Monthly Operating Repts for Aug 1991 for McGuire Nuclear Station Units 1 & 2
ML20082S753
Person / Time
Site: McGuire, Mcguire  Duke Energy icon.png
Issue date: 08/31/1991
From: Moser S, Robert Williams
DUKE POWER CO.
To:
Shared Package
ML20082S743 List:
References
NUDOCS 9109170269
Download: ML20082S753 (10)


Text

-

4 CFERAllNS[ATAFIF081 DDCfEl ND SMi9 DA1E [ukPdL.lldiil OPERn11N5 STAftlS COMPLEftbif,_.2di_y11Mtet,_

1ELEh80RE 704-37F59B7 1 Unat hase McGuire 1

2. Reporting Ferledt Agust 1,1991-August 31,1991
3. Liter.ted thereal Po.er (Nth 3411

.4. Naseplate Rating (Stras FWeh 1305!

bles.INeseplateEating

5. Design Electrical Fating (liet rWe):

1190 (Dress NWel calculated as

6. Nileus Dependable Capacity (Bross nWeir

!!?!

1450.000 MVA

.90 power

7. Manisus Dependable Capacity (Net' PWe):

1129.

fetter ttr Fage til,

[

8. If Changes Occur in Capacity Ratings (Itest Wester 3 Through 7) Since Last N'AE6-0020.

l fepert. Give F.eatents __

j

~

9. fomer tevel 10 Which N stricted, if Any (Net NWe):

10, Feason for Restrictions, if any _

~

i i

ihls Month

'yr.-to-Cate Cueulitive i

11. Hours in Rept,rting Period 744.0 5B31.0 65463.0
12. Wuater Of Hocrs Reactor Was Critical 744.0 5304.1 60970.1
13. Featter Reserve Shutdown Heurs

- 0.-

--0.-

-.0..

14.HearsGeneratorOn-line=

744.0 5209.2 60309.2 l!. Unit Feserve Shutdown Hours.

-.0-.

'. 0-.

..o.-

16. Guss Theraal Energy Benerated (pal 2534664 17626733 16%62295 i

17.GrossElectricalEnergyGeneratedIMWHi 850212 5079179 63301614

[

19.NetElectricalEnergyGeneratedIMW) 8101E6 5B44P94 6043P482 i

-19. Unit $erviteFattor-100.0 90.7 70.6 20.taitAvailabilityfatter 100.0 90.?

70.6 f

21. 1 nit Upacity Fatter (Using MDC Net) 97.4 BB.B 61.2 5
22. Unit Captity fatter (Dstng DER Net) 93.2

.84.9

$9.9 -.

i 23li:fiitforcedOuta;eRate o,0 9.3 12.6

24. Shutdown Scheduled Over Nest 6 Months (Type Date, and Duration of Earhh l

Refueling - September 20,1991 - 9 weeks

25. If Shut Down At End Of Peport Period. Estiaated Date of Stittuoi d
26. Units in Test States (Prior to Consercial Operationit fereceu Achieved

{

IN111At CU11CAlliy

~

INITIH!, ELECTRIClif CCMEFCI AL Of EF ATION k369 O

PDR

I i

4 l

1 OfE MilN& DAIA R[FORI DOCl[I N)

$0 J69 UNil _ McGuire 1 tall'dB8 Ff 13 1991

?

COMPLETfD R F.A. Willite1 ittIPH0AE 704 373490L MONTH Ayggt.1992 LA( :

AVlMGl DAILV F0WER LEVEL LA1 A',TMSC DAILY FCWIR LhTL (We-het)

(MWe Net)

'i 11[3 17 -

1101 2

1101 1B 1100 3

1101 19

- 1115 4

1103 20 1099 10?9 il 10Y6 6

1101 22 1111 i

7 1103 23

-1117 81 1101 24 -

1039

- 9' 1102 E5 1095 l

l

-10 1101 26 1095 11 1097

??

1097 l-I 12-1099 PB

'1090

~ 13 -

t101 89 1099-l --

14 1 15 30 110P 15 1104-31 1101 16 ljW i

1 w

s vwkuv ve we a a tsyn re u.,w-y 9.--man.

^er.

i l

il UNIT SHUTDOWNS AND POWER REDUCTIONS DOCKET NO.

50-369 UNIT NAME nu,uiKL 1 4:

DATE vy/14/ v 1

')

2 REPORT MONTH Auaust 1991 COMPLETED BY s.

n.

Mudt,x.

J' T*1EPHONE

< i v 41 -J e J-:> t t>z 4

(1)

{2) Q_

(4)

(5)

E HOD i

iT A

OF LICENSE N'

Y lS SHUT EVENT SYS-CAUSE AND CORRECTIVE O

P DURATION O

DOWN REPORT TEM COMPONENT ACTION TO DATE E

HOURS N

R/X NO.

CODE CODE PREVENT RECURRENCE' NO SHUTDOWNS OR REDUCTION S A

1 4

j.

i

.lj

j' i

i i:

(1)

(2)

(3)

(4)

F Forced Reason:

Method:

Exhi*'t G - Instructions J

S Scheduled A-Equi ment Failure (Explain) 1-Manual for

'aration of Data B-Main enance or test 2-Manual Scram

Entr, sets For Licensee 4

i:

C-Refueling 3-Automatic Scram Event a rt (LER 4-Other (Explain)

File (

G-Ol61))

D-Regulatory Restriction E-Operator Training & License Examination F-Aaministrative (5)

G-Operator Error (Explain)

Exhibit I - Sa=e Source i

H-OJ1er (Explain) i;

}

I r-w, py gm q4 w.

w-m,.

..-g__..,y.--.--

-a..,,,

weg,7-,_m~p_,

e g

g.p1.m 9,.g y

.g

_,.pyi e.,y, m-9.m p

gep

,,w,-%.y, 9 -m.y

+,y-wyop, m-m-y,w-,.mr--.-,g--avg, y

ywy.,-3,w-.7

-,,.qyog g.

.,.m,-,yyq#.-

-,yw-.-,

,,97- - - -p--,.y-

i i

i 4

4 i

DOCKET NO:

$0 369 l

,+

I UNIT: McGuire 1

)

i l

DATE:

9/13/91 l

NARRATIVE

SUMMARY

l i

MONTil: August.1991

[

HeGuiro Unit I began the month of August operating at 100t full power.

The unit operated at or near 100% full power for the entire tnanth.

- and endesd the month operating at 100% full power.

]

i e

I i

i

. i f

1 i

i e

i i;

5 L

. c l

i I

t i

t t

l.

I f

l r

I

- Prepared by:

S. W. Moser Telephone:

704-373-5762 r.

l I

e

{

t

.P e

=

-*see---%~*w-wev---e-&

-*e----e--r e-w ' + r s e

--r--,

w-e.e-twr e-- enw w w w we-t-r e--ww w -t e e-ww + =r -vu % r'--

e

+c

--ww u,--+-e-m-r--+<--

    • re ee tv
  • v m w-ihm-

= -*

--*++r V-e-'**

m

i HQJR11LY REFUELING INFORMATION REQUEST l

l 1.'

Facility namo s.jicGuire. Unit i 2.

Scheduled next refueling shutdown:

September 1991 3.

Scheduled restart following refueling:_ November 1991 l

Tile PROJECT MANAGER liAS BEEN ADVISED BY SEPARATE COMMUNICATION OF ANY T.S.

Cl!ANGE OR LICENSE AMENDMENT. TilEREFORE, QUESTIONS 4 TilROUGli 6 WILL NO LONGER BE MAINTAINED IN TNIS REPORT.

4.

Will refueling or resumption of operation thoroaf ter - require a technical specification change or other license amendment?

l If yes, what will these be?

If no, has roload design and core configuration boon reviewed by Safety Review Committoo regarding unreviewed safety questions?

5.

Scheduled date(s) for submitting proposed licensing action and

[

supporting information:

[

6.

Important licens4ng considerations (now or-different design or i

supplier, unroviewed design or performance analysis methods, significant changes in design or now operating proceduros).

7.

Number of fuel assemblies (a)

-in tho core:

122 (b) in the spent fuel pools 142 8.

Present licensed fuel pool capacity: 1463 Size of requested or planned increase:

9.

' Projected data of=last refueling which can be accommodated by present licenned capacity: March 2006 DUKE POWER COMPANY DATE:

Sentomber 13. 1991 Namo of

Contact:

1.

A. Reavis Phones 704-373-7567_

. _ _ _. _ _ _ -. _. -.. _ _ _ _ _ _ _. - ~ _ _. _ _. _ _ _ _ _ _. _ _ _... _.,

+

n

{

00U A1169 M TA Rtf0ki i

DOCfE1 NO M 370 t' ATE Srctteter 13. 1991

~ 0FCullNGSTATUS COMPLEifDFf R. A. Willien TEttFH%t 704-373-590'l

't. ilnit Ninet McGuire 2

2. Reprting Perled: August.li 1991 August 31,1991
3. Licensed it.ersal Pever (Ntli 3411 3
4.NaseplateRating(BressNWelt-1305 Notes *Nastplate Rating
5. Design flettrital Reting (Net fWelt 1190 (Gress NO talculated as
6. Euleus Dependat!r Capacity (Stoss MFe):

!!71 1450.000 WA

.90 power 7.MuismeDeper,dahlsCaptity(NetMWe):

1129 fatter per Fage ill,

9. If Changes 0:tur in Captity Eatings liteet Nusber 3 Through 7) Since Last NUfE6-0020.

Report. Give Reasons -

9. Fewer Level To Which Restricted, If Any thet Se):
10. I;esson for F ntricticrm if anyt l

Ibis Month fr. to Date

- Cueulative t

= 11. Hours in Rtport.ng feriod 744.0 5931.0 65759.0

- 12. Naaber Of Hours Reactor Was Critical 744.0 5756.8 504?6.9

13. Reactor Resent htdown Hours

-+-

-+-

-+-

14. Hours Generator O d irie 744,0 57B3.9 495E6.6
15. Unit Feserve Shutdown Hours ~ -

--0--

16. Eress Thereal Energy Benerated (MWH)
2528077

-19254290

- 1616590B1

17. Bross Electrical Energy Generated (NH) 860740 6710232 56639433-

- 18. Net Electrital Energy Generated (NH) 027732-6455354 54319000

19. Ur.it Service facter
00.0 99.2 75.4
20. Unit Availability f actor 100.0 99.2 75.4 21.UnitCaptityFacter(UsingICCNett 99.5 99.1 72.0
22. Unit Ca pcity f6t %r (Using t<ER Wett 94,3 93.0 70.0

- 23. OMt force 6 Datage tate 0.0 0.8 B.2

24. Ehutecen Schehltd Over Weit 6 Months (type, Date, and Duratir,n of Each):

None=

25.=lf Shut Down At End Of Eepert Perloc. Estimated Date of Startup:

26.1)nitsInTestStatus(FricttsCosaercialOperatien):

forecast Achieved INITIAL CRITICAllif INillAL ELECTRIC 11Y CCMEP.CtAL OPEFA110N F

1 w-y-c,-e,wg-w=

v eys,.. -

--w-,rm-wv,,y

, - g w, w

--+w%+-'uw-*-+e+-+W*aw'

-e w wr W"7

'wv--EM'W e-***we-'ve-

+ rug-

>%'e-Www.9'*WV***"*Pu m +rv v v+ m

t i

OfERA11NSDATAECF3R1 l

DDCt(1 NO M-370,_,,,,,

ilNil PtGuire E LATEfertreter 13. 1991 l

COMPLEllDitY F. A.111111111 TELEPHONE 704-373-5987

{

r ONTH A m st.-1091

)

- El AVER 46E DAILY PDkER_Lt 4L:

LA1 AVEFAGE LAILY POWER ((YEL i

-InWr-Net 1 (MWe NetL 1117 17 1106 f

'2 110B

. 18'

!!!0 3

till 19 1117

[

4 1116-P0 1])6 f

-f

-5 1113 El 1112 6

1114 22 1114 7

1115 23 1113 B

1116 24 1099-i 9

1111 25 till 10 -

1113 26 1114 11

'1112 27 1113

[

{

it 1113 28 _

1114 13 :

1116 29 t ill_

in-1116 30 1114 I

15 Illi___

31 -

1106

.[

[

16 1114 i

i f

i

[

_t s

UNIT SHUTDOWNS AWD POWER REDUCTIONS DOCKET NO.

50-370 UNIT NAME Mwoint 2 DATE us/ Laj y k REPORT MONTH Tugust 1991 COMPLETED BY d.

w. Mus t.K -

TELEPHONE

(/u+1-aea-3foz (1)

{2) g_

I(4)

(5) l E

HOD T

A-OF LICENSE N

Y S

SHUT EVENT SYS-CAUSE AND CORRECTIVE O

P DURATION O

DOWN

~ REPORT TEM COMPONENT ACTION TO DATE E

HOURS N

R/X NO.

CODE CODE PREVENT RECURRENCE NO SHUTDOWNS

'OR REDUCTION S f

r 1

t F

i I

t Forced eason-ethod:

xhibit G - Instructions S Scheouled A-Equipment' Failure (Explain) 1-Manual for Preparation of Data i

B-Maintenance or test 2-Manual Scram Entry Sheets For Licensee I

C-Refueling 3-Automatic Scram Event Re rt (LER 4-Other (Explain)

File (

G-Ol61))

l D-Regulatory R9striction E-O erator Training & License Examination rYr or 5ibit I'- Same Source' H-O her (Explain) (Explain) e 1

I i

i i

t 4

--my-+

ym.1 a-m..e

,..yyy,y.-%

y%.

m,.

.s--,9.4-y,..,oy.,.,q,.g.

3r,

.e 7-w-er.-,

r.

y q,,m._-yw.spm.

-%.,-wyy-,,r.,,.---,,e. e w yn_-

.-._,ow.,-.,.-pe%

.y m..w v.

. p

,e-,*-,wy,_yys

-w.co.,y-

9 DOCKET NO:

50 370 UNIT: McGuiro 2

-DATE:

9/13/91 NARRATIVE

SUMMARY

MONTH: August 1991 McGuire Unit 2 began the rnonth of August operating at 100% full power.

The unit operated at or near 100n full power for the entire rnonth.

- and ended the inonth operating oc 100% full power, s

a R

i

=

l f

f.

l 1

l l

i i

i i

p

-,.. =,.,.,.

- -. ~.

__ _ m.

jiQ1{IHLY REFUELING Il4 FORMATION REQUEST 1.

Facility name: McGuire, Unit _2 2.

Scheduled next refueling shutdown:

JanRG.rv 1992 3.

Scheduled restart following refueling:-March 1992 TIIE PROJECT MANAGER liAS BEEN ADVISED BY SEPARATE COMMUNICATION OF ANY T.S.

CilANGE OR LICENSE AMENDMENT. THEREFORE, QUESTIONS 4 THROUGH 6 WILL NO LONGER BE MAINTAINED IN THIS REPORT.

'4.

Will refueling or resumption of operation thereafter require a technical specification change or other license amendment?

If yes, what will these be?

If no, has reload design and core configuration been reviewed by Safety Review Committee regarding unreviewed safety questions?

5.

Scheduled date(s) for submitting proposed licensing action and supporting infarmation:

6.

Important licensing considerations (now or different design or

supplier, unreviewed design or performance analysis methods, significant changes in design or new operating procedures).

7.

Number of fuel accomblies (a) in the core:

122 (b) in the spent fuel pool:

5JLR 8.

Present licenced fuel pool capacity: 1411 Size of requested or planned increase:

9.

Projected-date of last refueling which can be accommodated by present licensed capacity: Dagember 2003 DUKE POWER COMPANY DATE:

September 13. a3y.1 Name of

Contact:

J_,

A. Reavis Phone:

704-373-7567 w-