l NUREG-0580 Vol.12, No.10 REGULATORY LICENSING STATUS

SUMMARY

REPORT NUCLEAR POWER PLANTS DATA FOR DECISIONS (BLUE BOOK?

OCTOBER 1 - OCTOBER 31,1983 UNITED STATES NUCLEAR REGULATORY COMMISSION p' "'sq NfhY

AVAILABLE FROM HRC/GPO SALES PROGRAM SUPERINTENDENT OF DOCUMENTS GOVERNMENT PRIHTING OFFICE WASHINGTON, D.

C. 20402 A YEARS SUBSCRIPTIDH CONSISTS OF 12 ISSUES FOR THIS PUBLICATIDH MICROFICHE OF SINGLE COPIES ARE AVAILABLE FROM NRC/GPO SALES PROGRAM WASHINGTON, D.' C. 20555 l

l 1

1 l

NUREG-0580 Vol.12, No.10 REGULATORY LICENSING STATUS

SUMMARY

REPORT NUCLEAR POWER PLANTS DATA FOR DECISIONS (BLUE BOOK)

OCTOBER 1 - OCTOBER 31,1983

$ ate 5uNfshe ovemb r 1983 Prepared for: OFFICE OF NUCLEAR REACTOR REGULATION Prepared by: OFFICE OF RESOURCE MANAGEMENT U.S. NUCLEAR REGULATORY COMMISSION WASHINGTON, D.C. 20555 l

,p** **%,

[

F0REW0RD THIS MANAGEMENT REPORT, REGULATORY LICENSING STATUS

SUMMARY

REPORT, IS DESIGNED TO PROVIDE THE NECESSARY INFORMATION FOR CONTROLLING THE PROGRESS OF REVIEW PROCESSES FOR CENTRAL STATION NUCLEAR REACTOR APPLICATI0HS. IT UTILIZES DATA COLLECTED FROM THE OFFICE OF HUCLEAR REACTOR REGULATION, OFFICE OF THE EXECUTIVE LEGAL DIRECTOR, OFFICE OF INSPECTION & ENFORCEMENT, AND THE NATIONAL LABORATORIES, AND ANALYZED BY THE OFFICE OF RESOURCE MANAGEMENT IN THE IMPLEMENTATION OF THE REGULATORY INFORMATION SYSTEM.

SECTION I 0F THIS DITION CONSISTS OF THE THREE

SUMMARY

OF ACCOMPLISHMENTS, THE NEW APPLICATION FCRECAST FOR OL'S AND CP'S AND AN ABBREVIATION KEY.

SECTION II REPRESENTS THE MAIN BODY OF THE REPORT AND CONSISTS OF THE FACILITY INFORMATION. ALL OL'S ARE LISTED FIRST, FOLLOWED BY CP'S, STANDARD DESIGN REVIEWS, OTHER REVIEWS, AND FINALLY, A NON-POWER REACTOR

SUMMARY

. EACH PROJECT CONSISTS OF GENERAL FACILITY DATA, CURRENT STATUS FOR ALL PHASES OF THE REVIEW, AND TARGETED AND ACTUAL COMPLETION DATES FOR ALL KEY MILESTONES IN THE REVIEW.

LICENSING 0F MUCLEAR REACT 0RS THE U.S. NUCLEAR REGULATORY COMMISSION REQUIRES TWO SEPARATE LICENSES - ONE TO BUILD THE FACILITY AND ANOT l

LISTED BELOW ARE THE STEPS IN THE PROCESS OF OBTAINING A CONSTRUCTION PERMIT AND OPERATING TO OPERATE IT.

LICENSE.

i THE UTILITY SUBMITS A FORMAL APPLICATION DESCRIBING THE DESIGN, LOCATION, AND ENVIRONMENTAL IMPACT OF THE PROPOSED PLANT AND THE SAFEGUARDS TC BE PROVIDED. THE APPLICATION ALSO COVERS THE UTILITY'S FINANCIAL QUALIFICATIONS.

THE NRC MAKES COPIES OF THE APPLICATION AVAILABLE TO THE ACRS AND TO THE PUBLIC DOCUMENT ROOM. TECHNICAL THESE EXPERTS ANALYSE THE APPLICATION, AND PREPARE A SAFETY EVALUATION AND AN ENVIRONMENTAL IMPACT STATEMENT.

DOCUMENTS ARE ALSD MADE AVAILABLE IN THE PUBLIC DOCUMENT ROOM.

THE STAFF'S ANALYSIS IS SUBMITTED TO THE NRC'S STATUTORY ADVISORY COMMITTEE ON REACTOR SAFEGUARDS, A COMMITTEE OF INDEPENDENT EXPERTS. ACRS STUDIES THE APPLICATION IN DETAIL AND HOLDS CONFERENCES WITH THE APPLICANT, THE LICENSING STAFF AND OTHERS. THE ACRS FINDINGS ARE REPORTED TO THE HRC AND MADE PUBLIC.

A PUBLIC HEARING IS HELD, USUALLY HEAR THE PROPOSED SITE, BY AN NRC APPOINTED ATOMIC SAFETY & LICENSING BOARD. PRIVATE CITIZENS, STATE AND LOCAL OFFICIALS, AND COMMUNITY GROUPS MAY PARTICIPATE.

AFTER REVIEWING THE HEARING RECORD INCLUDING THE NRC STAFF AND ACRS FINDINGS, THE BOARD DECIDES FOR OR AGAINST GRANTING A CONSTRUCTION PERMIT.

THE BOARD'S DECISIDH IS REVIEWED BY THE ATOMIC SAFETY AND LICENSING APPEAL BOARD, AND IS SUBJECT TO REVIEW BY THE FIVE-MEMBER HUCLEAR REGULATORY COMMISSION.

IF THE LICENSING BOARD AUTHORIZES THE ISSUANCE OF A CONSTRUCTION PERMIT, THE DIRECTOR OF THE DIVISION OF LICENSING WILL ISSUE A CONSTRUCTION PERMIT. AN EARLIER LIMITED WORK AUTHORIZATION TO DO PRELIMINARY SITE CONSTRUCTION MAY HAVE BEEN GRANTED IF THE SITE HAD BEEN DETERMINED TO BE SUITABLE BY THE HRC STAFF AND THE BOARD HAD RULED FAVORABLY ON THE ENVIRONMENTAL IMPACT ANALYSIS. CONSTRUCTION IS SUBJECT TO INSPECTION SY THE 0FFICE OF INSPECTION AND EHFORCEMENT.

AS CONSTRUCTION PROGRESSES, ADDITIONAL INFORMATION IS DEVELOPED AND THE UTILITY APPLIES TO THE HRC FOR AN OPERATING LICENSE. THE SAME CAREFUL ANALYSIS AS IS MADE AT THE CONSTR'JCTION PERMIT STAGE IS MADE BY THE NRC IN DECIDING WHETHER OR NOT TO ISSUE THE OPERATING LICENSE.

IN THE OPERATING LICENSE REVIEW PROCESS, OPPORTUNITY FDR HE4 RING IS.PROVIDED. CONTRASTED WITH THE CONSTRUCTION PERMIT REVIEW PHASE, A HEARING IS HELD ONLY IF INTERVENTION IS GRANTED. FINAL ISSUANCE OF AN OPERATING PERMIT IS SUBJECT TO THE APPROVAL OF BOTH THE. DIRECTOR OF THE DIVISIDH OF LICENSING AND OF THE COMMISSION.

i l

1

TABLE OF C0NTEHTS PRINTED IN THE ORDER LISTED SECTIOH I

SUMMARY

OF ACCOMPLISHMENTS OL

SUMMARY

OF ACCOMPLISHMENTS CP

SUMMARY

OF ACCOMPLISHMENTS COMBINED HUMERICAL

SUMMARY

OF ACCOMPLISHMENTS TARGET DATES OF LICENSING STEPS FOR PLANTS SEEKING OPERATING LICENSES IN THE HEXT FIVE YEARS TARGET DATES OF LICENSING STEPS FOR PLANTS SEEKING CONSTRUCTIDH PERMITS IN THE HEXT FIVE YEARS HEW APPLICATION FORECAST:

OPERATING LICENSE REVIEWS SPECIAL REVIEWS COMMON ABBREVIATIONS USED WITHIN THE PUBLICATION SECTION II PROJECT INDEX OPERATING LICENSE REVIEWS CONSTRUCTION PERMIT REVIEWS STANDARD DESIGH REVIEWS OTHER REVIEWS HOH-POWER REACTORS SECTION III EXAMPLE REVIEW

.m

__E,a p

8 M

Z O

M O

L&J M

i

C 3

L 8

A

/

U 4

T 1

C

/

A 0

1 D

E E

3 T

L 8

A U

/

D D

1 E

3 O

H

/

T C

0 1

S R

A E

Y S

L A

T C

S N

I 2

F E

8 M

D M

Y 1

T E

H I

H L

O 2

U S

I Y

C N

8 S

I A

A F

C 1

S L

S O

S I

P 3 L

I 8

S E

B S

E S

R M 9 M

A N

R 1

O R

I O

A S

0 N

D N

H R

E S

C 1

3 E

S E

E L

C R

S S

D F

0 A E B

O T

F C O

0 F

O C

Y S 3

A L

8 R

A

/

U 4

A T

1 C

/

M A

0 1

M U

5 D

E 3

L 8

U

/

1 L

D E

3 0

H

/

C 0

1 R S E

B O

T C

O 2

M D

Y 1

E T

t I

'O 2

U L

I Y

C N

S A

A 1

S F

C S

O S

I R

L I

E S

E B

S E

S R

W H

A N

R O

0 R

I O

A S

P N

D H

H R

E S

S L

L E

S E

E L

U F

S D

F 0

N l

L AM ISA R

E E

T L

A U

D D

E O

H T

C S

R A

E Y

5 L

A T

C S

N I

F E

D M

Y T

E H

I L

U I

C S

I A

F S

L S

I P 3 8

E S

E E

S E

S E

E M

9 M

M M

M M

M 1

O O

R O

O O

S O

0 H

N N

N N

N R

E S

S C

1 3

E S

E E

P C

R S

S D

F C

A E B

0 1

F C O

0 F

O Y S A

L R

A U

A T

C M

A M

U S

D E

L U

P D

E C

H C

R S E

B O

T C

O D

Y T

E I

L U

I C

S A

F S

S I

E S

E E

S E

S E

E N

N M

N N

N O

O R

O O

O S

O N

N H

N N

N R

E S

5 E

S E

E P

S S

D F

C

5UMMARY 0F ACC0MPLI5HMENT5 AS OF OCTOBER 31, 1983 FISCAL YEAR TO DATE CCTOBER SCHEDULED M

SCHEDULED ACTUAL SER'S( 0L) 0 0

5ER'S( 0L)

O e

SER'S( CP) 0 0

5ER'SCCP) 0 0

f 4

i SSER'S( 0L) 0 1

SSER'S( 0L) 0 1

SSER'S( CP) 0 0

SSER'S( CP) 0 0

DES'S( 0i )

0 0

DES'S( 0L) 0 0

DES'S( CP) 0 0

DES'S( CP) 0 0

FES'S( 0L) 1 0

FES'S( 0L) f 8

FES'S( CP) 0 0

FE5'S( CP) 0 0

OL'S I5SUEDM 0

0 0L'S ISSUEDM 0

0 CP'S I$ SUED 0

0 CP'S I5 SUED 0

0 i

M FULL PCWER

LICENSING SCHEDULES FOR ALL PENDING OL APPLICATIONS REPORT AS OF 1d/31/83 (INCLUDES SCHEDULES FOR ADDITIDMAL UNITS WITH PROJECTED CONSTRUCTION COMPLETION IN CY 1983-1985)

(LISTED IN ORDER OF FACILITY MAME) f SER

$$ER EST.

STAFF TECH STAFF TECH ASLB COMMu APPL.

DELAY ISSUE INPUT ISSUE ACRS ISSUE INPUT ISSUE START INITIAL DEC.

CONST.

PLANT (MONTHS) RLi JJLRL 11R l119 ff51 10 DL lier OF HRG DECISION R&Il COMPL.

BEAVER VALLEY 2 O

07/84 07/84 09/84 1G/84 12/84 11/84 12/84 05/85 11/85 12/85 12/85 i

BELLEFONTE 1 O

12/83 06/84 08/84 09/84 05/84 10/84 12/84 N/A N/A 04/85 05/85 l

BRAIDWOOD 1 0

01/84 11/83 12/83 02/84 06/84 04/84 05/84 10/84 03/85 04/85 04/85 i

BYROM 1 0

  • f/81C 01/82C 02/82C 03/82C 04/82C 08/82C 01/83C 03/83C 12/83 01/84 02/84 l

BYRON 2 0

11/81C Of/82C 02/82C 03/82C 04/82C OS/82C 02/84 03/83C 12/83 04/85 05/85 CALLAWAY 1 0

09/81C 09/81C 10/81C 11/81C 01/82C 05/83C 06/83C 11/81C 10/83C 03/84 04/84 CATAWBA 1 0

OS/82C Of/83C O2/83C 03/83C Of/83C 04/83C 05/83C 10/83C 04/84 05/84 05/84 CLINTON 1 0

12/81C 12/81C 02/82C 03/82C 05/82C 06/82C 05/83C 12/83 N/S 12/85 01/86 COMANCHE PEAK 1 4

05/ SIC 07/81C 07/81C 11/81C 09/81C 02/84 03/84 12/81C 04/84 04/84 12/83 COMANCHE PEAK 2 0

05/81C 07/81C 07/81C 11/81C 09/81C 02/84 11/84 12/81C 04/84 11/84 12/84 DIABLO CANYON 1 0

12/72C 01/75C 10/74C 07/76C 05/76C 06/83C N/S 12/76C N/S 11/83 DIABLO CANYON 2 0

12/72C 01/75C 10/74C 07/76C 05/76C 06/83C N/S 12/76C N/S ENRICO FERMI 2 0

04/81C 05/77C 09/77C 08/81C 09/81C 01/83C O2/83C 03/82C 10/82C 11/83 12/83 GRAND GULF 1 0

OS/81C 08/8tC 09/8tC 10/8fC 10/81C 03/83C 05/83C N/A N/A 11/83 06/82C HARRIS 1 O

04/83C 11/83 12/83 01/84 10/83C 03/84 04/84 01/84 05/85 05/85 06/85 LASALLE 2 0

03/78C 02/81C 03/81C 04/81C 11/78C 10/83C 11/83 N/A N/A 11/83 11/83 1

LIMERICK 1 7

06/83C 08/83C 08/83C 10/83C 03/84 11/83C 11/83 08/84 03/85 03/85 08/84 MIDLAND 1 0

02/82C 04/82C 05/82C 06/82C 07/82C 08/82C 01/85 11/82C 10/85 10/85 02/85 MIDLAND 2 0

02/82C 04/82C 05/82C 06/82C 07/82C 08/82C 10/82C 11/82C 10/85 10/85 10/84 MILLSTONE 3 0

04/84 05/84 07/84 08/84 11/84 10/84 11/84 N/A N/A 11/85 11/25 PALO VERDE 1 0

10/81C 10/81C 11/81C 12/81C 03/82C 09/83C 11/83 04/82C 12/82C 04/84 05/84 PALO VERDE 2 0

10/81C 10/81C 11/81C 12/81C 03/82C 09/83C 12/84 04/82C 12/82C 01/85 02/85 i

PERRY 1 0

02/82C 05/82C 05/82C 07/82C 08/82C N/S 12/83 05/83C 06/84 11/84 12/84 i

RIVER BEND f 0

01/84 11/83 12/83 01/84 06/84 04/84 05/84 10/84 03/85 04/85 04/85 4

SEABROOK 1 0

05/82C 12/82C 03/83C 04/83C 12/82C N/S N/S 08/83C 09/84 09/84 09/84 SHOREHAM O

03/77C 03/8tC 04/81C 10/81C 10/77C N/S 09/83C 05/82C 09/83C 02/84 03/84 i

SUSQUEHANNA 2 0

03/81C 03/81C 04/81C 08/81C 07/81C 02/83C 11/83 10/81C 04/82C 12/83 01/84 i

WASHINGTON NUCLEAR 2 0

07/81C 05/82C 03/82C 10/82C 12/81C 11/82C 05/83C N/A N/A 11/83 11/83 i

WASHINGTON NUCLEAR 3 0

11/83 06/84 08/84 09/84 04/84 11/84 12/84 05/85 11/85 12/85 12/85 WATERFORD 3 O

05/81C 05/81C 07/81C 08/81C 09/81C 05/83C 07/84 08/83C 05/83C 04/84 05/84 WATTS 8AR 1 0

06/78C 06/82C 07/82C 08/82C 12/78C 09/82C 11/83 N/A N/A 03/84 04/84 WATTS BAR 2 O

06/78C 06/82C 07/82C OS/82C 12/78C 09/82C 06/85 N/A N/A 09/85 10/85 WOLF CREEK f 8

01/82C 03/82C 04/82C 05/82C 06/82C 10/83 12/83 01/84 06/84 07/84 08/84 ZIMMER 1 0

10/76C 12/77C 01/79C 03/79C 06/77C OS/82C 08/82C O2/82C N/S 11/84 12/84 DLICENSING SCHEDULES AND DECISION DATES DO NOT REFLECT POTENTIAL DELAY FROM EMERGENCY PREPAREDNESS REVIEW.

I

i i

LICENSING SCHEDULES FOR ALL TENDERED OL UNITS TO BE ISSUED AFTER CV 1985 ISSUE APPL. CONST.

PLANT ligg COMPLETE BELLEFONTE 2 N/$

05/86 BRAIDWOCD 2 N/S 04/86 CATAWBA 2 N/S 10/86 GRAND GULF 2 N/S N/S i

HARRIS 2 N/S 06/89 HOPE CREEK 1 02/85 01/86 LIMERICK 2 N/S 87/88 MARBLE HILL 1 04/85 06/86 MARBLE HILL 2 N/S 12/87 j

MIME MILE POINT 2 01/85 02/86 i

PALO VERDE 3 03/86 05/86 PERRY 2 N/S 11/91 RIVER BEND 2 N/S 12/86 N/S SEABROOK 2 SOUTH TEXAS 1 01/86 12/86 SOUTH TEXAS 2 N/S 12/88 i

V0GTLE 1 08/85 09/86 V0GTLE 2 03/88 WASHINGTON NUCLEAR 1 N/S N/S l

I

LICENSING SCHEDULES FOR ALL PENDING CP APPLICATIONS REPORT AS OF 10/31/83 (LISTED IN ORDER OF FACILITY NAME)

'1 SER SSER STAFF TECH STAFF TECH ASLB COPM ISSUE INPUT ISSUE ACRS ISSUE INPUT ISSUE START THITIAL DEC.

PLANT RE1 TO DL 1ER fila fli TO DL 11ER OF HRG DECISION DAIE CLINCH RIVER 02/76C 02/83C 03/83C 04/83C 02/77C 04/83C 05/83C 08/82C 04/84 06/84 l

i

)

7 k

<.,u I

}

i 4

1

NEW A P P L I C A T-I O N F 0 R E C A S T --- O P'E R A T I N G LICEN5E REVIEWS-(ANTICIPATED TENDER DATES FOR ALL UNITS WITH CONSTRUCTION PERMITS)

AS OF WEEK ENDING 10/31/83 s

1 NONE i

1 i

1 8

l I

i I

l l

l

l ljli)llll ll 3

8 R /

E 1

Df3 Nl/

EA0 W

TD1 E

I V

E R

TRR CEE EGY JAE L

ONM.

5 RA A

PMG W

I E

C I

E 3 V P 8 / E S

1 3 R

- /

0 T

1 N

S

O A G N

I C

I D T E N E A E

R S

K Z U

0 E TO E

I NH F W AG D

CN F

II O R LT N

PS S A PE O A AW D

I N J 8

T OO6 A RN6

'A P

T C

5 I

L P

P A

W R

W E

P TA N

CW E)

JS OS RH P(

C0MM0N ABBREVIATION 5 USED WITHIN THE PUBLICATION ACRS: ADVISORY COMMITTEE ON REACTOR SAFEGUARDS L.A.+

LICENSIhG ASSISTANT AE:

ARCHITECT / ENGINEER LESR LIMITED EARLY SITE REVIEW (ALSO ABBREVIATED LES)

AEB ACCIDENT EVALUATION BRANCH LGR LICENSING GUIDANCE BRANCH ASB:

AUXILIARY SYSTEMS BRANCH LMFBR LIQUID METAL FAST BREEDER REACTOR ASLB: ATOMIC SA*ETY LICENSING BOARD LQB:

LICENSEE QUALIFICATIONS BRANCH B3R:

BURN

  • a ROE MEB MECHANICAL ENGINEERING BRANCH B&V:

Blics & VEACH MPA:

MANAGEMENT AND PROGRAM ANALYSIS B4W:

BAnc0CK 8 WILCOX MTEB MATERIALS ENGINEERING BRANCH BECH: BECHTEL MWE MEGAWATTS ELECTRIC BRRT: BROWN 8 ROOT.

11WT : ' MEGAWATTS THERMAL BWR BOILING WATER REACTOR NSSS: NUCLEAR STEAM SYSTEMS SUPPLIER CEB:

CHEMICAL ENGINEERING BRANCH OL:

OPERATING LICENSE i

COMB COMEUSTION ENGINEERING OLB:

OPERATOR LICENSING BRANCH CP*

CONSTRUCTION PERMIT OPS:

OFFSHORE POWER SYSTEMS CPB:

CORE PERFORMANCE BR#NCH w

CSB:

CONTAINMENT SYSTEMS BRANCH CWE:

COMMONWEALTH EDISON PDA:

PRELIMINARY DESIGN APPROVAL PG3E: PACIFIC GAS 8 ELECTRIC DES:

DRAFT ENVIRONMENTAL STATEMENT PID:

PARTIAL IHITIAL DECISION PM:

PROJECT MANAGER PS:

POWER SYSTEMS BRANCH EEB:

ENVIRONMENTAL ENGINEERING BRANCH PSAR: PRELIMINARY SAFETY ANALYSIS REPORT EPA:

ENVIRONMENTAL PROTECTION AGENCY PTRBI PROCEDURES AND TEST REVIEW BRANCH EPLB: EMERGENCY PREPAREDNESS LICENSING BRANCH PWR PRESSURIZED WATER REACTOR ER:

ENVIRONMENTAL REPORT EQB EQUIPMENT QUALIFICATION BRANCH ESR EARLY SITE REVIEW QAB8 QUALITY ASSURANCE BRANCH ETSB: EFFLUENT TREATMENT SYSTEMS BRANCH RAB RADIOLOGICAL ASSE*SMENT BRANCH F.R.:

FEDERAL REGISTAR RSB REACTOR SYSTEMS BRANCH FDA:

FINAL DESIGN APPROVAL FES:

FINAL ENVIRONMENTAL STATEMENT FSAR: FINAL SAFETY ANALYSIS REPORT SSL:

SARGENT 8 LUNDY

$8W STONE 4 WEBSTER SAB SITING ANALYSIS BRANCH G1H GIBBS 8 HILL SAR:

SAFETY ANALYSIS REPORT GHDR: GIBBS 1 HILL SDA:

STANDARD DESIGN APPROVAL GIL GILBERT COMMONWEALTH SEB STRUCTURAL ENGINEERING BRANCH GSB:

GEOSCIENCES BRANCH SER:

SAFETY EVALUATION REPORT SIB:

SYSTEMS INTERACTION BRANCH SP:

SPECIAL PROJECT-HGB:

HYDROLOGIC AND GEOTECHNICAL BRANCH SSC:

SOUTHERN SERVICES COMPANY HTGR HIGH TEMPERATURE GAS COOLED REACTOR SSER: SUPPLEMENT TO SAFETY EVALUATION TVA:

TENNESSEE VALLEY AUTHORITY ICB:

INSTRUMENTATION AHD GONTROL BRANCH UEC:

UNITED ENG. 8 CONSTRUCTORS UFB UTILITY FINANCE BRANCH WEST WESTINGHOUSE

7.

t

  • mia.

l 1

]

,i i

f I

I i

t I

N

>4 Z

O t

1' N

I s

U W

en

9 - )l v t,F T 11K pg (jry 6,

pljb, 4,i
  • k - P ;!r i I:' !

W

'3 C 1

'L

'q, W A t,6, [ N t. f t !".

l i

1

(

,_