ML20082L713
| ML20082L713 | |
| Person / Time | |
|---|---|
| Site: | Palo Verde |
| Issue date: | 04/07/1995 |
| From: | Krainik A ARIZONA PUBLIC SERVICE CO. (FORMERLY ARIZONA NUCLEAR |
| To: | NRC OFFICE OF INFORMATION RESOURCES MANAGEMENT (IRM) |
| Shared Package | |
| ML20082L716 | List: |
| References | |
| NUDOCS 9504210266 | |
| Download: ML20082L713 (3) | |
Text
,
Arizona Public Service Company PALO VERDE NUCLEAR GENEA ATING STATION P O BOX 5?J34
- PHOENW AR:20NA P50'2-2034 102-03314-AKK/PMM U. S. Nuclear Regulatory Commission April 7,1995 ATTN: Document Control Desk Mail Station P1-37 Washington, DC 20555
Dear Sirs:
Subject:
Palo Verde Nuclear Generating Station (PVNGS)
Units 1,2, and 3 Docket Nos. STN 50-528/529/530 Emergency Plan Implementing Procedures Update in accordance with 10 CFR 50, Appendix E.V enclosed please find copies of revised PVNGS Emergency Plan Implementing Procedures (EPIPs). The procedures included with this transmittal are indicated on the enclosed list. Also included for your information is a complete listing of the PVNGS EPIPs (Procedures Index).
The enclosed EPIPs contain information considered private or proprietary (including names and internal telephone numbers). In accordance with Generic Letter No. 81-27, the specific information has been bracketed on the EPIPs. Arizona Public Service Company (APS) requests that this information be considered confidential and withheld from public disclosure pursuant to 10 CFR 2.790(a) and 10 CFR 9.17(a).
By copy of this letter, APS is forwarding two copies of the enclosure to the NRC Region IV Office.
Copies of the revised EPIPs are provided to the NRC Resident Inspector's Office as an update to the assigned controlled procedures.
If you have any questions, please contact Robert K. Roehler at (602) 393-5241.
Sincerely, N. IhN Angela K. Krainik, D partment Leader Nuclear Regulatory Affairs AKK/PMM/pm Enclosure cc:
E. F. Bates (w/ Enclosure - 2 copies)
L. J. Callan (w/o Enclosure) p K. E. Johnston (w/o Enclosure)
K. E. Perkins (w/o Enclosure) 95042io266 950407 PDR ADOCK 05000528 CCC0ev ppg l l F
I ENCLOSURE i
REVISED EMERGENCY PLAN IMPLEMENTING PROCEDURES LISTING EMERGENCY PLAN IMPLEMENTING PROCEDURES INDEX REVISED PVNGS EMERGENCY PLAN IMPLEMENTING PROCEDURES (EPIP-11, EPIP-13, & EPIP-19) l
p 5:Eg gf
- 1 UNITED STATES j
j NUCLEAR REGULATORY COMMISSION vtA SHINGTON, D.C. 2066& 4001
'g..... p April 18,1995 50-528/529/530 Palo Verde MEMORANDUM TO:
Chief Information d Re rds Management Br 6E,~
s FROM:
C rito
- ammerer, irector Div slon of Freedom of Information and Publications Services, ADM
SUBJECT:
REVIEW OF UTILITY EMERGENCY PLAN DOCUMENTATION The Division of Freedom of Information and Publications Services has reviewed the attached document and has deter.uined that it may now be made publicly available.
Attachment:
-4 I
l l
.