Monthly Operating Rept for Oct 1983
ML20082T002
Person / Time
Site: Cooper Entergy icon.png
Issue date: 11/08/1983
From: Ballinger P, Thomason P
NEBRASKA PUBLIC POWER DISTRICT
To:
NRC
References
CNSS830700, NUDOCS 8312150112
Download: ML20082T002 (5)


Text

.

OPERATING DATA REPORT 050-298 DOCKET NO.

DATE 11-8-83 COMPLETED BY P. L. Ballinger TELEPHONE 402-825-3811 OPERATING STATUS Cooper Nuclear Station Notes

1. Unit Name:

October 1983

2. Reporting Period:

2381

3. Licensed Thermal Power (MWt):

836

4. Nameplate Rating (Gross MWe):
5. Design Electrical Rating (Net MWe):

778 787

6. Maximum Dependable Capacity (Gross MWe):

764

7. Maximum Dependable Capacity (Net MWe):
8. If Changes Occur in Capacity Ratings (Items Number 3 Through 7) Since Last Report. Give Reasons:
9. Power Level To Which Restricted,if Any (Net MWe):
10. Reasons For Restrictions,If Any:

This Month Yr.-to.Date Cumulatise I

11. Hours In Reporting Period 745.0 7,296.0 81,841.0 745.0 4,216.5 65,587.4 l
12. Number Of Hours Reactor Was Critical l
13. Reactor Reserve Shutdown Hours 0.0 0.0 0.0
14. Hours Generator On.Line.

745.0 4,144.2 64,516.2

15. Unit Reserve Shutdown Hours 0.0 0.0 0.0
16. Gross Thermal Energy Generated (MWH) 1,145,664.0 8,402,760.0 128,464,062.0
17. Gross Electrical Energy Generated (MWH) 3 7 9, C 18.,0,,

2,796,921.0 40,729,149.0

18. Net Electrical Energy Generated (MWH) 364.752.0 2.696,289.0 39,269,749.0
19. Unit Service Factor 100.0 56.8 78.8
20. Unit Availability Factor 100.0 56.8 78.8 64.1 48.4 62.8
21. Unit Capacity Factor (Using MDC Net) 62.9 47.5 61.7
22. Unit Capacity Factor (Using DER Net)

.23. Unit Forced Outage Rate 0.0 2.6 3.8

' 24. Shutdowns Scheduled Over Next 6 Months (Type. Date.and Duration of Eachi:

l

. 25. If Shut Down At End Of Report Period. Estimated Date of Startup:

26. Units in Test Status (Prior to Commercial Operation):

Forecast

- Achieved i

INITIAL CRITICALITY INITIAL ELECTRICITY COMMERCIAL OPERATION 8312150112 83110s PDR ADDCK 05000298 R

PDR 16Sk PU-I

AVERAGE DAILY UNIT POWER LEVEL 050-298 DOCKET T10.

UNIT Cooper Nuclear Station DATF.

11-8-83 COMPLETED BY, P. L. Ballinger t

TELEPHONE 402-825-3811 MON 1y October 1983 DAY AVERAGE DAILY POWER LEVEL DAY AVERAGE DAILY POWER LEVEL (MWe-Net)

(MWe-Net) 581 485 37 401 18 484 2

490 483 3

39 469 4

482 20 486 485 5

21 482 6

AR4 22 488 7

23 377

=

488 490 g.

24 379 492' 9

25 30 484 547 26 639 484 13 27 615 480 12 28 619 482 13 29 603 390 14 30 486 15 3

481 383 16 INSTRUCTIONS On this format. list the average daily unit power levelin MWe Net for each day in the reporting month. Compute to the nearest whole megawatt.

(9/77) l l

y g.

- e,. -, -

r v..-.-

9 050-298 DOCKET NO.

UNITSHUTT) OWNS AND' POWER REDUCTIONS UNIT NAME cooper Nuclear Station DATE 11-8-83 COMPLETED By P. L. Ballinger October REPORT MONTil TELEPHONE 402-825-3811 5

c

.] g

'h jU Licensee Eg gn.

Cause & Corrective Action to No.

Date h

Eg js5 Event g7 g3 H

fE 5

3 5 =E Report *r mV U

Prevent Recurrence ou 6

83-7 831001 S

0 11 NA NA NA NA Reduce power for weekend load der.and and load following 4

1 i

I 2

3 4

F: Forced Reason:

Method:

Exhibit G Instructions S: Scheduled A-Equipment Failure (Explain) 1-Manual for,Preparatien of Data B. Maintenance of Test 2 Manual Scram.

Entry Sheets for Licensec l

C-Refueling 3 Automatic Scram.

Event Report (LER) File (NUREG-D Regulatory Restriction 4-Other (Explain) 0161)

E Operator Training & Ucense Examination F-Administrative 5

Exhibit I Same Source j

G-Operational Error (Explain) 19/77)

Il-Other (Explain)

(

OPERATIONS NARRATIVE Cooper Nuclear Station October 1983 The plant is operating at reduced power levels for the fall and early winter months to allow extension of the operating cycle to October 1984. On October 1, 1983 power was reduced for load following and

. to begin the low power extended cycle operating strategy. The plant operated the remainder of October with no unscheduled power reduction or outages.

4

)

m e

3- -

s

    • h1h55!$$$fkh.$h^"'"

h Nebraska Public Power District CNSS830700 November 8, 1983 Director, Office of Management Information and Program Control U.S. Nuclear Regulatory Commission Washington, D.C.

20555

Subject:

Monthly Operation Status Report for October 1983 Docket No. 50-298 Gentlemen:

Enclosed for your information and use is the Cooper Nuclear Station Monthly Operating Status Report for October 1983. The report includes Operating Status, Average Daily Unit Power Level, Ur.it Shutdown data, and a Narrative Summary of Operating Experience.

Should you have any comments or require additional information regarding this report, please contact me.

Sincerely, Yl P. V. Thomason l

Division Manager of Nuclear Operations ure cc:

G. D. Watson w/ enc.