Responds to NRC Re an Open Item in Insp Rept 50-483/91-15.Corrective Actions:Currently Identifying & cross-referencing Plant Specific Values Used in Emergency Operating Procedures to Basis Documents
ML20082P158
Person / Time
Site: Callaway Ameren icon.png
Issue date: 09/03/1991
From: Schnell D
UNION ELECTRIC CO.
To: Miller H
NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION III)
References
ULNRC-2473, NUDOCS 9109100210
Download: ML20082P158 (1)


Text

F t

f 1%1l'n &an Mme.

L Vmi Di!w [c 'lS

} lot y M':

"LllfC f

]ll UJ VI!

September 3, 1991 1

Mr. H. J. Miller, Director muld r. schad UNION TLIECTRIC United States Nuclear Regulatory Commission u%N w Region III 33 7 9 ') Roosevelt Rd.

Glen Ellyn, IL 60137 ULNRC-2473 I

Dear Sir:

DOCKET NUMBER 50-433 CALLAWAY PLANT UNIT 1 FACILITY OPERATING LICENSE NPF-30 BESPONSE TO INSPECTION REPORT 50-483/91015 This responds to Mr.

G.

C.

Wright's letter dated August 8, 1991 which requested a response to open item 50-483/91015-01 regarding completion of the EOP setpoint document.

Our respon=e to the open item is presented below.

i The Operations Department is currently identifying and cross-referencing plant specific values used in the Emer-gency Operating Procedures to the basis documents.

This effort will be completed for our current EOPs by June 30, 1992.

If you have any questions regarding the response, or if additional information is required, please let me know.

t Very truly yours,

. /

  1. D

/(;-

n1d i

Donald F.

Schnell CSP /tuw Attachment cc:

A.

B.

Davis - Regional Administrator, USNRC Region III R.

L. Hague - Chief, Reactor Projects Section 3C, USNRC Region III M.

D. Lynch - USNRC Licensing Project Manager (2 copies) l USNRC Document Control Desk (original)

Manager - Electric Department, Missouri Public Service Commission B.

L.

Bartlett - USNRC Senior Resident Inspector Shaw, Pittman, Potts, & Trowbridge

(

s' 0

9109100210 910903 PDP ADOCK 05000483 O

PDR i 0 L