Final Deficiency Rept Rdc 32(81) Re Irregularities in Bailey 720 Station Devices Supplied by GE in Power Generation Control Complex Panels.Initially Reported on 810626.Devices Returned to Bailey.Corrective Action Completion by 840301
ML20082P993
Person / Time
Site: Perry  FirstEnergy icon.png
Issue date: 11/29/1983
From: Edelman M
CLEVELAND ELECTRIC ILLUMINATING CO.
To: James Keppler
NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION III)
References
RDC-32(81), NUDOCS 8312090269
Download: ML20082P993 (2)


Text

, ._ __

pb yit

, si i;

, -l

.' ,,4 4i 1 P.O. BOX 5000 - CLEVELANo. OHIO 44101 - TELEPHONE (216) 622-9800 - lLLUMINATING BLOG. - 55 PUBLIC SQUARE Serving The Best Location in the Nation November 29, 1983

. rf } i' L MURRAY R. EDELMAN VICE PRESIDENT ~

NUC LE A R +

Mr. James G. Keppler Regional Administrator, Region III Office of Inspection and Enforcement U.S. Nuclear Regulatory Commission 799 Roosevelt Road Glen Ellyn, Illinois 60137 RE: Perry Nuclear Power Plant Docket Nos. 50-440; 50-441 Bailey 720 Utility Stations

[RDC 32(81)]

Dear Mr. Keppler:

This letter serves as the final report on the potential significant deficiency concerning Bailey 720 Utility Station devices supplied by General Electric (GE) in various Control Room Panels and Local Panels located in the Power Generation Control Cornplex (PCCC). This item was originally identified to Mr. McGregor of your of fice on June 26, 1981, by Mr. W. Kacer of The Cleveland Electric Illuminating Company (CEI). Interim reports nn this subject were submitted July 24, 1981, and April 29, 1983.

This report contains a description of the deficiency, an an21ysis of safety implication, and the corrective action taken.

Description of Deficiency Due to irregularities in the plastic part used in the switch assembly, push-buttons in Bailey 720 Utility Station devices may stick in an open or closed position. This condition was identified to CEI by GE on May 13, 1981.

Analysis of Safety Implicap on The Bailey 720 Utility Statioi. devices are utilized for safety-related manual control functions. A defective device could cause a false operating signal to be transmitted during manual operation. This could result in the technical specifications being exceeded during a postulated plant event.

Corrective Action All Bailey 720 Utility Station devices contained in the Unit 1 and Unit 2 PCCC panels were removed and returned to Bailey for rework as required by GE Field Deviation Disposition Requests (FDDR) KL1-671, KL2-600, and KL1-2007. All the 1

9

/

8312090269 B31129 PDR ADOCK 05000 S DEC 2 1983 u

.- . Mr..Jcmes.C. Kappist November 29, 1983 station devices but the three (3) identified on FDDR KL1-2007 and relay 8832 on FDDR KL1-671 have been returned to Perry, inspected, accepted, and installed in the PGCC panels. Bailey is expected to return the remaining devices before February 1, 1984. Upon receipt, the devices will be inspected and, if acceptable, installed in the panels. - It is anticipated that all corrective action concerning this matter will be completed by March 1, 1984.

Please call if there are any additional questions.

Sincerely,

' N.

Murray R. IMelman Vice President Nuclear Group MRE:pab cc: Mr. M. L. Gildner NRC Site Office Director Office of Inspection and Enforcement U.S. Nuclear Regulatory Commission Washington, D.C. 20555 U.S.' Nuclear Regulatory Commission c/o Document Management Branch Washington, D.C. 20555 Records Center, SEE-IN Institute of Nuclear Power. Operations 1100 Circle 75 Parkway, Suite 1500