ML20082P431
| ML20082P431 | |
| Person / Time | |
|---|---|
| Site: | Cooper |
| Issue date: | 08/31/1991 |
| From: | Kernes E, Meacham J NEBRASKA PUBLIC POWER DISTRICT |
| To: | NRC OFFICE OF INFORMATION RESOURCES MANAGEMENT (IRM) |
| References | |
| CNSS918802, NUDOCS 9109100326 | |
| Download: ML20082P431 (5) | |
Text
,-
F'M
'f.)yf u,oi r n mia t <oi si nt ios
% Nebraska Public Power District
" " ""
- 1"i M""TE'. t" ^Y^ ""'
k'h nersamasumtmmensarammeewamameraaurweerwassewstvnuea 'c+2enm====am CNS$918802 September 5, 1991 Document Control Desk U. S. Nucient Regulatory Comrnission Washington, D.C.
20555 Sub.j ec t:
Honthly Operating St.atus Report for August 1991 Docket No, 50 298.
Centlemen:
Enclosed for your information and use is the Cooper Nuclear Station Monthly Operating Status Report for August 1991. The report includes Operating Status, Average Daily Unit Power Level, Unit Shutdown Data and a Narrative summary of Operating Experience.
Should you have any comments, or require additional information regarding this report, please contact me.
Sincerely, Ne
6 MONTH Auaust 1991 DAY AVERAGE DAILY POWER LEVEL DAY AVERAGE DAILY POWER LEVEL (XNo-Net) (HWe-Net) 1 675 17 646 _. 3 ,, - 6 9 8 18 643 3 682 19 642 4 682 20 641 5 680 21 636 6 678 22 604 7 672 23 5,p_2 B' 6 71_,,,,,,, 21 632 i, 9 670 25 .,___,,,,,,,,_,,__,,,,,ft24 10 667 26 620 11 645 27 620 la 662 28 615 13 658 29 610,,, 14 652 30 6Q3 l. 15 650 31 607 '16 649 i. INSTRUCTIONS t On this format, list the average daily unit power level in MWe-Net for each day in the rc orting month. Compute to the nearest whole megawatt. l l UNITSHUTDOWNS AND POWF.R REDUCTIONS DOCKET NO. 050-0299 UNITNAME Cooper P7pelear Station DATE Scotember4.1991_ COMPL.ETED BY E. A. Kemes TELEPHONE (4021825-5766 REPORT MONTH Auaust 1991 Method Of Ucertsae Cause & Cormtve Duni: tion SF.Jttng Event. System
- Cw se-f Ac$ ento 2
3 l No. Date Type' (Hours) Reason Down Pesctor Report Code Code Prevent Fecurrence 914)4 7 M 91 .F 0 D 5 LER 914)07 VJ AHU Diese Generator Fan CoE Units not sesmcaty qat5ed Sesrrwe restnnnts were insta8ed to cor ectthe orgna! desagn de5cierwy. l l l i I l i i I M 1 F: Forced 2 Reasort 3 Methoi 4 Exhtt G - 6 4, h itor S: Scheduled A-EW Failure (Emlan) 1 - Manual F.w.6, ot Data Erey B-MaintenanceorTest 2-MarualSaam Sheets for Licer:see Event C-Re'uehng 3 - tutorurbcSaam Report (LER) Fue (N'JREG0161) D - Regulatory Restrictm 4 - Continued E - Operator Tranng & Ucense Ewnrumon 5 - Redr ced Lead 5 EstubitI-Same Source F - AdmrustratNe 6 - Other G-OperationalEnor(Emiain) H - Other (Eglain) P*' W g y w-- 'w w$ <*e--+ y w.wg+wm. p .p-p ww,
- '.o OPERATIONS NARRATIVE COOPER NUCLEAR STATION AUGUST 1991 4
MAXIMUM AVAILABLE POWER OPERATION WAS EXPERIENCED FOR THE MONTH OF At! GUST AS THE END-OF-CYCLE 14 COASTDOWN CONTINUED. A CAPACITY FACTOR OF-84.6% WAS ACHIEVED FOR THE MONTH OF AUGUST. i L