Forwards TMI-1 Effluent & Offsite Dose Rept for Jan-June 1991, Rev 14 to Operating Procedure 1104-28I, Waste Solidification Process Control Program & Rev 8 to Operating Procedure 1104-28I, Waste Solidification Process..
ML20082M287
Person / Time
Site: Three Mile Island Constellation icon.png
Issue date: 08/29/1991
From: Broughton T
GENERAL PUBLIC UTILITIES CORP.
To:
NRC OFFICE OF INFORMATION RESOURCES MANAGEMENT (IRM)
Shared Package
ML20082M290 List:
References
C311-91-2091, NUDOCS 9109050119
Download: ML20082M287 (2)


Text

GPU Nuclear Corporation a Nuclear

= emes:reo Middletown, Pennsylvania 17057 0191 717 94;.7621 TELEX 84 2386 Writer's Direct Dial Number:

(717) 948-8005 August 29, 1991 C311-91-2091 U.S. Nuclear Regulatory Commission Attn: Document Control Desk Washington, DC 20555

Dear Sir:

Subject:

Three Mile Island Nuclear Station, Unit 1 (TM1-1) ,

Operating License No. DPR-50 $

Docket No. 50-289 '

First Half - 1991 Semiannual Effluent and Release Report Enclosed is the TMI-l Semiannual Effluent and Release Report for the period January 1, 1991 through June 30, 1991. This report includes an Executive Summary of the Effluent Release Report, the Disposal and Effluent Release Data, and an assessment of the radiation doses due to liquid and gaseous effluents released from the unit during the reporting period.

TMI-l Technical Specification Sections 6.9.4.2.1 and 6.9.4.2.2 require reporting of effluent and solid waste shipment data 11. accordance with Reg.

Guide 1.21 for the semi-annual report period. These tables are attached and include summaries of solid waste shipments and liquid and gaseous effluents for the reporting period.

TMI-l Technical Specification Section 6.9.4.2.3 requires a summary of unplanned releases from the site to unrestricted areas. During this report period there were no unplanned releases.

TMI-l Technical Specification Section 6.9.4.2.4 requires that changes to the Process Control Program (PCP) and Offsite Dose Calculation Manual (00CM) be reported. The ODCM was revised during this report period and submitted to the NRC via GPU Nuclear letter C311-91-2035 dated April 4, 1991. The PCP was revised and is included as Attachment 1 to this report. This Section 6.9.4.2.4 also requires "a listing of new locations for dose calculations and/or monitoring identified by the land use census pursuant to Specification 3.23.2."

There were no new locations identified during this semiannual period.

9109050119 910829 PDR ADOCK 05000289 R PDR o

[* 4* f/ L4 "I Vn GPU Nuclear Corporation is a subsid aN of Genera! Pubhc U'iht4es Corporation ('

L---- -- _ - - - - - 'I/ A

Document Control Desk C311-91-2091 Page Two THI-l Technical Specification Section 6.9.4.2.5 requires reporting of instrumentation not returned to OPERABLE status within 30 days per Section 3.21.1.b and 3.21.2.b. All such instrumentation was returned to OPERABLE service within 30 days.

Sincerely, T.G.Brougf, ton Vice Presi @ nt and Director, TMI-l DVH/mkk Enclosures cc: Administrator Region I TMl-1 Senior Project Manager TMI Senior Resident Inspector 4