f77)

DOCKET NO.

50-364 UNIT Sil01 DOWNS AND POWER REDUCTIONS UNIT NAhlE J .M.Farley - Unit 2 DATE 12/5/83 HEPORT hlON111 November, 1983 COMPI.E1ED ilY W C- Hnfrenn TII  ;

TEl.LPilONE ('>nsi Roo_si s: A w.

- E E

{ -, .$ g "g $ _b" ~4 1.icensee 5 r, j"1, Cause & Corrective No. Date g 3g  ;; .j y 5 Q

Event g? Action to H 5

$E 3 gg =

e  !

Repor1 # -

v) U u

o Prevent Recunence 6

004 831101 F 87.6 A 3 NA IA INSTRU Reactor trip due to failure of universal driver card.

005 831106 F 13.4 A 3 NA CD INSTRU Reactor trip due to'MSIV limit switch failure.

006 831120 F 0 A 4 NA IIH j

MOTORX Power reduction to 76% for repair of condensate pump motor.

f 1 2 3 4 I: 1:orted Reason: hfethod: Exhibit G -Instructions S: Schednicd A Iquipment Failure (Explain) 1 hlanual for Picparation of Data Il-Maintenance of Test 2 hfanual Scram. Entry Sheets for I.icensee

' C.Itefneling 3 Automatic Scram. Event Report (1.Elt) File INllitEG-D llegulatoiy Resiniction 4 Other (Explain) 0161)

'. 1 Operatur liaining & license Examination F Administrative 5 G Opnational I.isor (limplain) thfubit I - Same Source

! (9/N) 11 Othes (E xplain)

JOSEPH M. FARLEY NUCLEAR PLANT UNIT 2 NARRATIVE

SUMMARY

OF OPERATIONS NOVEMBER, 1983 During the month of November, there were two (2) automatic shutdowns.

The first occurred on November 1, 1983 and the secr,nd occurred on November 6, 1983.

The following safety-related maintenance was performed in the month of November:

1. Performed miscellaneous maintenance on diesel generators.
2. Repaired 2D inverter.
3. Overhauled 2B component cooling water pump.
4. Repacked #1 river water pump.
5. Repaired 2A containment spray pump.
6. Replaced two universal driver cards in SSPS.
7. Performed annual PM on 1-2A and 2B diesel generators.

l l

l l

I l

l l

l i

l l

l . .

OPERATING DATA REPORT DOCKET NO. 50-364 DATE 12/5/83 COMPLETED BY W. C. Haftston, III TELEPHONE r9nn n00-5156 OPERATING STATUS T'M e '

1. Unit Name: in=h" hl-November. I'83 9 (1) Cumulative data since
2. Reporting Period: 7/30/81, date of
3. Licensed Thermal Power (MWt): 2652
4. Nameplate Rating (Gross MWe):

860 829

5. Design Elecuical Rating (Net MWe):
6. Maximum Dependable Capacity (Gross MWe): 854.7
7. Maximum Dependable Capacity (Net MWe): 813.7
8. If Changes Occur in Capacity Ratings (Items Numb r 3 Through 7) Since Last Report. Give Reasons:

N/A

9. Power Level To Which Restricted,if Any (Net MWe): N/A
10. Recsons For Restrictions,if Any: N/A This Month Yr..to-Date Cumulative
11. Hours In Reporting Period 720 8,016 20.497 630.9 7,021.6 17,806.1
12. Number Of Hours Reactor Was Critical 0.0 0.0 138.0
13. Reactor Reserve Shutdown Hours
14. Hours Generator On.Line 618.0 6.961.0 17 sA1 a 0.0 0.0 0.0
15. Unit Reserve Shutdown Hours
16. Gross Thermal Energy Generated (MWH) i 470 567 17 ooA 7A7 A1 A9n sni
17. Gross Electrical Energy Generated (MWH) 483.422 5.6R5.004 16.1sg 91g
18. Net Electrical Energy Generated (MWH) 453.302 5.1RS 916 11 An1.966 85.8 86.8 85.'7
19. Unit Service Factor
20. Unit Availability Facter 85.8 86.3 85.7 77.4 82.6 81.6
21. Unit Capacity Factor (Using MDC Net)
22. Unit Capacity Factor (Using DER Net) 75.9 81.0 80.0 14.2 2.0 5.5
23. Unit Forced Outage Rate
24. Shutdowns Scheduled Over Next 6 Months (Type. Date.and Duration of Each1:
  • l N/A
25. If Shut Down At End Of Report Period. Estimated Date of Startup: N/A
26. Units in Test StatuHPrior to Commercial Operation): Forecast Achiesed i.NiTiAi CRITICALITY 5/6/81 5/8/81 5/24/81 5/25/81 INITIAL ELECTRICITY COMMERCIAL OPER ATION 8/l/81 7/30/81 p-,

r -

DOCKET NO. 50-364 2

UNIT DATE 12/5/83 C05fPLETED 8Y W. c unirgron, III TELEPHONE (205) 899-5156 Nov -kor 10A' 3!ONTl!

DAY AVERAGE DAILY POWER LEVEL DAY AVERAGE DAILY POWER LEVEL (5tWe Net) ($1We. Net) 0 17 832 1

n jg 834 2

0 gig 3 -_

39 go 731 4 27 273 22 630 5

624 6 443 , ;3

" 23 741 7

549 24 A9A 8

825 9 788 25 814 26 838 IO gg 828 yy 99g R?n 23 829 12 835 ,g pu 13 834 14 A?1 30 821 3g

- 15 16 824 l INSTRUCTIONS On this formst. list the svenge daily unit power icvet in MWe-Net for c:ch d:y in the reporting month. Compute to

, the neare:r whole rne;swatt.

(907)

.c - .'

DOCKET NO. 50-364 UNIT Sil01 DOWNS AND POWER REDUCTIONS UNIT NAME J.M.Farley - Unit 2 DATE 12/5/83 COMPLETED ilY W A hirarnn, TII REPORT MONill November. 1983 TEl.LPilONE (?ns) Rog_sisn

.=

c

- E ' !-

U Licensee Er E* Cause & Corrective No. Date k t--

j$

gE &

h 3 {E'd t; g =

Event Report #

U in u

[o't, 8 Action to Pievent Recurrence 2  !

u 6

004 831101 F 87.6 A 3 NA IA INSTRU Reactor trip due to failure of universal driver card.

005 831106 F 13.4 A 3 NA CD INSTRU Reactor trip due to MSIV limit switch failure.

006 831120 F 0 A 4 NA HH MOTORX Power reduction to 76% for repair of condensate pump motor.

I 2 3 4 F: l'orted Reason: Meth xt: Exhibit G. Instructions S: Stheduled A l'ignipment 17ailure (Explain) 1. Manual for Preparation of Data II. Maintenance of Test 24fannal Scram. Entry Sheets for I.icensee C Itefocling 3. Automatic Scram. Esent Repor t ll.E Ri l'ile INURI:G-D llegulaimy Restsittion 4.Olhes (Explain) 01611 I Operator training & I.icense Examination I:. Ad ministiative 5 l G Opciational I.iror (limplain) Exhibis 1 Same Source 19/77) ll Olhes (E xplain)

e .

Malling Address Al;bama Power Company 600 North 18th Street Post Office Box 2641 Birmingham. Alabama 35291 Telephone 205 783-6081 F. L. Clayton, Jr.

Senior Vice President Fhntridge Building AlabamaPower the sou:wn elecinc sys:em December 12, 1983 Docket No. 50-364 Director, Office of Management Information and Program Control U. S. Nuclear Regulatory Commission Washington, D.C. 20555

Dear Sir:

RE: Joseph M. Farley Nuclear Plant Unit 2 Monthly' Operating' Data' Report Attached are two (2) copies of the November,1983 Monthly Operating Report for Joseph M. Farley Nuclear Plant, Unit 2, required by Section 6.9.1.10 of the Unit 2 Technical Specifications. As requested by letter from Mr. John F. Stolz to Mr. Alan R. Barton, dated October 21, 1977, a

" Narrative Summary of Operating Experience" is included in the attached report.

If you have any questions, please advise.

Yours very truly, F. L. Clayto , J r.

I FLCJ r/KWM:nac Enclosures xc: Mr. Ted Cintula (1 copy)

Director, IE (10 copies)

Director, RII (1 copy) i l'