ML20082U378
| ML20082U378 | |
| Person / Time | |
|---|---|
| Site: | Duane Arnold (DPR-49-A-176) |
| Issue date: | 09/13/1991 |
| From: | Shiraki C Office of Nuclear Reactor Regulation |
| To: | |
| Shared Package | |
| ML20082U380 | List: |
| References | |
| NUDOCS 9109200136 | |
| Download: ML20082U378 (3) | |
Text
.
..- ~-.---- -,.. -. -
UNITED STATES Ig
[' 3 g
NUCLEAR REGULATORY COMMISSION j;
t WASHINGTON. D, C. 20555
/
t IOWA ELECTRIC LIGHT AND POWER COMPANY CLNIKAL IUWA POWER COOPERATIVL CORN BELT POWER COOPERATIVE DOCKET NO. 50-331 DUANE ARNOLD ENERGY CENTER AMENDMENT TO FACILITY OPERATING LICENSE Amendment No.176 License No. DPR-49 1.
The Nuclear Regulatory Commission (the Commission) has found that:
A.
The application for amendment by towa Electric Light and Power Company, et al., dated April 1, 1991, complies with the standards and requirements of the Atomic Energy Act of 1954, as amended (the Act), and the Commission's rules and regulations set forth in 10 CFR Chapter I;
-B.
The facility will operate in conformity with the application, the provisions of the Act, and the rules and regulations of the Commission; C.
There is reasonable assurance (i) that the activities authorized by this amendment can be conducted without endangering the health and safety of the public, and (ii) that such activities will be conducted in compliance with the Commission's regulations; D.
The issuance of this amendment will not be inimical to the common defense and security or to the health and safety of the public; and E.
The issuance of this amendment is in accordance with 10 CFR Part 51 of the Commission's regulations and all applicable requirements have been satisfied.
2.-
Accordingly, Facility Operating License No. DPR-49 is hereby amended as follows:
- a. Revise paragraph 2.B(4) to read:
(4)
IELP, pursuant to +be Ac-4 10 CFR Parts 30, ired any40 and 70, to receive, posst
'od t n amounts as requ byproduct, source special nuclear material without-restriction to chemical or physical form, for sample-analysis or instrument cali> ration or associated radio-active apparatus components.
b.
Delete paragraph 2.B(5) and renrmber paragraph 2.B(6) accordingly.
9109200136 910913
'PDR ADOCK 05000331 P
-2~
3.
The license amendment is effective as of the date of issuance and shall be implemented within 30 days of the date of issuance.
I FOR 1HE NUCLEAR REGULATORY COMMISSION Clyd Y. Shiraki, Sr. Project Manager Project Directorate 111-3 Division of Reactor Projects Ill/IV/V Office of Nuclear Reactor Regulation r
Attachment:
Revised Page 3 to DPR-49 I
Date of issuance: September 13, 1991 I
1 r
p I
6 I
e 4
l f.
l l
(2)
IELP, pursuant to the Act and 10 CFR Part 70, to receive, possess i
and use at any time special nuclear material as reactor fuel, in accordance with the limitations for storage and amounts required for reactor operation, as described in the final Safety Analysis Report, as supplemented and amended as of January 1,1975 and as supplemented and amended by letters dated October 13, 1977, December 20,1977, March 14,1978. May 11,1978, May 15,1978 June 6, 1978 and June 19, 1978, and June 29, 1978.
(3)
IELP, pursuant to the Act and 10 CFR Parts 30, 40 and 70, to receive, possess and use at any time any byproduct, soLrce and special nuclear material as sealed neutron sources for reactor startup, sealed sources for reactor instrumentation and radiation monitoring equipment calibration, and as fission detectors in amounts as required; (4)
IELP, pursuant to the Act and 10 CFR Parts 30, 40 and 70, to receive, possess and use in amounts as required any byproduct, source or special nuclear material without restriction to chemical of physical form, for sample analysis or instrument calibration or associated radioactive apparatus components.
(5)
IELP, pursuant to the Act and 10 CFR Parts 30 and 70, to possess but not to separate, such byprodect and special nuclear materials as may be produced by the operation of the facility.
C.
This license shall be deemed to contain and is subject to the conditions specified in the following Commission regulations in 10 CFR Chapter I; Part 20, Section 30.34 of Part 30. Section 40.41 of Part 40, Sections 50.54 and 50.59 of Part 50, and Section 70.32 of Part 70; is subject to all applicable provisions of the Act and to the rules, regulations.
and orders nf the Commission now or hereafter in effect; and is subject to the additional conditions specified or incorporated below:
Maximum Power Level (1)
IEL&P is authorized to operate the Duane Arnold Energy Center at steady state reactor core power levels not in excess of 1658 megawatts (thermal).
(2) Technical Specifications The Technical Specifications contained in Appendix A, as revised l
through Amendment No.
are hereby incorporated in the license.
The licensee shall operate the facility in accordance with the Technical Specifications.
Amendment No.176 l
.