RIA Tennessee Valley Authority, Post Off+ce Box 2000, Decatur. Alabama 35609 April 14, 1995 U.S. Nuclear Regulatory Commission AT'IN :

Document Control Desk Washington, D.C.

20555 Gentlemen:

In the Matter of

)

Docket Nos. 50-259 Tennessee Valley Authority

)

50-260 50-296 BROWNS PERRY NUCLEAR PLANT (BFN) - MONTHLY OPERATING REPORT FOR THE MONTH OF MARCH 1995 In accordance with the requirements of BFN Units 1, 2,

and 3 l

Technical Specifications Section 6.9.1.3, TVA is submitting the Monthly Operating Report for the month of March 1995 in the enclosure.

If you have any questions, please call me at (205) 729-2636.

rpl,

f ro Salas Manager of Site Licensing Enclosure cc:

See page 2 f

21G003 l

9504210003 950331

/

l PDR ADDCK 05000259 v

R PDR

i e

i U.S. Nuclear Regulatory Commission j

Page 2 April 14, 1995 Enclosure cc (Enclosure):

Mr. Mark S.

Lesser, Acting Branch Chief U.S. Nuclear Regulatory Commission Region II 101 Marietta Street, NW, Suite 2900 l

Atlanta, Georgia 30323 Mr. Frederick J. Hebdon, Director Project Directorate II-4 Division of Reactor Projects I-II Office of Nuclear Reactor Regulation, Mail 13 H3 l

Washington, D.C.

20555 i

i INPO Records Center l

Institute of Nuclear Power Operations 700 Galleria Parkway Atlanta, Georgia 30339-5957 Mr. Jim Lang Director of Engineering and Operations Electric Power Research Institute P.

O.

Box 10412 j

Palo Alto, California 94304 NRC Resident Inspector j

Browns Ferry Nuclear Plant Route 12, Box 637 Athens, Alabama 35611 Regional Administrator U.S. Nuclear Regulatory Commission Region II 101 Marietta Street, NW, Suite 2900 Atlanta, Georgia 30323 Mr. Fred Yost, Director of Research Utility Data Institute 1200 G Street, NW Washington, D.C.

20005-3802 i

i ENCLOSURE TENNESSEE VALLEY AUTHORITY BROWN 8 FERRY NUCLEAR PLANT (BFN)

UNITS 1, 2, AND 3 NONTELY OPERATING REPORT NARCH 1995 SEE ATTACHED l

l

)m I

\\

l i

l l

OPERATIONAL

SUMMARY

MARCH 1995 BROWNS FERRY 1 Unit i remains shutdown on administrative hold to resolve various TVA and NRC concerns.

Unit 1 has been on administrative hold I

since June 1, 1985.

As a result, TVA considers that accrual of 1

reporting hours is suspended since the unit has a maximum dependable capacity of 0 MWe.

Accordingly, TVA does not consider cumulative reporting period hours for the period beginning June 1, 1985, when calculating the operating status variables.

l BROWNS FERRY 2 i

During the month Unit 2 operated at a capacity factor of 98.1 percent and generated 796,680 megawatt hours gross electrical power.

Unit 2 automatically scrammed at 1800 hours0.0208 days <br />0.5 hours <br />0.00298 weeks <br />6.849e-4 months <br /> on March 30, 1995, as a result of personnel error during surveillance testing, l

causing the actuation of the ESF system.

Unit 2 did not achieve criticality the remainder of the month; however, Unit 2 did achieve criticality at 0139 hours0.00161 days <br />0.0386 hours <br />2.29828e-4 weeks <br />5.28895e-5 months <br /> on April 2, 1995.

j BROWNS PERRY 3 Unit 3 remains shutdown on administrative hold to resolve various TVA and NRC concerns.

Unit 3 has been on administrative hold since June 1, 1985.

As a result, TVA considers that accrual of l

reporting hours is suspended since the unit has a maximum dependable capacity of 0 MWe.

Accordingly, TVA does not consider cumulative reporting period hours for the period beginning June 1, 1985, when calculating the operating status variables.

\\

l l

AVERAGE DAILY UNIT POWER LEVEL DOCKET NO:

50-259 UNIT: EROWNS FERRY 1 PREPARED BY T.

R.

Smith TELEPHONE:

(205) 729-2955 MONTH March 1995 DAY AVERAGE DAILY POWER LEVEL DAY AVERAGE DAILY POWER LEVEL (MWe-Net)

(MWe-Net) 1 0

16 0

2 0

17 0

3 0

18 0

4 0

19 0

5 0

20 0

6 0

21 0

7 0

22 0

8 0

23 0

9 0

24 0

10 0

25 0

11 0

26 0

12 0

27 0

13 0

28 0

14 0

29 0

15 0

30 0

31 0

l i

j AVERAGE DAILY UNIT POWER LEVEL DOCKET NO:

50-260 UNIT BROWNS FERRY 2 PREPARED BY T.

R.

Smith TELEPHONE:

(205) 729-2955 MONTH March 1995 DAY AVERAGE DAILY POWER LEVEL DAY AVERAGE DAILY POWER LEVEL (MWe-Net)

(MWe-Net) l l

1 1095 16 1092 2

1095 17 1089 3

1084 18 1077 4

1094 19 1095 l

5 1076 20 1091 6

1096 21 1089 I

7 1092 22 1089 8

1092 23 1088 9

1092 24 1095 i

10 1095 25 1075 l

11 1087 26 1090 12 1092 27 1088 13 1091 28

'1089 1

i 14 1092 29 1089 l

15 1086 30 813 31 0

i I

1 4

l AVERAGE DAILY UNIT POWER LEVEL i

l DOCKET NO:

50-296 t

UNIT: BROWNS FERRY 3 PREPARED BY:

T.

R.

Smith

. TELEPHONE:

i2051 729-2955

]

)

MONTH March 1995 l

DAY AVERAGE DAILY POWER LEVEL DAY AVERAGE DAILY POWER LEVEL (MWe-Net).

(MWe-Net) 1 0

16 0

I 2

0 17 0

j 3

0 18 0

l 4

0 19 0

5 0

20 0

i 6

0 21 0

)

7 0

22 0

8 0

23 0

9 0

24 0

l 10 0

25 0

1 11 0

26 0'

12 0

27 0

l 13 0

28 0

14 0

29 0

15 0

30 0

31 0

i l

l i

I

\\

UNIT SHUTDOWNS AND POWER REDUCTIONS DOCKET NO:

50-259 REPORT MONTH:

March 1995 UNIT:

BROWNS FERRY l PREPARED BY:

T.

R.

Smith TELEPHONE:

(205) 729-2955 MethM of License Duration Shmting Event System Conponent Cause and Corrective Action to Prevent No.

Date Type' (Hours)

Reason' Down feactor' Report No.

Code' Code

  • Recurrence 1

06/01/85 S

744 F

4 Adninistrative hold to resolve various TVA and NRC concerns.

'F-Forced

'A-Equipnent Failure (Explain)

' Method:

"Instructiom for Preparation of Licensee S-Scheduled B-Maintenance or Test 1-Manual Event Reports (NUREG-1022)

C-Refueling 2-Manual Scram D-Regulatory Restriction 3-Automatic Scram E-Operator Training and License Examination 4-Continuation of Existing Outage F-Adeinistrative S-Reduction G-operational Error (Explain) 9-Other H-Other (Explain)

...m UNIT SHUTDOWNS AND POWER REDUCTIONS DOCKET NO:

50-260 REPORT MONTH:

March 1995 UNIT: BROWNS FERRY 2 PREPARED BY:

T.

R.

Smith TELEPHONE:

f205) 729-2955 Method of License Duration Shutting Event System Component Cause and Corrective Action to Prevent No.

Date Type' (Hours)

Reason' Down Reactor

  • Report No.

Code

  • Code
  • Recurrence 1

03/30/95 F

30 H

3 260/95004 N/A N/A Automatic scram caused by personnel error during surveillance testing.

r I

i

'F-Forced

'A-Equipment Failure (Explain)

' Method:

' Instructions for Preparation of Licensee S-Scheduled B-Maintenance or Test 1-Manual Event Reports (NUREG-1022)

C-Refueling 2-Manual Scram D-Regulatory Restriction 3-Automatic Scram E-Operator Training and License Examination 4-Continuation of Existing Outage F-Adninistrative 5-Reduction G-operational Error (Explain) 9-Other H-Other (Explain)

UNIT SHUTDOWNS AND POWER REDUCTIONS DOCKET NO:

50-296 REPORT MONTH:

March 1995 UNIT: BROWNS FERRY 3 PREPARED BY:

T.

R.

Smith TELEPHONE:

(205) 729-2953 Method of License Duration Shutting Event System Comcr.cett Cause and Corrective Action to Prevent No.

Date Type' (Hours)

Reason' Down Reactor' Report No.

Code' Ca_t*

Recurrence 1

06/01/85 s

744 F

4 Achtin'strative held to resolve various TVA and 'estC concerns.

'F-Forced

'A-Equipment Failure (Explain)

' Method:

" Instructions for Preparation of Licensee 5-Scheduled 8-Maintenance or Test 1-Manual Event Reports (NUREG-1022)

C-Refueling 2-Manual scram D-Regulatory Restriction 3-Automatic Scram E-Operator training and License Examination 4-Continuation of Existing Outage F-Achiinistrative 5-Reduction G-operational Error (Explain) 9-Other H-Other (Explain) e

d l

)

i OPERATING DATA REPORT DOCKET:

50-259 UNIT: BROWNS FERRY 1 PREPARED BY:

T.

R.

SMITH I

TELEPHONE:

(205) 729-2955 i

OPERATING STATUS

1. Unit Names BROWNS FERRY UNIT 1
2. Reporting Period: MARCH 1995
3. Licensed Thermal Power (MWt): 3293
4. Nameplate Rating (Gross MWe):

1152

5. Design Electrical Rating (Net MWe):

1065

6. Maximum Dependable Capacity (Gross MWe):

O.

7. Maximum Dependable Capacity (Not MWe):

0

8. If Changes occur in capacity Ratings (Items Number 3 Through 7) Since Last Report, Give Reason: N/A
9. Power Level To Which Restricted, If Any (Not MWe):

0

10. Reason For Restrictions, If Any: Administrative Hold THIS MONTE YEAR TO DATE CUMULATIVE *
11. Hours in Reporting Period 0

0 95743

12. Hours Reactor Was Critical 0

0 59521

13. Reactor Reserve Shutdown Hours 0

0 6997

14. Hours Generator On Line 0

0 58267

15. Unit Reserve Shutdown Hours 0

0 0

16. Gross Thermal Generation (MWh) 0 0

168066787

17. Gross Electrical Generation (MWh) 0 0

55398130

18. Het Electrical Generation (MWh) 0 0

53796427

19. Unit Service Factor 0

0 60.9

20. Unit Availability Factor 0

0 60.9

21. Unit Capacity Factor (MDC Net) 0 0

52.8

22. Unit Capacity Factor (DER net) 0 0

52.8

23. Unit Forced Outage Rate 0

0 25.6

24. Shutdowns Scheduled Over Next 6 Months (Type, Date, and Duration of Each): N/A
25. If Shut Down At End Of Reporting Period, Estimated Date of Startup: To be determined
  • Excludes hours under administrative hold (June 1, 1985 to present)

~.

\\

j OPERATING DATA REPORT 4

DOCKET:

50-260 UNIT:

BROWNS FERRY 2 PREPARED BY:

T.

R.

SMITH TELEPHONE:

(205) 729-2955 l

OPERATING STATUS

1. Unit Names BROWNS FERRY UNIT 2
2. Reporting Period: MARCH 1995
3. Licensed Thermal Power (MWt):

3293

4. Nameplate Rating (Gross MWe):

1152

5. Design Electrical Rating (Net MWe):

1065

6. Maximum Dependable Capacity (Gross MWe):

1098.4

7. Maximum Dependable Capacity (Net MWe):

1065

8. If Changes Occur in Capacity Ratings (Items Number 3 Through 7) Since Last Report, Give Reason: N/A
9. Power Level To Which Restricted, If Any (Net MWe): N/A
10. Reason For Restrictions, If Any: N/A THIS NONTH YEAR TO DATE CUNULATIVE*
11. Hours in Reporting Period 744 2160 124231
12. Hours Reactor Was Critical 714 2105 84232
13. Reactor Reserve Shutdown Hours 0

0 14200

14. Hours Generator On Line 714 2100 81959
15. Unit Reserve Shutdown Hours 0

0 0

16. Gross Thermal Generation (MWh) 2346533 6860443 238029357
17. Gross Electrical Generation (MWh) 796680 2330000 79073178 j
18. Net Electrical Generation (MWh) 777530 2275025 76864861
19. Unit Service Factor 96.0 97.2 66.0 l
20. Unit Availability Factor 96.0 97.2 66.0
21. Unit Capacity Factor (MDC Net) 98.1 98.9 58.1
22. Unit Capacity Factor (DER net) 98.1 98.9 58.1
23. Unit Forced Outage Rate 4.0 2.8 17.0
24. Shutdowns Scheduled Over Next 6 Months (Type, Date, and Duration of Each):

None

25. If Shut Down At End Of Reporting Period, Estimated Date of Startup: April 2, 1995
  • Excludes hours under administrative hold (June 1, 1985 to May 24, 1991)

~

~

OPERATING DATA REPORT DOCKET:

50-296 UNIT:

BROWNS FERRY 3 PREPARED BY:

T.

R.

SMITH TELEPHONE:

(205) 729-2955 OPERATING STATUS

1. Unit Names BROWNS FERRY UNIT 3
2. Reporting Period: MARCH 1995
3. Licensed Thermal Power (MWt): 3293
4. Nameplate Rating (Gross NWe):

1152 l

5. Design Electrical Rating (Net MWe):

1065

6. Maximum Dependable Capacity (Gross MWe):

0

7. Maximum Dependable Capacity (Net MWe):

0

8. If Changes occur in capacity Ratings (Items Number 3 Through 7) Since Last Report, Give Reason: N/A
9. Power Level To Which Restricted, If Any (Net MWe):

0

10. Reason For Restrictions, If Any: Administrative Hold

)

TEIS NONTE YEAR TO DATE CUNUIATIVE*

11. Hours in Reporting Period 0

0 73055

12. Hours Reactor Was Critical 0

0 45306

13. Reactor Reserve Shutdown Hours 0

.0 5150

14. Hours Generator On Line 0

0 44195

15. Unit Reserve Shutdown Hours 0

0 0

j

16. Gross Thermal Generation (MWh) 0 0

131868267 j

17. Gross Electrical Generation (MWh) 0 0

43473760

18. Net Electrical Generation (MWh) 0 0

42114009

19. Unit Service Factor 0

0 60.5

20. Unit Availability Factor 0

0 60.5

21. Unit capacity Factor (MDC Net) 0 0

54.2

22. Unit capacity Factor (DER net) 0 0

54.2

23. Unit Forced Outage Rate 0

0 21.6

24. Shutdowns Scheduled Over Next 6 Months (Type, Date, and Duration of Each): N/A
25. If Shut Down At End Of Reporting Period, Estimated Date of Startup: To be determined Excludes hours under administrative hold (June 1, 1985 to present)