ML20082M711
| ML20082M711 | |
| Person / Time | |
|---|---|
| Site: | Beaver Valley |
| Issue date: | 04/12/1995 |
| From: | DUQUESNE LIGHT CO. |
| To: | |
| Shared Package | |
| ML20082M708 | List: |
| References | |
| NUDOCS 9504240349 | |
| Download: ML20082M711 (1) | |
Text
,...-
CONTAINMENT SYSTEMS SURVEILLANCE REQUIREMENTS (continued) d.
?.t 100 t Once per 13 m: nth, duri.; thutde"9, by /crifying, that en recirculatier fice, ::25 :::ircul: tion : pray pump de'/elcpe e di"#--^-*i-'
preccure Of 2 112 p id :t : f1:e of
?. MCC Qem.~
At least once per 18 months during shutdown, by:
e.
1.
Cycling each power operated (excluding automatic) valve in the flow path not testable during plant operation, through at least one complete cycle of full travel.
2.
Verifying that each automatic valve in the flow path i
actuates to its correct position on a test signal.
3.
Initiating flow through each Service Water subsystem and its two associated recirculation spray heat exchangers, and verifying a flow rate of at least 11,000 gpm.
f.
At least once per 5 years by performing an air or smoke flow.
test through each spray header and verifying each spray nozzle is unobstructed.
f\\)erj, aN N knym1 Spm th 5 h humR g
fr. p % ) 4he.h enM recif tu\\c.how S pr.
p% p 'I deus.\\9e.d cod nh b 'hloW 4td on d IS f
o c e p \\ h h n p c. S A u s\\ y. J gee.4te Ah.n h e e.cb.
ONE (1)
"ntil the h ginning of the fifth r: fueling cut:g: '" Ode 5) er until an cut;;; cf an expected durati:n of 20 d:y: er grect r, whichever cccur; fir:t, 2R00 P21A r; circulation pre,y pump i:
Only required te de / ele; : dif ferenti:1 pr:::ur; cf i 110 p:id :t a flou Of 1 0275 gp.
J BEAVER VALLEY - UNIT 2 3/4 6-13 Amendment No.6f-9h g
2 "I*
N 42 P