ML20082L803
| ML20082L803 | |
| Person / Time | |
|---|---|
| Site: | McGuire, Mcguire |
| Issue date: | 04/14/1995 |
| From: | Berkow H NRC (Affiliation Not Assigned) |
| To: | |
| Shared Package | |
| ML20082L806 | List: |
| References | |
| NUDOCS 9504210306 | |
| Download: ML20082L803 (8) | |
Text
(*
- tra
[.
4 UNITED STATES j,
j NUCLEAR REGULATORY COMMISSION c
WASHINGTON. D.C. 20555-(201 49.....,o DUKE POWER COMPANY DOCKET NO. 50-369 i
McGUIRE NUCLEAR STATION. UNIT 1
~
AMENDMENT TO FACILITY OPERATING LICENSE Amendment No. 155 License No. NPF-9 1.
The Nuclear Regulatory Commission (the Commission) has found that:
A.
The application for amendment to the McGuire Nuclear Station, Unit 1 (the facility), Facility Operating License No. NPF-9 filed by the Duke Power Company (licensee) dated February 23,'1995, as supplemented by letter dated March 21, 1995, complies nith the standards and requirements of the Atomic Energy Act of 1954, as amended (the Act), and the Commission's rules and regulations as set forth in 10 CFR Chapter I; 8.
The facility will operate in conformity with the application, the provisions of the Act, and the rules and regulations of the Commission; C.
There is reasonable assurance (i) that the activities authorized by this amendment can be conducted without endangering the health and safety of the public, and (ii) that such activities will be conducted in compliance with the Commission's regulations set forth in 10 CFR Chapter I; D.
The issuance of this amendment will not be inir.ical to the common defense and security or to the health and safety of the public; and E.
The issuance of this amendment is in accordance with 10 CFR Part 51 of the Commission's regulations and all applicable requirements have been satisfied.
l 9504210306 950414 ADOCK0500g9 DR
, 2.
Accordingly, the license is hereby amended by page changes to the Technical Specifications as indicated in the attachment to this license amendment, and Paragraph 2.C.(2) of Facility Operating License No. NPF-9 is hereby amended to read as follows:
Technical Specifications The Technical Specifications contained in Appendix A, as revised through Amendment No. 155, are hereby incorporated into this license. The licensee shall operate the facility in accordance with the Technical Specifications and the Environmental Protection P1an.
3.
This license amendment is effective as of its date of issuance and shall
~
be implemented within 30 days from the date of issuance.
FOR THE NUCLEAR REGULATORY COMMISSION cm
/)f, erbert N. Berkow, Director Project Directorate II-2 Division of Reactor Projects - I/II Office of Nuclear Reactor Regulation
Attachment:
Technical Specification Changes Date of Issuance:
April 14, 1995 k
168 "'%
8 f
p
?+.
UNITED STATES j
j NUCLEAR REGULATORY COMMISSION
't WASHINGTON, D.C. 20!iS5 0001 9.....,d 4
DUKE POWER COMPANY DOCKET NO. 50-370 McGUIRE NUCLEAR STATION. UNIT 2
, AMENDMENT TO FACILITY OPERATING LICENSE Amendment No.137 License No. NPF-17 1.
The Nuclear Regulatory Commission (the Commission) has found that:
A.
The application for amendment to the McGuire Nuclear Station, Unit 2 (the facility), Facility Operating License No. NPF-17 filed by the Duke Power Company (licensee) dated February 23, 1995, as supplemented by letter dated March 21, 1995, complies with the standards and requirements of the Atomic Energy Act of 1954, as amended (the Act), and the Commission's rules and regulations as set forth in 10 CFR Chapter I; 8.
The facility will operata in conformity with the application, the provisions of the Act, and the rules and regulations of the Commission; C.
There is reasonable assurance (i) that the activities authorized by this amendment can be conducted without endangering the health and safety of the public, and (ii) that such activities will be conducted in compliance with the Commission's regulations set forth in 10 CFR Chapter I; D.
The issuance of this amendment will not be inimical to the common defense and security or to the health and safety of the public; and E.
The issuance of this amendment is in accordance with 10 CFR Part 51 of the Commission's regulations and all applicable requirements have been satisfied.
l i
, 2.
Accordingly, the license is hereby amended by page changes to the Technical Specifications as indicated in the attachment to this license
-amendment, and Paragraph 2.C.(2) of Facility Operating License No.
NPF-17 is hereby amended to read as follows:
Technical Soecifications The Technical Specifications contained in Appendix A, as revised through Amendment No. 137, are hereby incorporated into this license. The licensee shall operate the facility in accordance with the Technical Specifications and the Environmental Protection Plan.
3.
This license amendment is effective as of its date of issuance and shall be implemented within 30 days from the date of issuance.
FOR THE NUCLEAR REGULATORY COMMISSION
\\
,am
/
/cy Herbert N. Berkow, Director F
Project Directorate 11-2 Division of Reactor Projects - I/II Office of Nuclear Reactor Regulation
Attachment:
Technical Specification Changes Date of Issuance:
April 14, 1995
i ATTACHMENT TO LICENSE AMENDMENT NO. 155 FACILITY OPERATING LICENSE NO. NPF-9 DOCKET NO. 50-369 8!iQ T0 LICENSE AMENDMENT NO.
137 FACILITY OPERATING LICENSE NO. NPF-17 DOCKET N0. 50-370 Replace the following pages of the Appendix "A" Technical Specifications with the enclosed pages. The revised pages are identified by Amendment number and contain vertical lines indicating the areas of change.
Remove Paaet Insert Paaes 3/4 8-11 3/4 8-11 3/4 8-16 3/4 8/16 3/4 8-16a*
- over flow page-no change i
1 I
i i
1
i ELECTRICAL POWER SYSTEMS 3/4.8.2 D.C. SOURCES OPERATING LIMITING CONDITION FOR OPERATION 3.8.2.1 The following D.C. channels shall be OPERABLE and energized:
a.
Channel I consisting of 125-Volt D.C. Bus No. EVDA,125-Volt D.C.
Battery Bank No. EVCA and a full-capacity charger,*#
b.
Channel 2 consisting of 125-Volt D.C. Bus No. EVDB, 125-Volt D.C.
Battery' Bank No. EVCB and a full-capacity charger,*#
c.
Channel 3 consisting of 125-Volt D.C. Bus No. EVDC,125-Volt D.C.
Battery Bank No. EVCC and a full-capacity charger,*# and d.
Channel 4 consisting of 125-Volt D.C. Bus No. EVDD,125-Volt D.C.
Battery Bank No. EVCD and a full-capacity charger,*#
APPLICABILITY: MODES 1, 2, 3, and 4.
ACTION:
(Units 1 and 2) a.
With one 125-volt D.C. bus inoperable or not energized, restore the inoperable bus to OPERABLE and energized status within 2 hours2.314815e-5 days <br />5.555556e-4 hours <br />3.306878e-6 weeks <br />7.61e-7 months <br /> or be in at least HOT STANDBY within the next 6 hours6.944444e-5 days <br />0.00167 hours <br />9.920635e-6 weeks <br />2.283e-6 months <br /> and in COLD SHUTDOWN within the following 30 hours3.472222e-4 days <br />0.00833 hours <br />4.960317e-5 weeks <br />1.1415e-5 months <br />.
b.
With one 125-volt D.C. battery and/or its normal and standby chargers inoperable or not energized, either:
1.
Restore the inoperable battery and/or charger to OPERABLE and energized status within 2 hours2.314815e-5 days <br />5.555556e-4 hours <br />3.306878e-6 weeks <br />7.61e-7 months <br /> or be in at least HOT STANDBY within the next 6 hours6.944444e-5 days <br />0.00167 hours <br />9.920635e-6 weeks <br />2.283e-6 months <br /> and in COLD SHUTDOWN within the follow-ing 30 hours3.472222e-4 days <br />0.00833 hours <br />4.960317e-5 weeks <br />1.1415e-5 months <br />, or 2.
Energize the associated bus with an OPERABLE battery bank via OPERABLE tie breakers within 2 hours2.314815e-5 days <br />5.555556e-4 hours <br />3.306878e-6 weeks <br />7.61e-7 months <br />; operation may than continue for up to 72 hours8.333333e-4 days <br />0.02 hours <br />1.190476e-4 weeks <br />2.7396e-5 months <br /> from time of initial loss of OPERABILITY, otherwise, be in at least HOT STANDBY within the next 6 hours6.944444e-5 days <br />0.00167 hours <br />9.920635e-6 weeks <br />2.283e-6 months <br /> and in COLD SHUTDOWN within the following 30 hours3.472222e-4 days <br />0.00833 hours <br />4.960317e-5 weeks <br />1.1415e-5 months <br />.
- A vital bus may be disconnected from its D.C. source for up to 24 hours2.777778e-4 days <br />0.00667 hours <br />3.968254e-5 weeks <br />9.132e-6 months <br /> for the purpose of performing an equalizing charge on its associated battery bank provided the vital busses associated with the other battery banks are OPERABLE and energized.
- During periods of station modification associated with battery, main and tie breaker replacement only, the loads of a DC bus may be energized from a same train DC bus via temporary cables and breakers connecting to the same train DC bus directly and bypassing the de-energized DC bus. A one time allowable outage time up to 112 hours0.0013 days <br />0.0311 hours <br />1.851852e-4 weeks <br />4.2616e-5 months <br /> is granted for each DC bus, one at a time, to allow for replacement of these breakers.
Footnote
- shall not be applied to any of the busses during the 112 hour0.0013 days <br />0.0311 hours <br />1.851852e-4 weeks <br />4.2616e-5 months <br /> period.
McGUIRE - UNITS I and 2 3/4 8-11 Amendment No. 155 (Unit 1)
Amendment No. 137 (Unit 2)
ELECTRICAL POWER SYSTEMS 3/4.8.3 ONSITE POWER DISTRIBUTION OPERATING C ITING CONDITION FOR OPERATION J.8.3.1 The following A.C. electrical busses and inverters shall be OPERABLE and energized with tie breakers open both between redundant busses within the unit and between the two units:
a.
4160-Volt Emergency Bus ETA, b.
4160-Volt Emergency Bus ETB, c.
600 Volt Emergency Bus ELXA, d.
600-Volt Emergency Bus ELXB, e.
600-Volt Emergency Bus ELXC, f.
600-Volt Emergency Bus ELXD, g.
120-Volt A.C. Vital Bus EKVA energized from Inverter EVIA connected to D.C. Channel 1,*#
h.
120-Volt A.C. Vital Bus EKVB energized from Inverter EVIB connected to D.C Channel 2,*#
i.
120-Volt A.C. Vital Bus EKVC energized from Inverter EVIC connected to D.C. Channel 3,*# and J.
120-Volt A.C. Vital Bus EKVD energized ? rom Inverter EVID connected to D.C. Channel 4.*#
APPLICABILITY: MODES 1, 2, 3, and 4.
ACTION:
a.
With less than the above complement of A.C. busses OPERABLE and energized, restore the inoperable busses to OPERABLE and energized status within 8 hours9.259259e-5 days <br />0.00222 hours <br />1.322751e-5 weeks <br />3.044e-6 months <br /> or be in at least HOT STANDBY within the next 6 hours6.944444e-5 days <br />0.00167 hours <br />9.920635e-6 weeks <br />2.283e-6 months <br /> and in COLD SHUTDOWN within the following 30 hours3.472222e-4 days <br />0.00833 hours <br />4.960317e-5 weeks <br />1.1415e-5 months <br />.
b.
With one inverter inoperable, energize the associated A.C. Vital Bus within 8 hours9.259259e-5 days <br />0.00222 hours <br />1.322751e-5 weeks <br />3.044e-6 months <br />; restore the inoperable inverter to OPERABLE and ener-gized status within 24 hours2.777778e-4 days <br />0.00667 hours <br />3.968254e-5 weeks <br />9.132e-6 months <br /> or be in at least HOT STANDBY within the next 6 hours6.944444e-5 days <br />0.00167 hours <br />9.920635e-6 weeks <br />2.283e-6 months <br /> and in COLD SHUTDOWN within the following 30 hours3.472222e-4 days <br />0.00833 hours <br />4.960317e-5 weeks <br />1.1415e-5 months <br />.
- An inverter may be disconnected from its D.C. source for up to 24 hours2.777778e-4 days <br />0.00667 hours <br />3.968254e-5 weeks <br />9.132e-6 months <br /> for the purpose of performing an equalizing charge on its associated battery bank provided:
(1) its vital bus is OPERABLE and energized, and (2) the vital busses associated with the other battery banks are OPERABLE and energized.
An inverter may be disconnected from its D.C. source for up to 72 hours8.333333e-4 days <br />0.02 hours <br />1.190476e-4 weeks <br />2.7396e-5 months <br /> provided the conditions of ACTION b. of Specification 3.8.2.1 are satisfied.
MDuring periods of station modification associated with battery, main and tie breaker replacement only, two channel related inverters maybe eneregized from a same train DC bus via te morary cables and breakers connecting to the same train DC bus directly and bypassing the associated de-energized DC bus. A one time allowable outage time up to 112 hours0.0013 days <br />0.0311 hours <br />1.851852e-4 weeks <br />4.2616e-5 months <br /> is granted for each DC bus, one at a time, to allow for rcplacement of these breakers.
Footnote
- shall not be applied to any of the busses during the 112 hour0.0013 days <br />0.0311 hours <br />1.851852e-4 weeks <br />4.2616e-5 months <br /> period.
McGUIRE - UNITS I and 2 3/4 8-16 Amendm2nt No.155 (Unit 1)
Amendment No.137 (Unit 2)
e ELECTRICAL POWER SYSTEMS 3/4.8.3 ONSITE POWER DISTRIBUTION (CONTINUED)
OPERATING SURVEILLANCE REQUIREMENTS 4.8.3.1 The specified A.C. busses and inverters shall be determined energized i
in the required manner at least once per 7 days by verifying correct breaker i
alignment and indicated voltage on the busses.
l t
i l
f l
l i
l i
McGUIRE - UNITS 1 and 2 3/4 8-16 a Amendment No. 155 (Unit 1)
Amendment No. 137 (Unit 2)
)