ML20082T343

From kanterella
Jump to navigation Jump to search
Proposed Tech Specs Table 4.3.7.1-1, Radiation Monitoring Instrumentation Srs, Extending Channel Functional Test Interval from Monthly to Quarterly for Each Instrument
ML20082T343
Person / Time
Site: Hope Creek PSEG icon.png
Issue date: 04/18/1995
From:
Public Service Enterprise Group
To:
Shared Package
ML20082T338 List:
References
NUDOCS 9505030459
Download: ML20082T343 (2)


Text

<

f ATTACHMENT 2 TECHNICAL SPECIFICATION PAGES WITH PEN AND INK CHANGES LICENSE AMENDMENT APPLICATION REVISION OF THE RADIATION MONITOR CHANNEL FUNCTIONAL TEST FREQUENCY HOPE CREEK GENERATING STATION FACILITY OPERATING LICENSE NPF-57 LR-N95041 DOCKET NO.-50-354 LCR 95-01 The following Technical Specifications for Facility Operating License No. NPF-57 are af fected by this License Amendment Request:

Technical Soecificati2D Pace Table 4.

.7,1-1 3/4 3-66 9505030459 950418 i

i PDR ADOCK 05000354 p

PDR l

4 TABLE 4.3.7.1-1 8'y RA0!ATION NONITORING INSTRUMENTATION SURVEILLANCE REQUIREMENTS h

OPERATIONAL g

CHANNEL CONOIIIONS FOR CHANNEL FUNCTIONAL CHANNEL WHICH SURVEILLANCE INSTRUMENTATION CHECK TEST CALIBRATION REQUIRED 1.

Control Room Ventilatioq Radiation Q

Monitor S

R 1, 2, 3. S and

  • 2.

Area Monitors a.

Criticality Monitors 1)

New Fuel Storage S

R Vault h

0.

2)

Spent fuel Storage S

R h

(.k f

b.

Control Room Direct S

R At all times Radiation Monitor 3.

Reactor Auxiliaries Cooling S

R At all times Radiation Monitor 4.

Safety Auxiliaries Cooling S

R At all times Radiation Monitor Ra ti i

k

.