500 08 %9
[g k
UNITED STATES g
g NUCLEAR REGULATORY COMMISSION g
4y WASHINGTON, D. C. 20555 4,.....,8 f
I f
CAROLINA POWER & LIGHT COMPANY-DOCKET NO.'-50-324
~
BRUNSWICK-STEAM ELECTRIC PLANT, UNIT 2
~ AMENDMENT TO FACILITY OPERATING LICENSE Amendment No. 84 License No. DPR-62 1.
The Nuclear Regulatory Comission (the Comission) has found that:
A.
The application for amendment by Carolina Power & Light Company (thelicensee-) dated. December 13, 1982 complies with.the standards and requirements ~of the Atomic Energy Act of 1954, as amended (the Act) and the Commission's rules and regulations set forth in 10 CFR Chapter I; B.
The facility will operate in conformity'd regulations of the with the application, the provisions of the Act, and the rules ~an Comission; C.
There is reasonable assurance (i) that the activities authorized by this amendment can be conducted without endangering the health and safety of the public, and (ii) that such activities will be conducted in compliance with the Comission's regulations;
.SZiQ
. Di-The. issuance of this amendment will not be inimical to the.
I M
comon defense and security or to the health and safety of the public; and
~
E.
The issuance of this amendment is in accordance with 10 CFR Part 51 of the Comission's regulations and all. applicable requirements have been satisfied.
2.
Accordingly, the license is amended by changes to the Technigal Specifications as indicated in the attachr5ent to this' iftensb amendment,.
and paragraph 2.C.(2) of Facility Operating License No. DPR-62 is hereby amended to read as follows:
4 F
- 8312090125 831128 PDR ADOCK 05000324 P
pyg
~;,
2-2.
Technical Specifications
~
The Technical Specifications contained in Appendices A and B, as revised through Amendment No. 84, are hereby incorporated in the license. The licensee shall operate the facility in accordance with the Technical Specifications.
~
3.- This license amendment is effective as of the date of its issuance.
FOR THE NUC EAR REGULATORY C0ttilSSION
^
o -
g Domenic B. Vassallo, Chief Operating Reactors Branch #2 Division of Licensing 9
Attachment:
Changes to the Technical Specifications Date of Issuance: November 28, 1933 6gM"#
4 e
8 o.
e 2
t e
9
-~
..r--.-
l I
ATTACHMENT TO LICENSE AMENDMENT NO. 84 FACILITY OPERATING LICENSE N0. DPR-62 DOCKET NO. 50-324 Revise the Appendix A Technical Specifications as follows:
l Remove Insert l
3/4 3-14.
3/4 3-14 l
-i 3/4 3-14a 3/4 3-14a l
l l
1 e
9mM
- i t
t-r 1
v 4
(
- *a e
e 9
i cy-
..)
TABLE 3.3.2-1 (Continued) n,x h
ISOLATION ACTUATION INSTRUMENTATION-5 Q
VALVE CROUPS HINIMUM NUMBEi APPLICABLE OPERATED BY OPERABLE CIIApNELS.
. OPERATIONAL TRIP FUNCTION AND INSTRUMENT NUMBER SIGNAL (a)
PER TRIP SYSTEM (b)(c) CONDITION ACTION c:
?$
4.
CORE STANDBY COOLING-SYSTEMS ISOLATION a.
liigh Pressure Coolant Injection System Isolation
~
1.
IIPCI Steam Line Flow - Iligh 4
1 1, 2, 3 25 l
(E41-dPIS-N004 and E41-dPIS-N005) 2.
IIPCI Steam Supply.-Pressure - Lou 4 2
1, 2, 3 25 (E41-PSL-N001A,B,C,D) 3.
IIPCI Steam Line Tunnel Temperature - liigh 4
2 1, 2, 3 25 u,
3:
(E41-TS-3314; E41-TS-3315; c,
4 E41-TS-3316; E41-TS-3317; E41-TS-3318; i
E41-TS-3354;
\\
E41-TS-3488; E41-TS-3489) 4.
Bus Power 1fonitor NA(h) 1/ bus 1, 2, 3 26 '
,(E41-K55 and E41-K56) 4 5.
IIPCI Turbine Exhaust Diaphragm Pressure - liigh 4
2 1,2,3 25 f
(E41-PSil-N012A, B,C, D) a 6.
IIPct Steam Line Ambient Temperature - Iligh 4
1 1, 2,.3 25
- l'
.(E51-TS-N603C,D) zo 7.
IIPCI Steam Line Area A Temp. -
Iligh 4
1 1, 2, 3 25 l
.(E51-dTS-Il604C, D) 8.
Emergency Area Cooler Temperature - liigh 4
1 1, 2, 3 25 l
(E41-TS-N602A,B)
'I l.' i *
, c Si I
N,.
p.
TABLE 3.3.2-1 (Continued)
E E
ISOLATION ACTUATION INSTRUMENTATION E
tlINIMUtl NUMI}kR M
P.
VALVE CROUPS APPLICABLE OPERATED'BY OPERABLE Cl)ANNELS OPERATIONAL W
TRIP FUNCTION AND INSTRUMENT NUMBER SIGNAL (a)
PER TRIP SYSTEM (b)(c) CONDITION ACTION Q
y b.
Reactor Core Isolation Cooling System Isolation 1.
RCIC Steam Line Flow - liigh 5
l' 1, -2, 3
25 l
l (E51-dPIS-N017 and E51-dPIS-N018) 1, 2, 3 25 2.
RCIC Steam Supply Pressure - Low 5
2 i
(E51-PS-N019A,B,C,D) 3.
RCIC Steam Line Tunnel Temperature
- liigh 5
2 1, 2, 3 25 (E51-TS-3319;
^
E51-TS-3320; u)
E51-TS-3321; E51-TS-3322; w
,L E51-TS-3323; 7
E51-TS-3355;.*
E51-TS-3487) j 4.
Biis Power Monitor NA (h) 1/ bus 1, 2, 3 26 (E51-K42 and E51-K43) 5.
RCIC Turbine Exhaust Diaphragm 2
1, 2, 3 25 Pressure - liigh 5
(E51-PS-N012A,B,C,D) l 6.
. RCIC ' Steam Line Ambient Temp -
liigh 5
1 1, 2, 3 25 l
(E51-TS-N603A,B)
+
m M
7.
RCIC Steam Line Area A Temp - liigh 5
1 1,2,3 25 l
R (E51-dTS-N604A,B) y 8.
- RCIC Equipment Room Ambient Temp - Iligh 5
1 1,
2, 3 25 l
(E51-TS-N602A,B) m 9.
RCIC Equipment Room A Temp - liigh 5
1 1, 2, 3 25 l
(E51-dTS-N601A,B) 9 9
I%
UNITED STATES NUCLEAR REGULATORY COMh0SSION
[
y (f,j g
WASHINGTON. D. C. 20555 g/
e k V'p#
~!
SAFETY EVALUATION BY THE OFFICE OF NUCLEAR REACTOR REGULATION SUPPORTING AMENDMENT N0.
58 TO FACILITY LICENSE NO. DPR-71 AND AMENDMENT NO. 84 TO FACILITY LICENSE NO. DPR-62 CAROLINA POWER & LIGHT COMPANY B_RUNSWICK STEAM ELECTRIC PLANT, UNITS 1 AND 2
, DOCKET NOS. 50-325 AND 50-324 N.
Intro'uction 1.0 d
By letter dated December 13, 1982, the Carolina Powe'r & Light Company (the licensee) submitted proposed changes to the Technical Specifications appended to Facility Operating License Nos. DPR-71 and DPR-62 for the Brunswick Steam Electric Plant (BSEP), Units 1 and 2.
The proposed changes revise'the Technical Specifications to reflect a change in the identified numt'er of operable channels per trip system for the following different functions,' all related to " Isolation Actuation Instrumentation":
(1)
High Pressure Coolant Injection (HPCI) Steam Line Flow - High, (2) HPCI Steam Line Ambient Temperature - High, (3) HPCI Steam Line Area Differential Temperature -- High, (4) Emergency Area Cooler Temperature - High, (5)
Reactor Core Isolation Cooling (RCIC) Steam Line Flow - High, (6) RCIC Steam Line Ambient Temperature - High, (7) RCIC' Steam Line. Area Differential Temperature - High, (8) RCIC Equipment Room Ambient Temper:ture - High, and (9) RCIC Equipment Room Differential Temperature - High. The changes are administrative in nature and correct the technical specifications so they will represent the plant as it is today, and :: it was designed and constructed. The changes will provide consistency in the use GT terms and numbers on'a table in the technical specification which presents the various
~
trip functions, the minimum number of operable channels per trip system, and
-other unchanged requirements.
2.0 5 valuation i
Each of the nine identified proposed changes would change the " minimum number of operable channels per trip system" from "2" to "1".
The proposed changes do not involve either the addition, deletion or modification of plant instrumentation. The change is purely one of clarification of 1
terminology, i.e., administrative.
In each of.the nine functions, two switches are provided.
Each of these switches supplies a signal to one of two logic systems. 'herefore, the proper description for each' function is that there is one channel for each of two logic systems, either of which is able to provide the, required protective action. Therefore, the change is acceptable since it correctly states the instrument arrangement actually in existence...
e
f
\\
2-3.0 Environmental Consideration We have determined that the amendment does not authorize a change in efflu(nt types or total amounts nor an increase in power level and will not result in any significant environmental impact. Having made this determination, we have further concluded that the amendment involves an action which is insignificant from the standpoint of environmental impact and, pursuant to 10 CFR 51.5(d)(4), that an environmental impact statement or negative declaration and environmental impact appraisal need not be prepared in
,_ connection wi,th.the issuance of this amendment.
4.0 Conclusion We have concluded, based on the considerations discussed above, that:
(1) l there is reasonable assurance that the health and. safety of the public will i
not be endangered by operation in the proposed manne'r, and (2) such activities will be conducted in compliance with the Commission's regulations and the issuance of this amendment will not be inimical to the common defense and security or to the health and safety of the public.
ju m
Principal Contributors:
J. Carter D. Hoffman Dated:
November 28, 1983