4 New Hampshire Yh k(h Ted C. Feigenbaum President and Chief Laervtive Olhcer NYN 91140 September 4,199i United States Nuclear Regulatory Commission Washington, D.C.
20555 Attention:
Document Control Desk Refereneen:
(a)
Facility Operating 1.icense No. NPP 86, Docket No. 50 443 (b)
NRC llulletin 88 08, dated June 22,1988,
- Thermal Stresses in Piping Connected to Reactor Coolant Systems" (c)
PSNil Letter NYN 88130 dated September 30,1988, ' Response to NRC flulletin 88 08,' O. S. Thomas to USNRC (d)
I'SNil Letter NYN 88162 dated December 27, 1988, *lt t q u e st far Additional information Concerning NRC Ilulletin 88 08,* G. S. Thomas to USNRC (c)
PSNil Letter NYN 89008 dated January 13,1989, ' Additional Infor m ation Concerning NRC Ilulletin 88 08,* O. S. Thoman to USNRC (f)
NilY Letter NYN 90011 dated January 11,1990, 'Information Regarding NRC llulletin 88 08, Supplement 3,' T. C. Feigenbaum to USNRC
Subject:
Status of Actions Responsive to NRC !!ulletin 88 08 Gentlemen:
The letters referenced above provided the New llampshire Yankee (NIIY) response to NRC llulletin 88 08 and its Supplements. in response to un NRC Staff request of August 26, 1991, NilY has reviewed actions taken it: response to NRC Ilulletin h8 08 and its Supplements and confirmed that all one time actions described in the referenced letters have been completed. An ongoing temperature monitoring program applicable to four high head Safety injection System lines and three Charging Systein lines connecting to the Reactor Coolant System as described in References (c), (d) and (c) has been implemented.
I l
9109100365 910904 PDR ADOCK 05000443 P
PDR l
N
- H mPshire Yankee Division of Public Service Comyny of New Hampshire 7g l
j 000056i en a 300. seas,oot, ns 0387a. iciephone (603) 47d.932i Y0 I
- United States Nuelcar Regulatory Commission September 4,1991 Attention:
Document Control Desk Page two
)
j.
11ased on the above, New llampshire Yankee considers that its commitments associated with NRC llulletin 88 08 and its Supplements have been fulfilled.
if you have any questions regarding this matter, please contact hir. James M. Peschel, Regulatory Cor*2pliance hianaget, at (603) 474 9521, Extension 3772.
Very truly yours, hi Ted C. Felgenbau TCF:GK/ss cc:
hir. Thomas T. Martin Regional Administrator United States Nuclear Regulatory Commission Region 1 475 Allendale Road King of Prussia, PA 19406 Mr. Gordon E. Edison, Sr. Project Manager Projeet Directorate I 3 Division of Reactor Projects U.S. Nuclear Regulatory Commission Washington, DC 20555 Mr. Noel Dudley NRC Senior Resident inspector P.O. Box 1149 Scabrook, nil 03874
~