Text
m VIRGINIA ELECTHIC AND Powna COMPANY RzenxoNn,VIBOINIA 23261 W.L.Stawaar November 30, 1983 vic p.
NucLeam OPERATIONS Mr. Harold R. Denton, Director Serial No. 044B Office of Nuclear Reactor Regulation N0/JHL:acm Attn:
Mr. Darrell G. Eisenhart, Director Docket Nos. 50-338 Division of Licensing 50-339 U. S. Nuclear Regulatory Commission License Nos. NPF-4 Washington, D. C. 20555 NPF-7 Gentlemen:
VIRGINIA ELECTRIC AND POWER COMPANY NORTH ANNA POWER STATION UNIT NOS. 1 AND 2 NUREG-0737 ITEM II.D.3 In our letter dated July 29, 1983 (Serial No. 044A), Vepco informed you that the acoustical monitoring system for direct indication of relief and safety valve position, (NUREG-0737, Item II.D.3) would be undergoing a retest program. This was due to the failure of certain components during seismic and environmental testing. The completion of the retest program was scheduled for November, 1983 with issuance of the final report in January, 1984.
Vepco has been informed by Babcock
- Wilcox that the retesting program will be delayed.
The delay is in the L esting portion of the program.
Vepco will have the acoustical monitoring a
<a fcr direct indication of relief and safety valve position seismically ar.~
vi?;onmentally qualified and installed in accordance with the final Environean,:'.1 Ous11fication Rule.
Very truly yours, W.
. Stewart cc:
Mr. James P. O'Reilly Regional Administrator l
Region II I
Mr. M. B. Shymlock NRC Resident Inspector North Anna Power Station 8312060191 831130 Q
f DR ADOCK 05000338 j
p PDR y 6