NPDES Noncompliance Notification:On 831018 & 20,high Average Suspended Solid Levels Occurred in Heating Boiler Effluent. No Sample Obtained from Steam Generator Starting Flash Tank on 831024,26,28,30 & 31
ML20082Q587
Person / Time
Site: Cook  American Electric Power icon.png
Issue date: 11/30/1983
From: Will Smith
INDIANA MICHIGAN POWER CO. (FORMERLY INDIANA & MICHIG
To: James Keppler
NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION III)
References
NUDOCS 8312120266
Download: ML20082Q587 (2)


Text

b/nB

~

& * $)

D'**,"J0 LANA &_ MICHIGAN ELEC RIC COMPANY DONALD C. COOK NUCLEAR PLANT P.O. Box 45R, Bridgman, Michigan 49106 (616) 465-5901 November 30, 1983 Mr. J.G. Keppler, Regional Administrator United States Nuclear Regulatory Commission Region III 799 Roosevelt Road Glen Ellyn, IL 60137 Operating License DPR-58/74 Docket No. 50-315/316

Dear Mr. Keppler:

Pursuant to the requirements of Appendix B, Part II, Nonradiological, Environmental Protection Plan, Section 3.2, a copy of the report to the Michigan Water Resources Commission notifying them of high average suspended solid levels in the Heating Boiler effluent on October 18 and 20, 1983, and that no samples were obtained from the Steam Generator Starting Flash Tank on October 24, 26, 28, 30 and 31, 1983, during unit startup, is attached.

This report is required by Amendment No. 54 to Facility Operating License No. DPR-58 and Amendment No. 40 to Facility Operating License No. DPR-74 dated May 6, 1982.

Sincerely, W.

.S ith, Jr.

Plant Manager

/bab Attachment cc:

John E. Dolan INPO M.P. Alexich PNSRC R.F. Kroeger J.F.

Stietzel H. Brugger E.L. Townley E.R.

Swanson, RO:III Dir., IE (20 copies)

R.C. Callen, MPSC Dir., MIPC (2 copies)

G. Charnoff, Esq.

H.R. Denton J.M. Hennigan h,5 R.O. Bruggee, EPRI 8312120266 831130 PDR ADOCK 05000315 S

PDR Jg,x l

,~ _

1._

^ ~ ~ ~

~

e

,d S

.I QZL. INDIANA & MICHIGAN ELECTRIC COMPANY ONE SUMMIT 5QUARE P. O. BOX 60. FORT WAYNE IN.44001 Telephone (219) 425 2111 November 16, 1983 RIC11ARD C. AIENGE Vice President William Marks

'~

Acting Technical Secretary Michigan Water Resources Commission Stevens T. Mason Building P.O. Box 30028 -

Lansing, Michigan 48926 Re: D. C. Cook Nuclear Plant NPDES Permit No. MI 0005827 Groundwater Limitation

Dear Mr. Marks:

A review of our NPDES monthly monitoring report revealed that on two occasions total suspended solids samples from heating boiler blowdown prior to mixing with cooling water were 148.6 mg/l and 107.1 mg/l on October 18 and 20 respectively.

Both nuclear units were out of service requiring the use of the heating boiler.

Since the heating boiler had not been in use for some time, the blowdown effluent samples were not considered to be representative.

Cook Nuclear Unit #1, which was out of service since July 15,1983, was restarted on October 24, 1983.

Power ascension after this extended outage was completed on November 2,1983.

During this start-up period, when the starting flashtank was in operation, no sampling point was available.

No sampics were obtained for October 24, 265 28, 30 and 31.

Since 100% power was reached, blowdown sampling has been performed as required.

t Very truly yours,

[

l R. C. Me e

Vice President l

RCM/be cc:

W. G. Smith l

1 certify under penalty of law that I have personally examined and am familiar with the information submitted in this and all attached documents; and based l

on my inquiry of those individuals immediately responsible for obtaining the information, I believe the submitted information is true, accurate and complete.

I am aware that there are significant penalties for submitting false information, including the possibility of fine and imprisonment.

I R. C. Men e bc:

R. W. Jurgensen i

T. A. Kriesel J. A. Wojcik J. P. White R. W. Reeves /C. E. Hawk R. E. Zahler

~

--