Text
.
paua g*
4 UNITED STATES i
j NUCLEAR REGULATORY COMMISSION 2
WASMNGTON, D.C. 20666-0001 SAFETY EVALUATION BY THE OFFICE OF NUCLEAR REACTOR REGULATION RELATED TO AMENDMENT NO. 205 TO FACILITY OPERATING LICENSE NO. DPR-53 BALTIMORE GAS AND ELECTRIC COMPANY l
CALVERT CLIFFS NUCLEAR POWER PLANT. UNIT NO. 1 4
DOCKET NO. 50-317 l
1.0 INTRODUCTION
By letter dated April 28, 1995, the Baltimore Gas and Electric Company (BG&E) submitted a request for changes to the Calvert Cliffs Nuclear Power Plant, Unit No. 1, Technical Specifications (TSs). The requested changes would revise the control room emergency ventilation system TS 3.7.6.1, Limiting i
Condition For Operation (LCO). The revision extends the one-time increase in the allowed outage time for loss of emergency power only, from the 30 days previously approved, to 45 days. This extension is necessary to allow time to repair the Number 21 emergency diesel generator which failed its operability tests subsequent to modifications which have been recently completed.
2.0 BACKGROUND
Currently, Calvert Cliffs Nuclear Power Plant (CCNP) uses three emergency diesel generators (EDGs) to provide emergency onsite power. These EDGs are designated as No. 11 EDG, No. 21 EDG, and No. 12 EDG. Normally, No. 11 EDG is dedicated to Unit 1, No. 21 EDG is dedicated to Unit 2, and No. 12 EDG is the
" swing" EDG which is capable of powering one emergency bus on either unit.
Offsite AC power is provided by three independent 500 kV transmission lines which provide power to the units during normal operations as well as during startup and shutdown, and an additional 69 kV line. Any one of these four lines is capable of supplying the power for all required safe shutdown loads for both units.
In response to the station blackout rule, BG&E is modifying the CCNP electrical distribution system to include the tie-in of an alternate AC (AAC) diesel generator and upgrading the No. 21 EDG to increase its electrical output during the current Unit 2 outage.
CCNP has a common control room for the two units. The control room emertency ventilation system (CREVS) consists of two redundant trains designated as No.
11 CREVS and No. 12 CREVS. No. 11 CREVS receives power from Unit I through 4 kV Bus No. 11 with No. 11 EDG as the emergency power supply and No. 12 CREVS receives power from Unit 2 through 4 kV Bus No. 24 with No. 21 EDG as the emergency power supply.
In the past outages, when No. 21 EDG was not available as an emergency power supply, No.12 EDG was used as the emergency power supply for the 4 kV Bus No. 24. The capability to align No. 12 EDG to 4 kV Bus No. 24 was removed prior to the work currently being performed to upgrade No. 21 EDG.
This will result in No. 12 CREVS not having a safety-9505090167 950502 PDR ADOCK O 37 p
related emergency power supply during the period of No. 21 EDG upgrade.
I However, Unit 1.is at full power during this No. 21 EDG upgrade period which was originally expected to last about 30 days. With either unit in Modes 1 i
through 4, the current TSs require both trains of the CREVS (Nos. 11 and 12) i to be operable and one train was allowed to be inoperable for up to 7 days.
1 Without a one-time extension of the Unit 1 CREVS TS from 7 days to 30 days of the allowed outage time (A0T), the scheduled modification to No. 21 EDG would require a dual unit 30-day outage.
1 Consequently, by letter dated September 23, 1994, BG&E requested an amendment to Operating License Nos. DPR-53 and DPR-69 for CCNP, Units 1 and 2, respectively. By letter dated January 11, 1995, Amendment No. 202 to Facility Operating License No. DPR-53 and Amendment No. 180 to Facility Operating License No. DPR-69 were issued. Amendment No. 202, in part, revised the Unit 1 CREVS TSs to allow a one-time extension from 7 to 30 days to the A0T for one train inoperable.
3.0 EVALUATION l
As noted, the upgrade of the No. 21 EDG was scheduled to be completed within a f
30-day time period. However, due to unforeseen circumstances, as detailed in Section 4.0 of this safety evaluation, BG&E has requested that the one-time increase in the A0T of 30 days for the CREVS approved in Amendment No. 202 be l
extended to a one-time A0T of 45 days.
i During' this A0T period of 45 days for the CRVS, the loss of control room i
habitability resulting from the loss of all power for the CREVS is the i
concern. The CREVS is required to maintain the control room temperature below i
a specified limit and to filter the control room air in the event of a j
radioactive release.
l The No.12 CREVS has its normal power supply available but does not have a safety-related emergency power supply during this 45 day A0T period. However, j
a temporary diesel generator is connected to 4 kV Bus No. 24 to assure that AC l
power is available to the No.12 CREVS.
In addition, during this period, planned maintenance will be prohibited on three of the above cited four offsite power sources. Therefore, the No.11 CREVS will have both its normal and emergency power sources available during this 45 day A0T period. However, i
as noted, its emergency power source is not safety-related.
l Loss of all power to both trains of CREVS would require loss of all offsite power sources, the failure of No. 11 EDG to start, and the failure of the temporary diesel generator to start. Ctasequently, BG&E concluded that the probability of a loss of both trains of CREVS resulting from loss of all power supply sources during the 45 day A0T period for the CREVS is very low.
4.0 STATEMENT OF EMERGENCY CIRCUMSTANCES I
The No. 21 EDG was taken out-of-service on April 3,1995, to perform the upgrade modifications. The current one-time 30 day A0T will expire on May 3, i
. 1995, which would require Unit No. I to commence shutdown if the modifications were not completed, the necessary tests performed, and the No. 21 EDG declared operable. The modifications being performed are similar to the upgrade modifications completed on the No. 11 EDG during the 1994 Unit No. I refueling outage.
In addition, these modifications have been successfully performed on these types of EOGs elsewhere in the industry.
BG&E did not experience any significant problems during the No.11 EDG modifications and did not anticipate any significant problems during the No. 21 EDG modifications' based on previous industry experience.
The necessary upgrade modifications were completed by April 13, 1995, and testing was commenced on April 14, 1995. However, several complications arose during the testing which necessitated repeating tests and performing additional tests.
Initial problems with the new control circuitry, low crankcase vacuum, and governor problems were corrected and tests were completed.
Firing pressure runs were performed on April 20, 1995, with firing pressures found out-of-specification. Several vendor (Fairbanks Moris) recommendations were implemented but the problem persisted. The pistons and rings were changed out during the weekend of April 22, based on further vendor recommendations, and BG&E anticipated that the problems would be corrected.
During the subsequent testing, the No.10 cylinder still experienced low firing pressure and high exhaust temperature. At this point, on April 25, 1995, BG&E verbally informed the NRC staff that the one-time 30 day A0T would require an additional 15 day extension due to the unforeseen problems and that it was initiating an emergency technical specification amendment request which was received on April 28, 1995.
A diesel engine analysis contractor arrived on site on April 27, 1995, with specialized test equipment to trouble shoot these problem.
BG&E indicated that the additional 15 days would be adequate to complete the troubic shooting, perform the necessary equipment modifications and, complete the required tests.
BG&E has indicated that these actions will avoid an unnecessary shutdown of Unit No.1.
The NRC staff does not believe that BG&E abused the emergency provisions of 10 CFR 50.91(a)(5) in this instance. As detailed above, the type of upgrade modifications being performed on the No. 21 EDG had successfully been completed previously by both BG&E and other industry members. BG&E anticipated that the firing pressure exhaust and temperature problems would have been corrected by the change out of the pistons and rings. When this did not occur, BG&E immediately contacted the NRC staff and initiated an emergency amendment request.
Therefore, in accordance with 10 CFR 50.91(a)(5), the Commission has determined that emergency circumstances exist that warrant prompt action.
The situation, as detailed above, could not have been reasonably avoided and BG&E and the Commission must act quickly. The time remaining between now and the time that the unit would be required to shut down, May 3,1995, does not permit the Commission to publish a Federal Reaister notice allowing 30 days for prior public comment.
The Commission has also determined that the requested amendment, as discussed in Section 6.0, does not involve a significant hazards consideration.
I
. 5.0 SUPMARY Based on its review of BG&E's rationale and the evaluation described above, the NRC staff concurs with BG&E's conclusion that the likelihood of the loss of both trains of CPEVS resulting from loss of emergency power is very low during the requested 45 day A0T. Therefore, the NRC staff finds that BG&E's proposed T.c change to revise the Unit 1 CREVS TS 3.7.6.1 to provide a one-time extension from 30 days to 45 days to the A0T for one train inoperable is acceptabie.
6.0 fli4AL NO SIGNIFICANT HAZARDS CONSIDERATION DETERMINATION The Commission has proved standards for determining whether a significant hazards ansideration exists (10 CFR 50.92(c)). A proposed amendment to an operating license for a facility involves no significant hazards consideration 1
if operation of the facility in accordance with the proposed amendment would not:
(1) involve a s!gnificant increase in the probability or consequences of an accident previously evaluated; or (2) create the possibility of new or different kind of accident from an accident previously evaluated; or (3) involve a significant reduction in a margin of safety.
The following evaluation by BG&E, with which we agree, demonstrates that the proposed amendment does not involve a significant hazards consideration.
1.
Would not involve a significant increase in the probability or consequences of an accident previously evaluated.
The Control Room Emergency Ventilation System (CREVS) is designed so that the Control Room can be occupied under all plant conditions.
The CREVS is required to maintain the Control Room temperature and to filter the Control Room air in the event of a radioactive release.
During the time No. 21 Emergency Diesel Generator is out-of-service, No. 12 CREVS will be without a Class IE emergency power source. The CREVS is not an initiator in any previously evaluated accidents.
Therefore, the proposed change does not involve an increase in the probability of an accident previously evaluated.
The CREVS is required to maintain the Control Room habitable following a. radioactive release from a loss-of-coolant accident, a main steam break, or a steam generator tube rupture. There is a very low probability of an event occurring requiring Control Room isolation during the extended period.
Requiring that the CREVS have both a normal power source and an emergency power source available ensures that one train of the system will be available so that the Control Room can be occupied under these conditions. The probability of a loss-of-offsite power is very low due to the highly redundant design of the offsite power supply.
Planned maintenance on three of the offsite power supplies and associated relaying and devices within the switchyards will be prohibited during the extended period to maintain the low probability of a loss-of-offsite power event.
0g i
l g
4 l
i l
Number 12 CREVS train will continue to have its' normal power source.
Number 11 CREVS will have both its normal and emergency power supply available and this train is capable of maintaining the Control Room i
habitable._ In addition, a temporary diesel generator is installed to J
provide assurance that an emergency power source will be available to a
No. 12 CREVS. The compensatory measures that will be taken during l
this per4od will ensure that the_ proposed change does not involve a l
significant increase in the consequences of an accident previously j
evaluated.
l Therefore, the proposed change does not in"olve a significant l
increase in the probability or consequencei of accident previously evaluated.
2.
Would not create the possibility of a new or different type of
-l accident from any accident previously evaluated.
l The CREVS is not being modified by this proposed change. The system will continue to operate in the same manner. Number 21 Emergency Diesel Generator will operate in a similar manner after it is returned to service and will be able to support unit operation after all the testing is completed. The installation of the temporary i
diesel generator during the extended period has been evaluated to ensure that it does not create any new accident initiators.
_i Therefore, the proposed change does not create the possibility of a i
new or different type of accident from any accident previously 1
evaluated.
1 3.
Would not involve a significant reduction in a margin of safety.
The operability of the CREVS during Modes 1 through 4 ensures that the Control' Room will remain habitable under all plant conditions.
i The proposed change does not affect the function of the CREVS. The i
proposed change will allow one train of the CREVS to be without a Class IE emergency power supply for up to 45 days. This train will have the nonnal power supply available. The other train of the CREVS will have both its normal and emergency power supplies during this l
period. Compensatory measures that will be taken include prohibiting planned maintenance on the required offsite power sources, and j
installing a temporary diesel generator of sufficient capacity as a backup to the affected train.
These measures will maintain the current margin of safety. Therefore, the proposed change does not i
involve a significant reduction in a margin of safety.
7.0 STATE CONSULTATION
In accordance with the Commission's regulations, the Maryland State official was notified of the proposed issuance of the amendment. The State official j
had not comments.
l l
l i
i
.' 8.0 ENYIR0ffiENTAL CONSIDERATION The amendment changes a requirement with respect to installation or use of a facility component located within the restricted area as defined in 10 CFR Part 20. The NRC staff has determined that the amendment involves no j
significant increase in the amounts, and no significant change in the types, i
of any effluents that may be released offsite, and that there is no significant increase in individual or cumulative occupational radiation exposure. The Consission has made a final no significant hazards i
consideration with respect to this amendment. Accordingly, the amendment meets the eligibility criteria for categorical exclusion set forth in 10 CFR 51.22(c)(9).
Pursuant to 10 CFR 51.22(b) no environmental impact statement or i
environmental assessment need be prepared in connection.with the issuance of the amendment.
9.0 CONCLUSION
i The Commission has concluded, based on the considerations discussed above, that:
(1) there is reasonable assurance that the health and safety of the public will not be endangered by operation in the proposed manner, (2) such activities will be conducted in compliance with the Commission's regulations, and (3) the issuance of the amendment will not be inimical to the common defense and security or to the health and safety of the public.
Principal Contributor: Daniel Mcdonald I
Date:
May 2, 1995 j
f
.l 7
May-2,'1995
.Mr. Robert E. Denton Vice' President - Nuclear Energy
-Baltimore Gas and Electric Company.
Calvert Cliffs Nuclear Power Plant 1650 Calvert Cliffs Parkway i
-Lusby, M) 20657-4702-i
SUBJECT:
ISSUANCE OF EMERGENcf AMENDMENT FOR CALVERT CLIFFS NUCLEAR POWER' i
PLANT, UNIT NO. I-(TAC NO. M92152)
Dear Mr. Denton:
l The Commission has issued the enclosed Amendment No. 205to= Facility Operating License No. DPR-53 for the Calvert Cliffs Nuclear Power Plant," Unit No.1.
1 This amendment consists.of changes to the Technical Specifications (TSs) in response to your application transmitted by letter dated April 28, 1995.
l The amendment revises the control room emergency ventilation system TS-3.7.6.1, Limiting Condition For Operation. The revision extends the one-time increase in the allowed outage time for loss of emergency power only, from the 30 days previously approved, to 45 days. This extension is necessary to allow I
time to repair the Number 21 emergency diesel generator which failed its operability tests subsequent to modifications which have been recently completed.
A copy of the related Safety Evaluation is enclosed. A Notice of Issuance i
will be included in the Commission's next regular biweekly Federal Reaister notice.
.j I
sincerely, Original signed by:
Daniel G. Mcdonald, Senior Project Manager i
Project Directorate I-l_
)
Division of Reactor Projects - I/II i
Office of Nuclear Reactor Regulation Docket No. 50-317
Enclosures:
1.
Amendment No. 205to DPR-53 i
2.
Safety Evaluation i
cc w/ enc 1s: See next page t
DISTRIBUTION: See attached sheet DOCUMENT NAME: G:\\CCl-2\\CC192152.AMD i
T3 sesehus e empy of this absoussent, hadmets he the bes: *C' s Copy without ettechmenuanclosure
- E* = Copy with attachment / enclosure
- N* = No copy 0FFICE PDl-1:LA n()[ E PDl-1:PM _ 7 fPLB d
OGC /e39 l
PDI-1:D a lu NAME Slittle
- ~~
DMcDonald:Wiht tMcCracken'/#f7' H,%Mme LMarsh I/b DATE 5 / I /95 B S/et/95 *
' S / / /95 /
- / / /95 5/ 2., /95
[
rusam m an l
- - -