ML20082K938

From kanterella
Jump to navigation Jump to search
Requests Exemption from Fire Protection Requirements of 10CFR50,App R Re Fire Areas Vs Fire Zones.Detailed Description of Fire Zone Boundaries Encl,Per Generic Ltr 83-33,to Form Section 1.3 of Fire Hazards Analysis Rept
ML20082K938
Person / Time
Site: Crane Constellation icon.png
Issue date: 11/30/1983
From: Hukill H
GENERAL PUBLIC UTILITIES CORP.
To: Stolz J
Office of Nuclear Reactor Regulation
References
5211-83-167, GL-83-33, NUDOCS 8312050349
Download: ML20082K938 (158)


Text

Nuclear t u ",i " n M e: - " "

Route 441 South Middletown, Pennsylvania 17057-0191 717 944-7621 TELEX 84 2386 Writer's Direct Dial Nurnber:

November 30, 1983 5211-83-167 Office of Nuclear Reactor Regulation Attn: John F. Stolz, Chief Operating Reactors Branch No. 4 U. S. Nuclear Regulatory Commission Washington, D.C.

20555

Dear Sir:

Three Mile Island Nuclear Station, Unit 1 (TMI-1)

Operating License No. DPR-50 Docket No. 50-289 Request for Exemption From the Requirements of 10 CFR 50 Appendix R as They Relate to Fire Areas Versus Fire Zones This letter is a request for an exemption to 10 CFR 50 Appendix R to the extent necessary, and transmits our detailed description of each of the fire zone boundaries at TMI-1.

The information is being provided to the NRC as a result of our March 15, 1983 meeting in Bethesda, Maryland and Generic Letter 83-33 dated October 19, 1983.

This detailed zone boundary description serves as our basis for an exemption to Appendix R, pursuant to 10 CFR 50.12 as requested by Generic Letter 83-33, to accept our Fire Hazard Analysis which is based on fire areas and se' divisions of fire areas into fire zones. The fire zones have been utilized in our Fire Hazards Analysis in identifing non-compliance with Appendix R Section III.G by themselves, in the same manner as the identification of Appendix R non-compliances are identified in a fire area.

The configuration of certain fire areas requires subdivisions into fire zones, and these subdivisions are based upon existing physical boundaries and existing or proposed ' fire protection and detection features. The characteristics of these fire zone bounde. ries represent an acceptable alternative to the strictly defined (GL 83-33)

Appendix R configurations.

This submittal will permit the NRC staff to include this information in their safety evaluation report on Appendix R for TMI-1, thereby forming a basis for future inspections of the implementation of Appendix R at TMI-1.

O 000 89 hh PDR GPU Nuclear Corporation is a subsidiary of the General Public Utilities Corporation f

Mr. J. F. Stolz 5211-83-167 A check in the amount of $4,000.00 for the Class III fee per 10 CFR 170.22 will be forwarded under separate cover.

Sincerely,

. D. liukill Director, TMI-l 11Dil: CJS : vj f Enclosures cc:

J. Van Vliet T. V. Wambach i

i i

l l

DETAILED DESCRIPTION OF FIRE ZONE BOUNDARIES OF THREE MILE ISLAND - UNIT 1 l

The following pages form new Section 1.3 of the Three Mile Island Nuclear Station - Unit 1 Fire Hazards Analysis Report and Appendix R Section III.G safe shutdown evaluation which was originally provided to the NRC Staff by GPU Nuclear i

Letter No. 5211-82-156 dated July 1, 1982.

l I

l I

i 1.3 Delineation of Fire Areas / Fire Zones The purpose of this section is to provide the technical basis for clarifi-cation of TMI-1 exemption requests from the requirements of Appendix R to 10CFR50.

The updated TMI-l Plant Fire Hazards Analysis, which was submitted with the Appendix R Section III,G Safe Shutdown Evaluation utilized an identical delineation of fire areas and fire zones as had initially been utilized in analyzing the effects a fire would have on the plant's capability to safely shutdown.

The following are the definitions of a fire ar~ea and fire zone as provided in Branch Technical Position APCSB 9.5-1, " Guidelines for Fire Protection for Nuclear Power Plants".

" Fire Area -

That portion of a building or plant that is separated from other areas by boundary fire barriers (walls, floors or roofs) with any opening or penetrations protected with seals or closures having a fire resistance rating equal to that of the barriers.

1.3-1

Fire Zones -

subdivisions of fire areas in which the fire suppression systems are designed to combat particular types of fires.

The concept of fire zone aids in defining to the fire fighter the fire parameters and the actions which would be necessary."

Initially, the plant was analyzed based upon the guidelines established by Appendix A to BTP APCSB 9.5-1.

The delineation of fire areas was es-tablished taking into consideration the location of redundant safety related components with respect to each other, existing building construction and the presence of in-situ fire hazards. For the purposes of analysis, certain fire areas were subdivided into fire zones taking into consideration the physical boundaries which exist between one fire zone and another within the same fire area.

In the current fire area / zone arrangement, further support for the subdivision of fire areas into fire zones is obtained by the aug-mentation of the plant fire protection system which has been achieved due to the modifications which were made as a result of the NRC's safety evaluation report with respect to the initial plant fire hazards analysis; e.g.,

fire zone boundaries bounded by fixed suppression systems.

It should be noted that Appendix R suggests evaluation of the plant on a fire area basis while Appendix A to BTP APCSB 9.5-1 did not specifically require fire area separa-tion of safe shutdown components.

By demonstrating via the plant fire hazards analysis that the zone arrangements will provide reasonable assurance that fires will not propagate from one side of the zone boundary i

1.3-2 I

to the other due to passive and active features integral with the zone boundary as well as combustible loadings on either side of the zone boundary, one can demonstrate that fire zones within a fire area can be analyzed by themselves.

The specific fire zones under consideration which have been analyzed as a fire area are as follows:

Item Fire Zone Location / Elevation Plant FHA Section I

1.

AB-FZ-1 Aux. Bldg. (Heat Exchanger Vault)/271' 4.2.3.1 I

1.

AB-FZ-2 Aux. Bldg. (Make-Up Pump A Cubicle)/281' 4.2.3.2 t~

I 3.

AB-FZ-2B Aux. Bldg. (Make-Up Pump B Cubicle)/281' 4.2.3.2 I

4.

AB-FZ-2C Aux. Bldg. (Make-Up Pump C Cubicle)/281' 4.2.3.2 I

5.

AB-FZ-3 Aux. Bldg. (Make-Up Valve Gallery)/281' 4.2.3.3 I

6.

AB-FZ-4 Aux. Bldg. (Penetration Area)/281' 4.2.3.4 I

7.

AB-FZ-5 Aux. Bldg. (General Area)/281' 4.2.3.5 I

8.

AB-FZ-6 Aux. Bldg. (Demineralizers & ESV-CCIA)/305' 4.2.3.6 I

9.

AB-FZ-6a Aux. Bldg. (ESV-CC1B)/305' 4.2.3.6a I 10.

AB-FZ-7 Aux. Bldg. (DHR & NSCCC Pumps)/305' 4.2.3.7 I 11.

AB-FZ-8 Aux. Bldg. (Waste Gas Decay Tanks)/305' 4.2.3.8 I 12.

AB-FZ-9 Aux. Bldg. (Rem. El. 305')

4.2.3.9 I 13.

FH-FZ-1 Fuel Hand. Bldg. (Basement)/281' 4.7.1 I 14.

FH-FZ-2 Fuel Hand. Bldg./El. 305' 4.7.2 I 15.

FH-FZ-3 Fuel Hand. Bldg./329' & 331' 4.7.3 I 16.

FH-FZ-4 Fuel Hand. Bldg./ Fuel Pool Area 4.7.4 1.3-3

I 17.

FH-FZ-5 Fuel Hand. Bldg. (Control Bldg. Patio Ares)/322' - 380' 4.7.5 I 18.

FH-FZ-6 Fuel Hand. Bldg. (Chiller Rm)/285' 4.7.6 I 19.

CB-FZ-5A Control Bldg. (North H&V Equip. Area)/380' 4.4.15 I 20.

CB-FZ-5B Control Bldg. (South H&V Equip. Area)/380' 4.4.16 II 1.

IB-FZ-1 Int. Bldg. (Valve Gallery & Penet. Rm)/295' 4.3.1 II 2.

IB-FZ-2 Int. Bldg. (Turb. Driven EFW Pump Room)/295' 4.3.2 II 3.

IB-FZ-3 Int. Bldg. (Mtr. Driven EFW Pump Room)/295' 4.3.3 II 4.

IB-FZ-4 Int. Bldg. (Rem. of El. 295')

4.3.4 II 5.

IB-FZ-5 Int. Bldg. (corridor)/305' 4.3.5 II 6.

IB-FZ-6 Int. Bldg. (General Area)/322' 4.3.6 II 7.

IB-FZ-7 Int. Bldg. (General Area)/355' 4.3.7 II 8.

IB-FZ-8 Int. Bldg. (Alligator Pit)/279'-0" 4.3.8 III 1.

ISPH-FZ-1 Int. Screen & Pump Hse (IR SWGR Area)/308' 4.6.1 III 2.

ISPH-FZ-2 Int. Screen & Pump Hse (IT SWGR Area)/308' 4.6.2 III 3.

ISPH-FZ-3 Int. Screen & Pump Hse (Trash Rake & Screen Area)/308' 4.6.3 IV 1.

RB-FZ-la Reactor Building - El. 281'-0" 4.1.1 RB-FZ-lb Reactor Building - El. 281'-0" 4.1.2 RB-FZ-1c Reactor Building - El. 281'-0" 4.1.3 IV 2.

RB-FZ-ld Reactor Building - D-Rings 4.1.6 RB-FZ-le Reactor Building - D-Rings 4.1.7 IV 3.

RB-FZ-2 Reactor Building - El. 308'-0" 4.1.4 IV 4.

RB-FZ-3 Reactor Building - El. 346'-0" 4.1.5 1.3-4

s s

I Auxiliary & Fuel Handling Buildings and Control Building (H&V Equipment Rm).

The Auxiliary and Fuel Handling Buildings and Control Building H&V Equipment Rooms are classified as one fire area which has been sub-divided into 20 fire zones for the purpose of analysis.

Each fire zone is treated independently and analyzed as a fire area due to the con-struction feature of its boundaries and/or existing or proposed active fire detention and suppression systems installed on either or both sides of the zone boundary.

The following is a brief description of the zone boundaries for each zone, tha zones active fire protection features, and the combustible loadings on either side of the non fire rated zone boundaries.

1.

AB-FZ Heat Exchanger Vault - E. 271' Zone boundaries consist of reinforced concrete walls, floor and ceiling.

The south and west walls, floor and ceiling are not adjacent to any other plant areas.

The upper portion of the east wall is adjacent to fire zone AB-FZ-5.

Penetrations through this wall tre detailed on ATT.A SH.l.

The remainder is not adjacent to any other plant area.

A portion of the north wall is adjacent to fire zone AB-FZ-5 via a stairwell.

A fire detection system will be installed over cable trays in this zone and will alarm in the control room. Combustible loadings on either side of the non fire rated zone boundary are:

1.3-5

a.

AB-FZ 2400 Btu /ft (2 min)*

b.

AB-FZ 20,062 Btu /ft (15 min)

The principal combustible in this zone is cable insulation.

Should ignition of cable occur either electrically or due to transient combustibles, exposed cable in tray penetrations is sealed with grout to preclude a slow burning cable fire from pro-pagating through the zone boundary although the seal is not fire rated.

The construction features of the zone boundarias, the combustible loading on either side of the boundary, the fire detection system which will be installed in the zone to alarm in the control room, plus the limited number of unsealed penetrations in the zone boundaries as shown in ATT.A provides reasonable assurance that a fire will not propagate from one side of the boundary to the other.

2.

AB-FZ-2A - Make-up Pump A Cubicle - El. 281' Three hour rated fire barriers are provided on the north, south and east walls as well as the ceiling.

Note that one penetration l

  • The figures in parentheses adjacent to all combustible loadings represent a corresponding gauge with respect to anticipated fire i

severity in time then assuming total consumption of combustibles and comparing them to the ASTM-E-119 time temperature curve.

1.3-6

for reach rods for valve operators through the east wall are not fully sealed. The floor is not adjacent to any other plant area.

The west boundary consists of reinforced concrete around the door section.

The remainder of the wall is solid concrete block all sealed to a 3 hour3.472222e-5 days <br />8.333333e-4 hours <br />4.960317e-6 weeks <br />1.1415e-6 months <br /> fire rating.

(Reference ATT. A SH.2.)

The door and the frame are not labeled.

The west boundary is adjacent to the fire zone AB-FZ-5.

A fire detection system, which alarms in the control roca, is provided for zone AB-FZ-2a.

Combustible loadings on either side of the nonfire rated zone boundary are:

a.

AB-FZ-2a - 59,996 Btu /ft (45 min) b.

AB-FZ-5

- 20,062 Btu /ft2 (15 min)

Note that fire zone AB-FZ-5 is a large zone. The location adja-cent to fire zone AB-FZ-2a is essentially devoid of combustibles.

The construction features of the zone boundary, the combustible loading on either side of the boundary, the fire detection system, which alarms in the control room, and the limited number of un-sealed penetrations (note that one reach rod through the east wall is not fully sealed) provides reasonable assurance that a fire will not propagate from one side of the boundary to the other.

1.3-7

3.

AB-FZ-2B - Make-up Pump B Cubicle - El. 281' Three hour rated fire barriers are provided on the north, south and east walls as well as the ceiling.

Note that one penetration for reach rods for valve operators through the east wall are not fully sealed.

The floor is not adjacent to any other plant area.

The west boundary consists of reinforced concrete around the door section.

The remainder of the wall is solid concrete block all sealed to a 3 hour3.472222e-5 days <br />8.333333e-4 hours <br />4.960317e-6 weeks <br />1.1415e-6 months <br /> fire rating.

(Ref. ATT.A SH.3.)

The door and frame are not labeled.

The west boundary is adjacent to fire zone AB-FZ-5.

A fire detection system which alarms in the control room is provided in zone AB-FZ-2b.

Combustible loadings on either side of the non fire rated zone boundary are:

a.

AB-FZ-2b - 16,663 Btu /ft (13 min) b.

AB-FZ 20,062 Btu /ft2 (15 min)

Note that fire zone AB-FZ-5 is a large zone.

The location ad-jacent to fire zone AB-FZ-2b is essentially devoid of combustibles.

The construction features of the zone boundary, the combustible loading on either side of the boundary, the fire detection system which alarms in the control room, and the limited number of un-sealed penetrations (note that reach rods through the east wall are not fully sealed) provides reasonable assurance that a fire will not propagate from one side of the boundary to the cther.

1.3-8

F 4.

AB-FZ-2c - Make-Up Pump C Cubicle - E1. 281' Three hour rated fire barriers are provided on the north, south and east walls as well as the ceiling.

Note that two penetrations for reach rods for valve operators through the east wall are not fully sealed.

The floor is not adjacent to any other plant area.

The west boundary consists of reinfosced concrete around the door section. The remainder of the wall is solid concrete block wall all sealed to a three hour fire rating.

(Ref. ATT. A SH.37 for penetration details.) The door and frame are not labeled.

The west boundary is adjacent to fire zone AB-FZ-5.- A fire detection system which alarms in the control room is provided for zone AB-FZ-2c.

Combustible loadings on either side of the non fire o

rated zone boundary are:

a.

AB-FZ-2c - 15,363 Btu /ft (12 min) b.

AB-FZ 20,062 Btu /ft (15 min)

Note that fire zone AB-FZ-5 is a large zone.

The location ad-l jacent to fire zone AB-FZ-2c is essentially devoid of combustibles.

I 1

The construction features of the zone boundary, the combustible loading on either side of the boundary, the fire detection system, the presence of only one unsealed penetration in the west boundary t

provides reasonable assurance that fire will not propagate from l

l 1

1 1.3-9

F one side of the boundary to the other.

Note that reach rods through the east wall are not fully sealed.

5.

AB-FZ Make-Up Valve Gallery - El. 281' A three hour rated fire barrier is provided on the west wall.

Note that four penetrations for reach rods for valve operators through the west wall are not fully sealed.

The floor is not adjacent to any other plant area.

The south wall is constructed of reinforced concrete and is adjacent to fire zone AB-FZ-5.

(Ref. ATT.A SH.S for penetration details.) The east wall is con-structed of reinforced concrete and is adjacent to fire zone FH-FZ-1.

(Ref. ATT.A. SK.6 & 7 for penetration details.)

In addition, zone FH-FZ-1 is provided with an automatic wetpipe sprinkler system.

The ceiling is constructed of reinforced con-crete and is adjacent to fire zone AB-FZ-6.

(Re f. ATT. A. SH.8 for penetration details.) The north boundary is adjacent to fire zone AB-FZ-4; there is no construction separating the zones.

However, i

fire zone AB-FZ-4 is equipped with a fixed deluge water spray system and a fire detection system which alarms in the control A fire detention system which alarms in the control room is room.

l' provided in fire zone AB-FZ-3.

Combustible loadings on either side of each nonfire rated zone boundary are as follows:

2 a.

AB-FZ 4581 Btu /ft

( 4 min) i b.

AB-FZ 20,062 Btu /ft (15 min) 1.3-10

.. =

c.

FH-FZ 38,954 Btu /ft2 (29 min) d.

AB-FZ 30,404 Btu /ft (23 min) e.

AB-FZ 52,822 Ben /ft (40 min) i The principal combustible in this zone is cable insulation.

Should ignition of cable occur either electrically or due to transient combustibles, exposed cable in tray penetrations are sealed with grout or koawool to preclude a slow burning cable fire from propagating through the zone boundary although the seal is not fire rated. The ionization detection system will alarm in the control room for slow burning cable fires which could propagate through the north boundary which has no physical barrier.

It is reasonable to assume that the fire brigade can reach the zone prior to a cable fire propagating outside this zone.

The construction features of the zone boundaries coupled with fixed suppression, the fixed suppression system where no physical boundaries exist, fire detection which alarms in the control room, the limited number of unsealed penetrations, and the combustible loadings on either side of the boundaries provides reasonable assurance that a fire will not propagate from one side of a boundary to the other.

1.3-11

n.

6.

AB-FZ Penetration Area - El. 281' A three hour rated fire barrier is provided on the south boundary where adjacent to the make-up pump cubicle and on the boundary adjacent to the Reactor Building. A portion of the south boundary adjacent to zone AB-FZ-3, the east boundary adjacent to zone FH-FZ-1, and the west boundary adjacent to zone AB-FZ-5 coes not consist of wall construction; however, zone AB-FZ-4 is equipped with an ionization fire detection system and a fixed deluge water spray system.

In addition, zone FH-FZ-1 on the east boundary is equipped with an automatic wetpipe sprinkler system. The floor of this zone over fire areas AB-FA-1 and AB-FA-2 is a three hour fire barrier with hatches to these areas consisting of steel plate; the remainder of the floor is not adjacent to any other plant area.

The ceiling consists of reinforced concrete with an open stairwell adjacent to zone AB-FZ-6; the remainder of the ceiling consists of reinforced concrete adjacent to zone AB-FZ-7.

(Ref. ATT.A. SH.9 for ceiling penetration details.) Combustible loadings on either side of each non fire rated zone boundary are as follows:

a.

AB-FZ 52,822 Btu /ft (40 min) b.

AB-FZ 4,581 Btu /ft

( 4 min) c.

FH-FZ 38,954 Btu /ft (29 min) d.

AB-FZ 30,404 Btu /ft2 (23 min) e.

AB-FZ 7,626 Btu /ft

( 6 min) f.

AB-FZ 20,062 Btu /ft2 (15 min) 1.3-12

The principal combustible in this zone is cable insulation.

Should ignition of cable occur either electrically or due to transient combustibles, the ionization detection system will alert the control room.

Cable fires are slow burning in nature.

It is reasonable to assume that the fire brigade can reach the zone prior to a cable fire propagating outside this zone.

The construction features of the zone boundaries coupled with an ionization detection system which alarms in the control room, the fixed suppression system in this zone where no physical boundaries exist, fixed suppression in an adjacent zone (FH-FZ-1) where no physical boundaries exist, and the combustible loadings on either side of the boundaries provide reasonable assurance that a fire will not propagate from one side of a boundary to the other.

7.

AB-FZ General Area - El. 281' A three hour rated fire barrier is provided on the south wall of this zone.

The north boundary is not adjacent to any other plant area.

The east boundary adjacent to the Fuel Handling Building (zone FH-FZ-1) is constructed of reinforced (note passage from the Auxiliary Building to the Fuel Handling Building is through an opening in this boundary); however, an automatic wetpipe sprinkler 1.3-13

system is located on the FH-FZ-1 side of this boundary.

(Ref.

ATT.A. SHS.10 & 11 for penetration details.) The boundary adja-cent to zone AB-FZ-3 is reinforced concrete.

(Re f. ATT. A. SH.5 for penetration details.) The south boundary of zone AB-FZ-2C is three hour fire rated.

The east boundary of this zone adjacent to fire zones AB-FZ-2A, AB-FZ-2b and AB-FZ-2C is constructed of rein-forced concrete around the door sections. The remainder of the boundary is solid concrete block. The doors and frames are not labeled.

(Ref. ATT.A SH.10 for penetration details.) The portion of the east boundary adjacent to zone AB-FZ-4 does not consist of wall construction; however, this portion of the boundary is pro-tected by fixed deluge water spray system.

The west boundary of this zone consists of reinforced concrete, a portion of which is not adjacent to any other plant area and a portion of which is adjacent to zone AB-FZ-1.

(Ref. ATT.A. SH.12 for penetration details.)

The floor of this zone is not adjacent to any other plant area except over fire areas AB-FA-1 and AB-FA-2 where the floor is a thrie hour rated fire barrier with hatches to these areas con-sisting of steel plate.

The ceiling of this zone consists of reinforced concrete and is adjacent to fire zones AB-FZ-6, AB-FZ-6A, AB-FZ-7, AB-FZ-8 and 1.3-14

AB-FZ-9.

(Reference ATT.A. SH.13 for penetration details.) A fire detection system which alarms in the control room will be provided in the north end of this rone which is the only portion of this zone where safe shutdown circuits are routed.

Combustible loadings on either side of each non fire rated boundary are as follows:

a.

AB-FZ 20,062 Btu /ft (15 min) b.

FH-FZ 38,954 Btu /ft (29 min) c.

AB-FZ 4,581 Btu /ft ( 4 min) d.

AB-FZ-2a - 59,966 Btu /ft (45 min) e.

AB-FZ-2b - 16,663 Btu /ft2 (13 min) f.

AB-FZ-2c - 15,363 Btu /ft (12 min) g.

AB-FZ 52,822 Btu /ft2 (40 min) h.

AB-FZ-6

- 30,404 Btu /ft2 (23 min)

i. AB-FZ-6a - 51,448 Btu /ft (39 min) j.

AB-FZ 7,626 Btu /ft ( 6 min) k.

AB-FZ 0 Btu /ft ( 0 min) 1.

AB-FZ 27,451 Btu /ft (21 min) m.

AB-FZ 2,400 Btu /ft ( 2 min)

The principal combustible in this zone is cable insulation.

Should ignition of cable occur either electrically or due to transient combustibles, exposed cable in tray penetrations sealed with grout or knowool will preclude a slow burning cable fire from 1.3-15

propagating through the zone boundary, although the seal is not fire rated.

Note that not all penetrations are sealed with grout or knowool. Where no physical boundaries between zones exist, it is reasonable to assume that the fire brigade can reach the zone prior to a cable fire propagating outside the zone due to slow burning nature of a cable fire.

The construction features of the zone boundaries coupled with fixed suppression systems at zone boundaries with and without wall construction, the fire detection system which will alarm in the control room, the limited number of unsealed penetrations, and the combustible loadings on either side of the boundaries provide reasonable assurance that a fire will not propagate from one side of a boundary to the other.

8.

AB-FZ Demineralizer and ESV-CCIA - El. 305' Zone boundaries consist of reinforced concrete walls, floor and ceiling.

The south boundary and portion of the ceiling are not adjacent to any other plant areas. The remainder of the ceiling adjacent to the chemical addition area is a three hour fire bar-rier. Most of the north boundary is adjacent to fire zone AB-FZ-7 with an open passage between the zones.

The remainder of the north boundary is adjacent to the Reactor Building which is a 1.3-16 I

three hour rated fire barrier.

(Ref. ATT.A. SH.14 for penetration details.) The east boundary is adjacent to the fuel handling building with two open passages between the zones.

(Ref. ATT.A.

SH.15 & 16 for penetration details.) Ihe west boundary is adja-cent to fire zone AB-FZ-9 with an open passage between the zones (Ref. ATT. A. SH.17 & 18 and CAI drawing E-422-023 for penetration details) and also adjacent to fire zone AB-FZ-6a with a one hour fire barrier to be added as part of the Appendix R modifications.

The floor is adjacent to fire zones AB-FZ-5, AB-FZ-3 and AB-FZ-4.

(Ref. ATT. A. SH.19 for penetration details.) A three hour rated fire barrier is provided on the floor where thi's zone is adjacent to fire zones AB-FZ-2a, AB-FZ-2b and AB-FZ-2c.

An ionization detection system which alarms in the control room is provided in this zone over safety related switchgear. Combustible loadings on either side of each non fire rated zone boundary are as follows:

a.

AB-FZ 30,404 Btu /ft (23 min) b.

AB-FZ 7,626 Btu /ft

( 6 min) c.

AB-FZ 4,581 Btu /ft2 ( 4 min) d.

AB-FZ 52,822 Btu /ft (40 min) e.

AB-FZ 20,062 Btu /ft2 (15 min) f.

FH-FZ 20,732 Btu /ft (16 min) 1.3-17

r Note:

Reference is not made to zone FH-FZ-1 as the zone boun-daries on the east wall are boundaries between reinforced concrete ventilating duct chases.

The principal combustible in this zone is cable insulation.

Should ignition of cable occur either electrically or due to transient combustibles, exposed cable in tray penetrations sealed with grout or koawool with ductseal will preclude a slow burning cable fire from propagating through the zone boundary, although the seal is not fire rated. Where cable tray penetrations are not sealed, it is reasonable to assume that the fire brigade can reach the zone prior to a cable fire propagating outside the zone due to slow burning nature of a cable fire.

The construction features of the zone boundaries, the ionization detection system which alarms in the control room, and the com-bustible loading on either side of the boundary provides reason-able assurance that a fire will not propagate from one side of a boundary to another.

9.

AB-FZ-6a - ES MCC B - El. 305' Zone boundaries consist of reinforced concrete walls on the north, west, and south walls with an open passage between the south wall 1.3-18'

F and fire zone AB-FZ-9.

The east boundary adjacent to zone AB-FZ-6 will be provided with a one hour fire barrier. he north wall is adjacent to zone AB-FZ-7.

(Ref. ATT. A. SH.20 for penetration details.) ne south and west walls are adjacent to fire zone AB-FZ-9 with an open passage to zone AB-FZ-I (Re f. ATT. A. SH.21

& 22 for penetration details.) ne floor is constructed of rein-forced concrete and is adjacent to fire zone AB-FZ-5.

(Ref.

ATT.A. SH.23 for penetration details.) An ionization detection system which alarms in the control room is provided in this zone.

S e ceiling is constructed of reinforced concrete and is a three hour rated fire barrier.

Combustible loadings on either side of each non fire rated zone boundary are as follows:

a.

AB-FZ-6a - 51,448 Btu /ft2 (39,g,)

b.

AB-FZ-7

- 7,626 Btu /ft

( 6 min) c.

AB-FZ-5

- 20,062 Btu /ft2 (15 min) d.

AB-FZ-9

- 27,451 Btu /ft (21 min)

The principal combustible in this zone is cable insulation.

Should ignition of cable occur either electrically or due to transient combustibles, exposed cable in tray penetrations sealed with grout or koawool will preclude a slow burning cable fire from propagaring through the zone boundary, although the seal is not fire rated. Where cable tray penetrations are not sealed, it is reasonable to assume that the fire brigade can reach the zone 1.3-19

prior to a cable fire propagating outside the zone due to the slow burning nature of a cable fire.

The construction features of the zone boundaries, the ionization detection system which alarms in the control room, the limited number of unsealed cable tray penetretions and the combustible loading on either side of the boundary provides reasonable as-surance that a fire will not propagate from one side of a boundary to another.

10.

AB-FZ DHR & NSC CC Pumps - El. 305' Zone boundaries consist of reinforced concrete walls, floor and ceiling with an open passage in the south boundary between this zone and zone AB-FZ-6.

The north boundary is not adjacent to any other plant area. The east boundary is adjacent to the Reactor Building which is a three hour rated fire barrier. The west boundary is adjacent to zone AB-FZ-9.

(Ref. ATT.A. SH.24 for penetration details.) The south boundary is adjacent to zones AB-FZ-6, AB-FZ-6a, and AB-FZ-9.

(Ref. ATT. A. SH.25 for pene-tration details.) The floor is adjacent to zones AB-FZ-4 and AB-FZ-5.

(Ref. ATT.A. SH.26 for penetration details.) The An ionization ceiling is not adjacent to any other plant areas.

detection system which provides separate alarms for each pump i

l I

1.3-20 1

I

cubicle in the control room is provided in this zone. Combustible loadings on either side of each non fire rated zone boundary are as follows:

a.

AB-FZ 7,626 Btu /ft

( 6 min) b.

AF-FZ 30,404 Btu /ft (23 min) c.

AB-FZ-6a - 51,448 Btu /ft (39 min) d.

AB-FZ 27,451 Btu /ft2 (21 min) e.

AB-FZ 52,822 Btu /ft2 (40 min) f.

AB-FZ 20,062 Btu /ft (15 min)

'Ihe principal combustible in this zone is cable insulation.

Should ignition of cable occur either electrically or due to transient combustibles, exposed cable in tray penetrations sealed with koawool will preclude a slow burning cable from propagating through the zone boundary, although the seals are not fire rated.

Where cable tray penetrations are not sealed, it is reasonable to assume that the fire brigade can reach the zone prior to a cable fire propagating outside the zone due to the slow barning nature of a cable fire.

The construction features of the zone boundaries, the ionization detection system which alarms in the control room, the limited number of unsealed cable tray penetrations, and the combustible 1.3-21

r l

loading on either side of the boundary provides reasonable as-surance that a fire will not propagate from one side of a boundary to the other.

r i

11.

AB-FZ Waste Gas Decay Tanks - El. 305' d

Zone boundaries consist of reinforced concrete walls, floor and ceiling with an open passage in the east boundary between this zone and zone AB-FZ-9.

All boundaries are adjacent to zone AB-FZ-9. (Ref. ATT.A SHS.27-30 for penetration details.) The floor is adjacent to zone AB-FZ-5.

Ref. ATT. A 'SH.61 and CAI drawing E-422-018 for penetration details.

The ceiling adjacent to the chemical addition area is a three hour rated barrier.

Combustible loadings on either side of each nonfire rated zone boundary are as follows:

a.

AB-FZ 0 Btu /ft

( 0 min) b.

AB-FZ 27,451 Btu /ft2 (21 min) i c.

AB-FZ 20,062 Btu /ft2 (15 min)

The construction features of the zone boundaries, the limited number of penetrations and the combustible loadings on either side of the boundaries provides reasonable assurance that a fire will not proFagate from one side of a boundary to the other.

1.3-22

12.

AB-FZ Rm. - El. 305' Zone boundaries consist of reinforced concrete walls, floor and ceiling with an open passage in the north boundary between this zone and zone AB-FZ-6a and two open passages in the east boundary between thit zone and zone AB-FZ-6.

Also, an open passage exists between this zone and zone AB-FZ-8.

A portion of the north bound-ary, the west boundary and the south boundary are not adjacent to any other plant area.

The remainder of the north boundary is t

adjacent to fire zones AB-FZ-6a and AB-FZ-7 with an open passage to zone AB-FZ-6a, (Ref. ATT. A. SH.32 for penetration details. )

The east boundary is adjacent to fire zone AB-FZ-6.

( Re f. ATT. A.

SH.33 for penetration details.) This zone completely surrounds zone AB-FZ-8 which is enclosed by reinforced concrete walls.

(Ref. ATT. A. SHTS. 27-30 for penetration details. ) The floor is adjacent to zone AB-FZ-5.

(Ref ATT.A. SH.34 and 35 for pene-4 tration details.) A portion of the ceiling adjacent to the chemical addition area is a three hour fire rated barrier; the remainder of the ceiling is not adjacent to any other plant area.

The principal combustible in this zone is activated charcoal which is contained in the filtration units for the Reactor Building Purge Exhaust and Auxiliary and Fuel Handling Exhaust systems l

located in the fan equipment room portion of this zone. The units 1.3-23

_..~ --

i

~

are provided with thermal detectors which alarm in the control room and manually actuated deluge water spray systems. Cable insulation is minimal in this zone. Should ignition of cable occur either electrically or due to transient combustibles, ex-posed cable in tray penetrations sealed with grout or koawool will preclude a slow burning cable fire from propagating through the zone boundary, although the seals are not fire rated. Where cable tray penetrations are not sealed, it is reasonable to assume that the fire brigade can reach the zone prior to a cable fire propa-gating outside the zone due to the slow burning nature of a cable fire.

Combustible loadings on either side of each non fire rated zone boundary as follows:

a.

AB-FZ-9

- 27,451 Btu /ft (21 min) b.

AB-FZ-8 0 Btu /ft

( 0 min) c.

AB-FZ-6a - 51,448 Btu /ft (39 min) d.

AB-FZ-6

- 30,404 Btu /ft2 (23 min) e.

AB-FZ-7

- 7,626 Btu /ft

( 6 min) l f.

AB-FZ-5

- 20,062 Btu /ft (15 min)

The construction features of the zone boundaries, fire detection l

and protection for charcoal filters, the limited number of pene-I trations, and the combustible loadings on either side of the I

i f

i l

l l

1.3-24 i

.=

r boundaries provides reasonable assurance that a fire will not propagate from one side of a boundary to the other.

13.

FH-FZ Basement Elev. 281' - 0" Zone boundaries consist of reinforced concrete walls, floor and ceiling. Most of the east boundary is not adjacent to any other plant area except for a three hour rated fire barrier where adja-cent to zone IB-FZ-8, and a non fire rated boundary where adjacent to FH-FZ-6.

A raceway which runs through the east wall to fire area CB-FA-1 in the east boundary of zone FH-FZ'-1 is sealed to a three hour fire rating.

The north boundary is adjacent to the Reactor Building which is a three hour fire rated barrier.

The south a -d west boundary is a three hour rated fire barrier where adjacent to the Air Intake Tunnel (AIT-FA-1).

The remainder of the west boundary is adjacent to fire zones AB-FZ-3, AB-FZ-4 and AB-FZ-5.

(Ref. ATT.A. SH.36 for penetration details.) An open passage exists between this zone and zone AB-FZ-5 and the boundary between this zone and zone AB-FZ-4 does not consist of wall con-struction; however, this zone (FH-FZ-1) is equipped with an auto-matic wet pipe sprinkler system and zone AB-FZ-4 is equipped with a fixed deluge water spray system.

The floor of this zone is not adjacent to any other plant area.

The ceiling of this zone is adjacent to zone FH-FZ-2 and FH-FZ-4 (Ref. ATT.A. SHTS.37 & 38 for 1.3-25

i penetration details).

Note that FH-FZ-4 is the fuel pool.

Its boundary is not fire rated, but due to the nature of this zone, combustible loadings (combustible loading is on the operating floor between FH-FZ-2 and FH-FZ-4) will not be compared to each other. An ionization detection system which alarms in the control room is provided in this zone.

Combustible loadings on either side of each zone boundary are as follows:

a.

FH-FZ 38,954 Btu /ft2 (29 min) b.

AB-FZ 4,581 Btu /ft2 ( 4 min) c.

AB-FZ 52,822 Btu /ft2 (40 min) d.

AB-FZ 20,062 Btu /ft (15 min')

FH-FZ 20,732 Btu /ft2 (16 min) e.

f.

FH-FZ 3,484 Btu /ft ( 3 min)

The principal combustible in this zone is cable insulation.

Should ignition of cable occur either electrically or due to transient combustibles, exposed cable in tray penetrations is sealed with grout or koawool to preclude a slow burning cable fire from propagating through the zone boundary, although the seal is not fire rated.

It is reasonable to assume that a cable fire will not propagate through the east boundary adjacent to fire zone AB-FZ-4 where no physical boundary exists due to the slow burning characteristics of cable fires, and existing detection and sup-pression systems in this zone.

1.3-26

The construction features of the zone boundaries coupled with fixed suppression, the fixed suppression system where no physical boundaries exist, fire detection which alarms in the control room, the limited number of unsealed penetrations, and the combustible loadings on either side of the boundaries provides reasonable assurance that a fire will not propagate from one side of a bound-ary to the other.

14.

FH-FZ Fuel Handling Building - Elev. 305' Zone boundaries consist of concrete walls, floor and ceiling. The south boundary of this zone is three hour fire rated except on the operating floor which is common between TMI-1 and 2.

The west boundary is adjacent to fire zone AB-FZ-6 with an open passage between the zones.

(Ref. ATT.A. SH.39 for penetration details.)

The remainder of the west boundary is not adjacent to any otner plant area.

The boundaries between FH-FZ-2 and FH-FZ-4 (fuel pool) are reinforced concrete (no penetrations) except on the operating floor where no boundaries exist. The boundaries between FH-FZ-2 and FH-FZ-3 are reinforced concrete.

(Ref. ATT.A. SHTS.

49 & 50 for penetration details.) The boundaries of FH-FZ-2 in the control building patio (Hot Machine Shop) are three hour fire rated barriers except where adjacent to zone FH-FZ-4 (no pene-trations).

The north boundary for the Reactor and Turbine 1.3-27

Buildings is a three hour rated fire barrier.

For the north boundary adjacent to the duct chase (FH-FZ-1) Ref. ATT. A. SH.40 for penetration details.

The floor of this zone is adjacent to zone FH-FZ-1 and FH-FZ-6.

(Ref. ATT.A. SHTS.42 & 43 for penetration details.) ne remainder is not adjacent to any other plant area. De ceiling or this zone is adjacent to zones FH-FZ-3 and FH-FZ-5.

(Re f. ATT. A. SHTS.44-47

& 50 for penetration details.) Note that the control building patio portion of FH-FZ-2 is provided with an automatic wet pipe sprinkler system where adjacent to FH-FZ-4, FH-FZ-5 and FH-FZ-6.

H e remainder of the ceiling is not adjacent to any other plant area.

Combustible loadings on either side of each non fire rated zone boundary are as follows:

a.

FH-FZ 20,732 Btu /ft (16 min) b.

AB-FZ 30,404 Btu /ft (23 min) c.

FH-FZ 2,149 Btu /ft

( 2 min) d.

FH-FZ 7,717 Btu /ft2 ( 6 min) e.

FH-FZ 93,398 Btu /ft (70 min) f.

FH-FZ 38,954 Btu /ft (29 min) g.

FH-FZ 3,484 Btu /ft

( 3 min) ne principal combustible in this zone is cable insulation.

Should ignition of cable occur either electrically or due to 1.3-28 l

transient combustibles exposed cable in tray penetraticas is sealed with grout or koawool to preclude a slow burning cable fire from propagating through the zone boundary, although the seal is not fire rated. Where cable tray penetrations are not sealed, it is reasonable to assume that the fire brigade can reach the zone prior to a cable fire propagating outside the zone due to the slow burning nature of a cable fire.

H e construction features of the zone boundaries coupled with fixed suppression, the limited number of unsealed penetrations, and the combustible loadings on either side of 'the. boundaries provides reasonable assurance that a fire will not propagate from one side of a boundary to the other.

15.

FH-FZ Fuel Handling Building - El. 329' & 33{

Zone boundaries consist of reinforced concrete walls and a com-bination of grating and reinforced concrete for floors and ceilings. h e west boundary consists of a three hour rated fire barrier.

H e east boundary is adjacent to the fuel pool (no pene-trations).

he north boundary is adjacent to a ventilating duct chase (FH-FZ-1) and as such, combustible loadings between FH-FZ-3 and FH-FZ-1 will not be compared to each other.

(Ref. ATT.A.

SH.48 for penetration details.) A portion of the south boundary 1.3-29

is adjacent to zone FH-FZ-2; the remainder being adjacent to an elevator shaft which is part of zone FH-FZ-1 and as such, com-bustible loadings between FH-FZ-3 and FH-FZ-1 will not be com-pared.

(Ref. ATT. A. SH.49 for penetration details.) The floor is adjacent to zone FH-F7-2 (Ref. ATT.A. SH.50) and the ceiling is adjacent to zone FH-FZ-4.

(Ref. ATT.A. SH.51 for penetration details.) Cembustible loadings on either side of the non fire rated zone boundaries are as follows:

a.

FH-FZ 7,717 Btu /ft

( 6 min) b.

FH-FZ 20,732 Btu /ft2 (16 min) c.

FH-FZ 38,954 Btu /ft2 (29 min) d.

FH-FZ 2,149 Btu /ft2 ( 2 min)

The principal combustible in this zone is cable insulation.

Should ignition of cable occur either electrically or due to transient combustibles, it is reasonable to assume that the fire brigade can reach the zone prior to a cable fire propagating out-side the zone due to tha slow burning nature of a cable fire.

The construction features of the zone boundaries and the com-l bustible loadings on either side of the boundaries provides reasonable assurance that a fire will not propagate from one side l

l of a boundary to the other.

[

1.3-30 t

T 16.

FH-FZ Fuel Pool Area Zone boundaries consist of reinforced concrete walls and ceiling except on the operating floor where no physical construction exists on'the south boundary between this zone and zone FH-FZ-2; however, combustibles in FH-FZ-2 are concentrated on elevation 305, not on the operating floor.

Boundary construction and com-bustible loading is only discussed on the operating floor as the area under below the operating floor for this zone is the fuel pool. A portion of the floor over zone FH-FZ-3 consists of rein-forced concrete and grating.

(Ref. ATT. A. SH.52 for penetration details.) A portion of the south boundary is adjacent to an ele-vator shaf t (FH-FZ-1) and as such, combustible loading comparison between FH-FZ-4 and FH-FZ-1 will not be made. Most of the south boundary on the operating floor is a large high bay area open to the TM1-2 fuel handling building elevation 305' and 348'.

The east boundary of this zone is adjacent to zone FH-FZ-5 (Re t. ATT. A.

SH.53 for penetration details.) The west boundary of this zone is a three hour rated fire barrier.

The ceiling is not adjacent to any other plant area.

Combustible loadings on either side of the non fire rated zone boundaries are as follows:

a.

FH-FZ 2,149 Btu /ft

( 2 min) b.

FH-FZ 7,717 Btu /ft

( 6 min) c.

FH-FZ 93,398 Btu /ft (70 min) 1.3-31

?

d.

FH-FZ 20,732 Btu /ft (16 min)

TMI-2 operating floor - 19,744 Btu /ft2 (15 min) e.

The principal combustibles in this zone are cable insulation and lube oil in negligible quantities.

Should ignition of cable occur either electrically or due to transient combustibles, it is reasonable to assume that the fire brigade can reach the zone prior to a cable fire propagating outside the zone due to the slow burning nature of a cable fire.

The construction features of the zone boundaries, and the com-bustible loadings on either side of the boundaries provides reasonable assurance that a fire will not propagate from one side of a boundary to the other.

17.

FH-FZ Control Building Patio Area - Elev. 322' to 380' Zone boundaries consist of reinforced concrete walls, floor and ceiling. The north and south boundaries are three hour fire rated barriers.

The west boundary is adjacent to tire zones FH-FZ-2 and FH-FZ-4.

(Ref. ATT.A. SH.54 for penetration details.) The east boundary is a three hour rated fire barrier except on elevation 380' where adjacent to zones CB-FZ-Sa and CB-FZ-5b.

(Ref. ATT.A.

SH.55 for penetration details.) However, combustibles in FH-FZ-5 1.3-32

are not concentrated on elevation 380'.

The floor is adjacent to zonc FH-FZ-2, however, FH-FZ-2 is provided with an automatic wet pipe sprinkler system where adjacent to FH-FZ-5.

(Ref. ATT.A.

SH.56 for penetration details.) The ceiling is not acjacent to any other plant areas.

Combustible loadings on either side of non fire rated zone boundaries are:

a.

FH-FZ 93,398 Btu /ft (70 min) b.

FH-FZ-2

- 20,732 Btu /ft2 (16 min) c.

FH-FZ 2,149 Btu /ft ( 2 min) d.

CB-FZ-Sa - 15,280 Btu /ft2 (12 min) e.

CB-FZ-Sb - 14,680 Btu /f t2 (11 min)

Note that combustibles here are charcoal only protected by deluge water spray systems.

The principal combustible in this zone is cable insulation.

Two trays between this zone and zone CB-FZ-Sa are unsealed, however, the main concentration of combustibles is not in this area of this Should ignition of cable occur either electrically or due zone.

to transient combustibles, exposed cable in tray penetrations sealed with koawool will preclude a slow burning cable fire from propagating through the zone boundary, although the seal is not fire rated. Where cable tray penetrations are not sealed, it is l

reasonable to assume that the fire brigade can reach the zone 1

I l

1 1.3-33

t prior to a cable fire propagating outside the zone due to the slow burning nature of a cable fire.

The construction features of the zone boundaries coupled with fixed suppression and the combustible loadings on either side of the boundaries provides reasonable assurance that a fire will not propagate from one side of a boundary to the other.

18.

FH-FZ Chiller Room - El. 285' Zone boundaries consist of reinforced concrete walls, floor and ceiling.

The east boundary is a three hour rated fire barrier.

The north and south boundaries are not adjacent to any other plant areas. The west boundary is adjacent to fire zone FH-FZ-1 which is provided with an automatic wet pipe sprinkler system. The floor is not adjacent to any other plant areas.

The ceiling is adjacent to zone FH-FZ-2 which is provided with an automatic wet pipe sprinkler system.

(Ref. ATT.A. SH.57 for penetration details.) Combustible loadings on either side of each nonfire a

rated zone boundary are as follows:

a.

FH-FZ 3,484 Btu /ft2 ( 3 min) b.

FH-FZ 20,732 Btu /ft (16 min) c.

FH-FZ 38,954 Bro /ft (29 min) 1.3-34

The principal combustible in this zone is lube oil contained in the machinery. Construction features of the zone boundaries coupled with fixed suppression and the combustible loadings on either side of the boundaries provides reasonable assurance that a fire will not propagate from one side of a boundary to the other.

19.

CB-FZ-Sa - North H & V Equipment Room - El. 380' Zone boundaries consist of reinforced concrete walls, floor and ceiling. The north, south and east boundaries as well as the e

floor are three hour rated fire barriers.

The ceiling is not adjacent to any other plant area. The west boundary is adjacent to fire zone FH-FZ-5; however, combustibles in fire zone FH-FZ-5 are not concentrated on elevation 380'.

A major portion of the west boundary consists of reinforced concrete. The remainder consists of an unrated sheet metal wall with an unlabelled door.

(Ref. ATT.A. SH.58 for penetration details.) Combustible loadings on either side of the non fire rated zone boundaries are as follows:

a.

CB-FZ-Sa - 15,280 Btu /ft (12 min) b.

FH-FZ 93,398 Btu /ft2 (70 min) l Combustibles are not concentrated on elevation 380'.

1.3-35

The principal combustible in this zone is activated charcoal which is contained in the Control Building Emergency Air Filtration unit. The unit is provided with thermal detectors which alarm in the control room and manually activate deluge water spray system protecting the charcoal. Activation is achieved from a control panel in fire area CB-FA-4b (control room).

Cable insulation exists within this zone. Should ignition of cable occur either electrically or due to transient combustibles, where cable pene-trations are not sealed in the sheet metal wall, it is reasonable to assume that the fire brigade can reach the zone prior to a cable fire propagating outside the zone due to the slow burning

~

nature of a cable fire.

The construction features of the zone boundaries, fire detection and protection for charcoal filters, the limited number of pene-trations, and the combustible loadings on either side of the boundaries provides reasonable assurance that a fire will not propagate from one side of the boundary to the other.

20.

CB-FZ-5b - South H & V Equipment Room - El. 380' Zone boundaries consist of reinforced concrete walls, floor and ceiling.

The north and east boundaries as well as the floor are three hour fire barriers.

The south boundary and ceiling are not 1.3-36

adjacent to any other plant area.

The west boundary is adjacent to fire zone FH-FZ-5; however, combustibles in fire zone FH-FZ-5 are not concentrated on elevation 380'.

A major portion of the west boundary consists of reinforced concrete. The remainder consists of a sheet metal wall with an unlabeled door.

(Ref.

ATT.A SH.59 for penetration details.) Combustible loadings on either side of the non fire rated zone boundaries are as follows:

a.

CB-FZ-5b - 14,680 Btu /ft (11 min) b.

FH-FZ 93,398 Btu /ft2 (70 min)

Combustibles are not concentrated on elevation 380'.

The principal combustible in this zone is activated charcoal which is contained in the Control Building Emergency Air Filtration Unit. The unit is provided with thermal detectors which alarm in the control room and a manually actuated deluge water spray system protecting the charcoal. Activation is achieved from a control panel in fire area CB-FA-4b (control room). Cable insulation exists within this zone. Should ignition of cable occur either electrically or due to transient combustibles, exposed cable in penetrations sealed with koawool will preclude a slow burning cable fire from prcpagating through the zone boundary, although the seals are not fire rated.

1.3-37

The construction features of the zone boundaries, fire detection and protection for charcoal filters, the limited number of pene-trations, and the combustible loadings on either side of the boundaries provides reasonable assurance that a fire will not propagate from one side of the boundary to the other.

The above discussion which describes the features, both passive and active, which are used to delineate the zone boundaries of the Auxiliary and Fuel Handling Building including the Control Building H & V Equipment Rooms adequately demonstrates the capa-bility for the limiting of fire within the boun'daries of each zone.

As such, this legitinizes the TMI-1 plant fire hazards analysis concept to evaluate each zone by itself.

We therefore maintain that the safety evaluation in Section 3.0 which identi-fies noncompliances with Section III G of Appendix R to 10CFR50 based upon this concept is valid.

l l

l II Intermediate Building l

The Intermediate Building is classified as one fire area which has been subdivided into 8 zones for the purpose of analysis.

Each fire zone is treated independently and analyzed as a fire area due to the construc-tion features of its boundaries and/or existing active fire detection systems installed on either or both sides of the zone boundary.

The 1.3-38 l

I i

following is a brief description of the zone boundaries for each zone, the zones active fire protection features, and the combustible loadings on either side of the nonfire rated zone boundaries:

I i

1.

IB-FZ Valve Gallery and Penetration Room - El. 295' Zone boundaries consist of reinforced concrete walls, floor and ceiling. The north and west boundaries are adjacent to fire zone IB-FZ-4 on elevation 295' with an open passage between the zones and adjacent to fire zone IB-FZ-5 on elevation 305' with an "A" label door provided between the zones on elevation 305'.

(Ref.

ATT.A. SHTS.60 and 61 for penetration details.) The south bound-ary is a three hour rated barrier.

The east boundary is adjacent to fire zone IB-FZ-2.

(Ref. ATT. A. SH.62 for penetration details.) A portion of the floor is adjacent to fire zone IB-FZ-8 (Ref. ATT.A. SH.63 for penetration details).

The remainder of the floor is not adjacent to any other plant area. The ceiling is adjacent to fire zone IB-FZ-6.

(Ref. ATT.A. SH.64 for penetration details.) Combustible loadings on either side of each nonfire rated zone boundary are as follows:

a.

IB-FZ 10,199 Btu /ft (8 min) b.

IB-FZ 8,925 Btu /ft (7 min) c.

IB-FZ 9 Btu /ft (0 min) d.

IB-FZ 549 Btu /ft2 (1 min) 1.3-39

e.

IB-FZ 4,487 Btu /ft (4 min) f.

IB-FZ 0 Btu /ft (0 min) i l

The principal combustible in this zone is cable insulation.

Should ignition of cable occur either electrically or due to transient combustibles, exposed cable in tray penetrations sealed with grout will preclude a slow burning cable fire from pro-pagating through the zone boundary, although the seal is not fire rated. Where cable tray penetrations are not sealed, it is reasonable to assume that the fire brigade can reach the zone prior to a cable fire propagating outside the zone due to the slow burning nature of a cable fire.

Construction features of the zone boundaries, the fire detection system which alarms in the control room, the limited number of unsealed tray penetrations, and the combustible loadings on either side of the boundaries provides reasonable assurance that a fire will not propagate from one side of the boundary to the other.

2.

IB-FZ Turbine Driven EFW Pump Room - El. 295' Zone boundaries consist of reinforced concrete walls, floor and ceiling.

The north boundary is adjacent to fire zone IB-FZ-4 on elevation 295' with an open passage between the zones, and adja-cent to fire zone IB-FZ-5 on elevation 305' with an "A" label door 1.3-40

provided between the zones on elevation 305'-0".

(Ref. ATT.A.

SH.65 for penetration details.) The south boundary is a three hour rated fire barrier. The east boundary is adjacent to fire zone IB-FZ-3.

(Ref. ATT.A. SH.66 for penetration details.) The west boundary is adjacent to fire zone IB-FZ-1.

( Re f. ATT.' A.

SH.67 for penetration details.) A portion of the floor is adja-cent to fire zone IB-FZ-8; the remainder of the floor is not adja-cent to any other plant area.

(Ref. ATT.A. SH.68 for penetration details.) The ceiling is adjacent to fire zone IB-FZ-6.

(Ref.

ATT.A. SH.69 for penetration details.) Combustible loadings on either side of each nonfire rated zone boundary are as follows:

a.

IB-FZ 10,199 Btu /ft (8 min) b.

IF-FZ 8,925 Btu /ft (7 min) c.

IB-FZ 5,659 Btu /ft (5 min) d.

IB-FZ 9 Btu /ft2 (0 min) e.

IB-FZ 549 Btu /ft (1 min) f.

IB-FZ 4,487 Btu /ft (4 min) g.

IB-FZ 0 Btu /ft (0 min)

The principal combustibles in this zone are cable insulation and lube oil. Should ignition of cable occur either electrically or due to transient combustibles, exposed cable in tray penetrations sealed with grout will preclude a slow burning cable fire from propagating through the zone boundary, although the seal is not 1.3-41

fire rated. Where cable tray penetrations are not sealed, it is reasonable to assume that the fire brigade can reach the zone prior to a cable fire propagating outside the zone due to the slow burning nature of a cable fire.

Construction features of the zone boundaries, the fire detection system, which alarms in the control room, the limited number of unsealed tray penetrations, and the combustible loadings on either side of the boundaries provides reasonable assurances that a fire will not propagate from one side of the boundary to the other.

3.

IB-FZ Motor Driven EFW Pump Room - El. 295' f

Zone boundaries consist of reinforced concrete walls, floor and ceiling.

The north boundary is adjacent to fire zone IB-FZ-4 on elevation 295' with two open passages between the zones, and ad-jacent to fire zone IB-FZ-5 on elevation 305' with three "A"

labelled doors provided between the zones on elevation 305'-0".

(Ref. ATT.A. SH.70 and 71 for penetration details.) The south and east boundaries are three hour rated fire barriers.

The west boundary is adjacent to fire zone IB-FZ-2.

(Ref. ATT.A. SH.72 for penetration details.) A portion of the floor is adjacent to fire zone IB-FZ-8; the remainder of the floor is not adjacent to any other plant area.

(Ref. ATT.A. SH.73 for penetration details.)

1.3-42

The ceiling is adjacent to fire zone IL-FZ-6.

(Ref. ATT.A. SH.74, 75 and 76 for penetration details.) Combustible loadings on either side of each non fire rated zone boundary are as follows:

a.

IB-FZ 5,659 Btu /ft2 (5 min) 4 b.

IB-FZ 10,199 Btu /ft (8 min) c.

IB 'Z 9 Btu /ft2 (0 min) d.

IB-FZ 549 Btu /ft (1 min) e.

Ib-FZ 4,487 Btu /ft (4 min) f.

IB-FZ 0 Btu /ft2 (0 uin)

The principal combustible in this zone is cable insulation.

Should ignition of cable occur either electrically or due to transient combustibles, exposed cable in tray penetrations sealed with grout will preclude a slow burning cable fire from pro-pagating through the zone boundary, although the seal is not fire rated. Where cable tray penetrations are not sealed, it is reasonable to assume that the fire brigade can reach the zone prior to a cable fire propagating outside the zone due to the slow burning nature of a cable fire.

Construction features of the zone boundaries, the fire detection system, which alarms in the control room, the limited number of unsealed tray penetrations, and the combustible loadings on either side of the boundaries provides reasonable assurance that a fire will not propagate from one side of the boundary to the other.

1.3-43

I 4.

IB-FZ Remainder of El. 295' Zone boundaries consist of reinforced concrete walls, floor and ceiling.

The west boundary is not adjacent to any other plant area. A portion of the north boundary is adjacent to the Diesel Generator Building.which is a three hour rated fire barrier.

The remainder of the north boundary is not adjacent to any other plant areas. The east boundary adjacent to the Turbine Building and the I

south boundary adjacent to the Reactor Building are three hour l

rated fire barriers.

The remaining east boundary is adjacent to fire zone IB-FZ-1.

(Ref. ATT.A. SH.77 for penetration details.)

The remaining south boundary is adjacent to fire zones IB-FZ-1, IB-FZ-2, and IB-FZ-3 with open passages to each zone.

(Ref.

ATT.A. SHTS.60, 65 and 70 for penetration details.) A portion of the floor is adjacent to fire zone IB-FZ-8; the remainder of the t

l floor is not adjacent to any plant area.

(Ref. ATT.A. SH.78 for l

l penetration details.) The ceiling is adjacent to fire zone

(

l IB-FZ-5.

(Ref. ATT.A. SH.79 for penetration details.)

Com-bustible loadings on either side of each nonfire rated zone boundary are as follows:

a.

IB-FZ 9 Btu /ft (0 min) b.

IB-FZ 8,925 B';u/ft2 (7,;,)

c.

IB-FZ 10,199 Btu /ft (8 min) d.

IB-FZ 5,659 Btu /ft (5 min) i l

l l

1.3-44 i

i t

e.

IB-FZ 549 Btu /ft2 (1,g,)

f.

IB-FZ 0 Btu /ft (0 min)

The principal combustible in this zone is cable insulation which is negligible.

Should ignition of cable occur either electrically

~

or due to transient combustibles, it is reasonable to assume that the fire brigade can reach the zone prior to a cable fire pro-pagating outside the zone due to the slow burning nature of a cable fire.

Construction features of the zone boundaries, the limited number of unsealed tray penetrations, and the combustible loadings on either side of the boundaries provides reasonable assurance that a fire will not propagate from one side of the boundary to the other.

5.

IB-FZ Corridor - El. 305' Zone boundaries consist of reinforced concrete walls, floor and j

ceiling.

The north boundary adjacent to the Diesel Generator i

Building and Service Building is a three hour fire rated barrier.

The east boundary adjacent to the Turbine Building and the south boundary adjacent to the Reactor Building are three hour rated barriers.

The remaining east boundary is adjacent to fire zone 1.3-45

i IB-FZ-1.

(Ref. ATT.A. SH.80 for penetration details.) The re-maining south boundary is adjacent to fire zones IB-FZ-1, IB-FZ-2, and IB-FZ-3 with "A" labelled doors provided between zone IB-FZ-4 and those zones on Elevation 305'.

(Ref. ATT. A. SHS.60, 65 and 70 for penetration details.) The west boundary is not adjacent to any other plant areas. The floor is adjacent to fire zone IB-FZ-4.

(Ref. ATT.A. SH.81 for penetration details.) The ceiling is adjacent to fire zone IB-FZ-6.

(Re f. ATT. A. SH.82 for penetration details.) Combustible loadings on either side of each nonfire rated zone boundary are as follows:

a.

IB-FZ 549 Btu /ft (1 min) b.

IB-FZ 8,925 Btu /ft (7 min) j c.

IB-FZ 10,199 Btu /ft (8 min) d.

IB-FZ 5,659 Btu /ft (5 min) e.

IB-FZ 9 Btu /ft (0 min) f.

IB-FZ 4,487 Btu /ft (4 min) g.

IB-FZ 0 Btu /ft (0 min)

The combustibles in this zone are negligible.

It is reasonable to assume that the fire brigade can reach the zone prior to cable fire propagating through an unsealed penetration due to the slow burning nature of a cable fire.

i l

r 1.3-46 i

Construction features of the zone boundaries, the fire detection system, which alarms in the control room, the limited number of unsealed penetrations, and the combustible loadings on either side of the boundaries provides reasonable assurance that a fire will not propagate from one eide of the boundary to the other.

6.

IB-FZ El. 322' Zone boundaries consist of reinforced concrete walls, floor and ceiling. The north, south, and east boundaries are three hour rated fire barriers. The west boundary is not adjacent to any other plant area.

The floor is adjacent to fire zones IB-FZ-1, IB-FZ-2, IB-FZ-3, and IB-FZ-5.

(Ref. ATT.A. SH.83 for penetration details.) The ceiling is adjacent to fire zone IB-FZ-7.

(Ref.

ATT.A. SH.84 for penetration details.) Combustible loadings on either side of each nonfire rated zone boundary are as follows:

a.

IB-FZ 4,487 Btu /ft2 (4 min) b.

IB-FZ 8,925 Btu /ft (7 min) c.

IB-FZ 10,199 Btu /ft (8 min) d.

IB-FZ 5,659 Btu /ft (5 min) e.

IB-FZ 549 Btu /ft (1 min) f.

IB-FZ 2,650 Btu /ft2 (2 min) 1.3-47

The principal combustible in this zone is cable insulation.

Should ignition of cable occur either electrically or due to transient combustibles, exposed cable in tray penetrations sealed with grout will preclude a slow burning cable fire from propa-gating through the zone boundary, although the seals are not fire rated.

Construction features of the zone boundaries, the limited number of renetrations, and the combustible loadings on either side of the boundaries provides reasonable assurance that a fire will not propagate from one side of the boundary to the other.

7.

IB-FZ E1. 355' Zone boundaries consist of reinforced concrete walls, floor and ceiling.

The south and east boundaries are three hour rated fire barriers.

The north and west boundaries and the ceiling are not adjacent to any other plant area.

The floor is adjacent to fire zone IB-FZ-6.

(Ref. ATT.A. SH.85, 86 and 87 for penetration details.)

Combustible loadings on either side of each nonfire rated zone boundary are as follows:

IB-FZ 2,650 Btu /ft (2 min) a.

b.

IF-BZ 4,487 Btu /ft (4 min) 1.3-48

The principal combustible in this zone is cable insulation.

Should ignition of cable occur either electrically or due to transient combustibles, exposed cable in tray penetrations sealed with grout will preclude a slow burning cable fire from propa-gating through the zone boundary, although the seals are not fire rated.

It is reasonable to assume that tue fire brigade can reach the zone prior to a fire propagating through an unsealed pene-tration.

Construction features of the zone boundaries and the combustible loadings on either side of the boundaries provides reasonable assurance that a fire vill not propagate from one side of the boundary to the other.

8.

IB-FZ Alligator-Pit - El. 279' - 0" Zone boundaries consist of reinforced concrete walls, floor and l

l ceiling. Walls adjacent to the Reactor Building and Fuel Handling Building and ceiling adjacent to the Turbine Building are three hour rated fire barriers.

The floor is not adjacent to any other plant area.

The remainder of the ceiling is adjacent to fire zones IB-FZ-1, IB-FZ-2, IB-FZ-3 and IB-FZ-4.

(Ref. ATT.A. SH.88 for penetration details.) The northwest boundary of this zone consists of a concrete wall which divides the Alligator Pit.

The i

1 1.3-49

area on the opposite side. of this boundary is not analyzed.ss it is essentially empty.

Combustible loadings on either side of each nonfire rated zone boundary are as follows:

a.

IB-FZ 0 Btu /ft (0 min) b.

IB-FZ 8,925 Btu /ft (7 min) c.

IB-FZ 10,199 Btu /ft (8 min) d.

IB-FZ 5,659 Btu /ft (5 min) e.

IB-FZ 9 Btu /ft (0 min)

The combustibles in this zone are negligible.

Construction features of the zone boundaries and the combustible loadings on either side of the boundaries provides reasonable assurance that a fire will not propagate from one side of the boundary to the other.

  • The above discussion which describes the features which are used to delineate the zone boundaries of the Intermediate Building adequately demonstrates the capability for the limiting of fire within the boundaries of each zone. As such, this legitimizes the TMI-l plant fire hazards analysis concept to evaluate each zone by itself. We therefore maintain that the safety evaluation in Section 3.0 which identifies noncompliances with Section III G of Appendix R to 10CFR50 based upon this concept is valid.

1.3-50 L

F' III Intake Screen and Pump House The Intake Screen and Pump House excluding the Diesel Fire Pump Room is classified as one fire area which has been subdivided into 3 zones for the purpose of analysis.

Each fire zone is treated independently and analyzed as a fire area due to the construction features of its bound-aries and/or existing and proposed active fire detection and suppression systems installed on either or both sides of the zone boundary.

The following is a brief description of the zone boundaries for each zone, the zone's active fire protection features, and the combustible loadings on either side of the nonfire rated zone boundaries.

1.

ISPH-FZ 1R SWGR Area - El. 308' Zone boundaries consist of reinforced concrete walls, floor and ceiling.

The north boundary will be upgraded to a three hour rated fire barrier with the exception of the bus doct internals.

The east and south boundaries, and the ceiling are not adjacent to any other plant areas. The floor is adjacent to the intake pit, which has no combustible loading and is not analyzed.

(Ref.

ATT.A. SH.89 and 90 for penetration details.) The west boundary is adjacent to fire zone ISPH-FZ-3.

Doorways are provided with "A" labelled doors.

(Ref. ATT. A. SH.91 for penetration details. )

Automatic wet pipe sprinklers are provided on both sides of the 1.3-51

boundary and a fire detection system which alarms in control room will be installed for this zone. Combustible loadings on either side of the non fire rated boundary are as follows:

a.

ISPH-FZ 15,854 Btu /ft (12 min) b.

ISPH-FZ 344 Btu /ft ( l min)

The principal combustible in this zone is cable insulation.

Should ignition of cable occur either electrically or due to transient combustibles, exposed cable in tray penetrations sealed with grout will preclude a slow burning cable fire from pro-pagating through the zone boundary, although the seals are not fire rated.

The construction features of the zone boundaries coupled with fixed suppression on both sides of the boundary, the fire detec-tion system, which will alarm in the control room, the limited number of penetrations, and the combustible loadings on either side of the boundary provides reasonable assurance that a fire will not propagate from one side of the boundary to the other.

2.

ISPH-FZ IT SWGR Area - El. 308' Zone boundaries consist of reinforced concrete walls, floor and ceiling.

The north boundary is a three hour fire rated barrier 1.3-52

where adjacent to ISPH-FA-2; the remainder is not adjacent to any other plant area. The south boundary will be upgraded to a three hour rated fire barrier with the exception of the bus duct inter-val.

The east boundary and the ceiling are not adjacent to any other plant areas.

The floor is adjacent to the intake pit, which has no combustible loading and is not analyzed.

(Re f. ATT. A.

SH.92 and 93 for penetration details.) The west boundary is ad-t i

jacent to fire zone ISPH-FZ-3 with two open passageways.

(Ref.

l ATT.A. SH.94 and 95 for penetration details.) Automatic wet pipe l

sprinklers are provided on both sides of the boundary and a fire detection system which alarms in the control room will be in-stalled in this zone. Combustible loadings on either side of the nonfire rated boundary are as follows:

a.

ISPH-FZ 16,020 Btu /ft (12 min) b.

ISPH-FZ 344 Btu /ft ( l min)

I The principal combustible in this zone is cable insulation.

Should ignition of cable occur either electrically or due to transient combustibles, exposed cable in tray penetrations sealed with grout or koawool will preclude a slow burning cable fire from propagating through the zone buundary, although the seals are not fire rated.

The construction features of the zone boundary coupled with fixed l

suppression on both sides of the boundary, the fire detection l

l l

1.3-53 I

l system, which will alarm in the control room, the limited number of penetrations, and the combustible loadings on either side of the boundary provide reasonable assurance that a fire will not propagate from one side of the boundary to the other.

3.

ISPH-FZ Trash Rake and Screen Area - El. 308' Zone boundaries consist of reinforced concrete walls, floor and ceiling.

The north boundary is a three hour rated fire barrier where adjacent to ISPH-FA-2; the remainder is not adjacent to any other plant area.

The south and west boundaries'and the ceiling i

{

are not adjacent to any other plant area. The floor is adjacent to the intake pit, which has no combustible loading and is not analyzed. The east boundary is adjacent to fire zones ISPH-FZ-1 and ISPH-FZ-2 with "A" labelled doors provided where adjacent to fire zone ISPH-FZ-1.

(Re f. ATT. A. SH.96 for penetration details.) Automatic wet pipe sprinklers are provided on both sides of each boundary. Combustible loadings on either side of the nonfire rate boundaries are as follows:

l a.

ISPH-FZ 344 Btu /ft ( l min)

I b.

ISPH-FZ 15,854 Btu /ft2 (12 min) c.

ISPH-FZ 16,020 Btu /ft (12 min)

The combustibles in this zone are negligible.

Should ignition of cable occur either electrically or due to transient combustibles, 1.3-54

exposed cable in tray penetrations sealed with grout or koawool will preclude a slow burning cable fire from propagating through the zone boundary, although the seal is not fire rated.

a The construction features of the zone boundary coupled with fixed suppression on both sides of the boundaries, a limited number of penetrations, and the combustible loadings on either side of the boundaries provide reasonable assurance that a fire will not propagate from one side of the boundary to the other.

  • The above discussion which describes the featur'es both passive and active to delineate the zone boundaries of the Intake Screen and Pump House adequately demonstrates the capability for the limiting of fire within the boundaries of each zone. As such, this legiti-mizes the TMI-1 plant fire hazards analysis concept to evaluate each zone by itself. We therefore maintain that the safety evaluation in Section 3.0 which identifies noncompliances with Section III G of Appendix R to 10CFR50 based upon this concept to be valid.

IV Reactor Building As with areas outside the Reactor Building, the updated fire hazards analysis for the TMI-l Reactor Building, which was submitted with the 1.3-55

l Appendix R Section III G Safe Shutdown Evaluation, utilized an identical delineation of fire zcnes as had initially been previously utilized under license Amendment 44 in analyzing the effects a fire would have on the plant's capability to safely shutdown. The delineation of fire zones, however, was not established considering the location of all safety related components with respect to each other. For the purposes of analysis, the Reactor Building, which is one fire area, was sub-divided into fire zones taking into consideration the combustible loading in localized areas of the building.

It is not possible to subdivide this building solely on the basis of physical boundaries combined with fixed fire suppression system prevalent in other fire zones in the plant as discussed in the justification for areas other than the Reactor Building.

Nevertheless, we maintain that the current delineation of fire zones is based upon sound technical judgment and is legitimate.

It should be noted, however, that in identifying Appendix R Section III G non-compliances, the entire Reactor Building was considered one fire area.

As a result, the legitimization of fire zones for the purposes' of evaluating Appendix R noncompliances is not necessary. Any future modi-fications inside the Reactor Building will take this into considera-tion.

However, as stated previously, we prefer to leave the current delineation of fire zones as is since they do represent points of reference for localized combustible loadings in the building.

For the purpose of requesting specific exemptions from Appendix R Section IIIG l.3-56 1

the current delineation of fire zones is also important since Section 1.2.la of this report has requested an exemption from a requirement to install radiant energy heat shields between Reactor Building Emergency Cooling Units AH-E-1A,1B and 1C in f Ire zone RB-FZ-la.

Considering the combustible loadings in each fire zone adjacent to fire zone RB-FZ-la, we maintain that the exemption request based upon evaluating RB-FZ-la by itself in this instance is valid.

1.

Zones RB-FZ-la, RB-FZ-lb and RB-FZ-1c - Elevation 281' 2.

Zones RB-FZ-Id and FB-FZ-le - D-Rings 3.

Zone RB-FZ Elevation 308' 4.

Zone RB-FZ Elevation 346' To conclude, the Reactor Building was treated as one fire area for the purpose of evaluating Appendix R noncompliances.

Noncompliances were not identified by evaluating each individual fire zone by itself with the exception of the Reactor Building Emergency Cooling units in Zone RB-FZ-la.

Note that modifications to eliminate Appendix R, Section IIIG noncompliances will remain listed on a zone by zone bases and the Fire l

Hazards Analysis will remain as is using the current delineation of fire zones. We therefore maintain that the safety evaluation conducted for 1

the Reactor Building which identifies noncompliance with Section IIIG of l

Appendix R to 10CFR50 considering the Reactor Building as one fire area is acceptable.

1.3-57

ATTACHMENT A Sh. 1 BUILDING. Auxiliary Building FIRE ZRNE AB-FZ-1 ELEVATION -

271'-0" ORIENTATION - East Wall CONSTRUCTION - Reinforced Concrete THICKNESS -

5'-0" REFERENCE DRAWINGS E-422-013 PENETRABONS (PAGE 1 OF 1)

PENETRATING PENETRATION PENETRATING PENETRATION SERVICE DIMENSIONS SERVICE SEALANT NOTES DIMENSIONS (IF ANY)

Sema as AB-FZ-5 See AB-FZ-5 for Penetration details of this wall

ATTACHMENT A Sh. lA BUILDING. Auxiliary Building FIRE ZONE. AB-FZ-1 ELEVATION.

271'-0" ORIENTATION. North Wall CONSTRUCTION. Reinforced Concrete THICKNESS -

3'-0" REFERENCE DRAWINGS N/A PENETRATIONS (PAGE OF 1) 1 PENETRATING PENETRATION PENETRATING PENETRATION SERVICE DIMENSIONS SERVICE SEALANT NOTES DIMENSIONS (IF ANY)

Hallway Opening 8" x 8" NONE w

ATTACHMENT A Sh. 2 BUILDING - Auxiliary Building FIRE ZONE-AB-FZ-2A ELEVATION -

281'-0" ORIENTATION - West Wall CONSTRUCTION - Concrete Block THICKNESS -

2'-0" REFERENCE DRAWINGS E-422-007 PENETRATIONS (PAGE 1 OF 1 )

PENETRATING PENETRATION PENETRATING PENETRATION SERVICE DIMENSIONS SERVICE SEALANT NOTES DIMENSIONS (IF ANY)

Electrical 3/4" $

Same Grouted Conduit l

Electrical Tray 10" x l'-10" 18" Tray Sealed /Kaowool (2) i Door 3'-0" x 8'-0" Same Not Labeled Electrical 2-1/2" $

Same Grouted Conduit l

t

ATTACHMENT A Sh. 3 BUILDING. Auxiliary Building FIRE ZONE. AB-FZ-2B ELEVATION.

281'-0" ORIENTATION. West Wall CONSTRUCTION. Concrete Block THICKNESS.

2'-0" REFE'tENCE DRAWINGS E-422-007 PENETRATIONS (PAGE 1 OF 1)

PENETRATING PENETRATION PENETRATING PENETRATION SERVICE DIMENSIONS SERVICE SEALANT NOTES DIMENSIONS (IF ANY)

Electrical 3/4" $

Same Grouted Conduit Electrical 2" &

Same Grouted Conduit Electrical 3" &

Same Grouted Conduit Door 3'-0" x 8'-0" Same Not Labeled Blockout 10" x 2'-2" None Filled with

- No Penetrating Service Grout l

l 1

l 1

l ATTACHMENT A Sh. 4 BUILDING Auxiliary Building FIRE ZONE. AB-FZ-2C ELEVATION -

281'-0" ORIENTATION.

West Wall CHNSTRUCTION-Concrete Block THICKNESS -

2'-0" REFERENCE DRAWINGS E-422-007 PENETRATIONS (PAGE 1 OF 1)

PENETRATING PENETRATION PENETRATING PENETRATION SERVICE DIMENSIONS SERVICE SEALANT NOTES DIMENSIONS (IFANY)

Electrical Tray 10" x l'-0" 18" Tray Sealed /Kaowool Door 3'-0" x 8'-0" Same Not Labeled Electrical 3/4" & (6)

Same Grouted

' Conduit Electrical 1-1/2" $

Same Grouted Conduit Electrical 2-1/2" $

Same Grouted Conduit Electrical 3" $

Same:

Crouted Conduit i

l l

l l

l l

ATTACHMENT A Sh. 5 BUILDING. Auxillcry Building FIRE ZSNE. AB-FZ-3 ELEVATION.

281'-0" ORIENTATION.

South Wall CONSTRUCTION. Reinforced Concrete THICKNESS.

3'-0" REFERENCE DRAWINGS E-422-008 PENETRATf0NS (PAGE 1 OF 1)

PENETRATING PENETRATION PENETRATING PENETRATION SERVICE DIMENSIONS SERVICE SEALANT NOTES DIMENSIONS (IF ANY)

Piping Blockout 2'-0" x 2'-0" Unknown Unknown NOTE:

Survey team could Not field verify the penetrating services through this Wall because of radiation levels.

Piping Blockout 2'-0" x 2'-6" Unknown Unknown HVAC Blockout l'-7" x 2'-0" Unknown Unknown Core Drilled 6" $ (2)

Unknown Unknown l

l l

l l

ATTACHMENT A Sh. 6 BUILDING. Auxiliary Building FIRE ZONE. AB-FZ-3 ELEVATION.

281'-0" ORIENTATION.

East Wall CONSTRUCTION. Reinforced Concrete THICKNESS.

S'-0" REFERENCE DRAWINGS E-422-012 PENETRATIONS (PAGE 1 OF 2)

PENETRATING PENETRATION PENETRATING PENETRATION SERVICE DIMENSIONS SERVICE SEALANT NOTES DIMENSIONS (IF ANY)

Elsetrical Tray 10" x l'-10" 18" Tray Grouted

& Conduit 3/4" $ Conduit (2)

Electrical Tray 10" x l'-0" 6" Tray Grouted

& Conduit 1-3/4" $

Conduit Electrical Tray 10" x l'-10" 18" Tray Grouted i Blockout l'-6" x l'-10" None Grouted Piping 4" $

2-1/2" $

Kaowool Pipe 1-1/2" $

Same Embedded Sleeve 6" $

None Grouted Electrical 6" $

3/4" & Conduit Conduit &

1/2" $ Tube Tubing

(' Sleeve 4" &

None Grouted Pipe 4" 4 (3) 1" &

Crouted Electrical Tray 10" x 10" 6" Tray Grouted &

Kaowool Electrical Tray 10" x 2'-2" 6" Tray (2)

Crouted &

Kaowool Pipe &

l'-6" x 2'-10" 1/2" $ Conduit Electrical (3)

Conduit 1" $ Pipe Grouted 2" $ Pipe 4" 4 Pipe Blockout l'-6" x 2'-10" None Grouted

A Sh. 7 BUILDING. Auxiliary Building FIRE ZENE. AB-FZ-3 ELEVATION. 281'-0" ORIENTATION.

East Wall CONSTRUCTION. Reinforced Concrete THICKNESS.

S'-0" REFERENCE DRAWINGS E-422-012 PENETRATIONS (PAGE 2 OF 2)

PENETRATING PENETRATION PENETRATING PENETRATION SERVICE DIMENSIONS SERVICE SEALANT NOTES DIMENSIONS (IF ANY)

Pipa l'-6: x 2'-10" 1"$ (Cutoff)

Crouted 4" $

Electrical Tray 10" x 2'-10" 30" Tray Grouted Electrical Tray 10" x 10 6" Tray Kaowool Blockout 10" x 10" None Kaowool HVAC Duct l'-7" x 2'-10" l'-3" x 2'-6" Crouted l

l

ATTACHMENT A Sh. 8 BUILDING Auxilicry Building FIRE ZENE. AB-FZ-3 ELEVt. TION. 305'-0" ORIENTATION - Ceiling CONSTRUCTION - Reinforced Concrete THICKNESS.

3'-0" REFERENCE DRAWINGS E-422-018 PENETRATIONS (PAGE I OF 1)

PENETRATING PENETRATION PENETRATING PENETRATION SERVICE DIMENSIONS SERVICE SEALANT NOTES DIMENSIONS (IF ANY)

Sleeva 8"

Unknown Unknown Walk Down Te.tm could not verify Siceve 4"

Unknown Unknown Walk Down Team could not verify Siceves 6" (3)

Unknown Unknown Walk Down Team could not verify Blockout (Misc.

2'-6" x 2'-6" 6" $ (2)

Crouted

Services)

Sleeves l

3" $ Sleeve Grouted 2-1/2" $ Pipe Open 2-1/2" $ Pipe Sealed 1-1/2" $ Pipe Sealed 1/2" $ Conduit Embedded l

l l

1 i

i ATTACHMENT A Sh. 9 BUILDING Auxiliary Building FIRE ZTNE-AB-FZ-4 ELEVATION -

305'-0" ORIENTATION - Ceiling CO NSTRUCTION - Reinforced Concrete THICKNESS -

3'-0" REFERENCE DRAWINGS E-422-018 PENETRABONS (PAGE 1 OF 1)

PENETRATING PENETRATION PENETRATING PENETRATION SERVICE DIMENSIONS SERVICE SEALANT NOTES DIMENSIONS (IF ANY)

Electrical 10" x l'-6" 2-1/2" $

Open Conduit &

Conduit Tubing 3/8" $ tubing (2)

Blockout (Misc 10" x 2'-6" 8" $ Pipe w/

Open Services) insultion i

6" Tray 6" $ HVAC Duct Electrical 4" $

3" $

Open l Conduit l Pipe 12" $

8" $

Open l

l Electrical 3/4" $

Same Embedded HVAC Duct 22" &

Same Open 1

Electrical 1-1/2" $ (2) 3/4" $

Open Conduit Pipe 8" 4 (3) 1-1/2" $

Open Sleeves 4" $ (2)

None Open Pipe 4" $

1" $ (2)

Open Pipe 4" $

1-1/2" $

Open Grating with 8'-10" x 3/4" Conduit Open Conduit 4'-11" (4)

Penetrations

ATTACHMENT A Sh. 10 BUILDING. Auxiliary Building FIRE ZONE. AB-FZ-5 ELEVATION.

281'-0" ORIENTATION.

East Wsli CONSTRUCTION. Reinforced Concrete THICKNESS.

5'-0" & 2'-0" REFERENCE DRAWINGS

& Concrete Blockwall E-422-007 ADJ to AB-FZ-2a, 2b, & 2C E-422-012 1

PENETRATIONS (PAGE OF 2)

PENETRATING PENETRATION PENETRATING PENETRATION SERVICE DIMENSIONS SERVICE SEALANT NOTES DIMENSIONS (lF ANY)

Column Line N/A N/A N/A NOTE: The East Wall 6c to 7d from Column Line 6c to 7d has no separation between AB-FZ-4 and AB-FZ-5 Column Line See AB-FZ-2a, 2b, & 2c 7d to Between for penetration details 8c & 9a Same between Column Line 7d as the Follow-and between 8c & 9a ing Fire Zones:

AB-FZ-2a AB-FZ-2b AB-FZ-2c Column Line 9a to lla (ADJ to FH-FZ-1 Pipe l'-0" x 4'-0" 4" $

Crouted Pipe l'-0" x l'-6" 2-1/2" &

Crouted i

Electrical l'-6" x 3'-0" 3/4" $ Conduit Grouted Conduit &

(2)

Tubing 1/2" $ Tubes (2)

Pipe 6" $

l-1/2" $

Grouted Electrical 4" $

l-1/2" $

Kaowool Conduit Pipe l'-6" x 3'-0" 4" $

Grouted Blockout l'-6" x 3'-0" None Grouted Pipe 8" $

3" $

Crouted 1

1 l

ATTACHMENT A Sh. 11 SUILDING. Auxiliary Building FIRE ZONE. AB-FZ-5 ELEVATION.

281'-0" GRIENTATION.

East Wall CUNSTRUCTION. Reinforced Concrete THICKNESS.

5'-0" & 2'-0" REFERENCE DRAWINGS

& Concrete Blockwall E-422-007 ADJ to AB-FZ-2a, 2b, & 2C E-422-012 PENETRADONS (PAGE 2 OF 2)

PENETRATING PENETRATION PENETRATING PENETRATION SERVICE DIMENSIONS SERVICE SEALANT NOTES 1

DIMENSIONS (IF ANY)

Pips 2'-0" x 2'-6" 4" $

Crouted 3" $

l-1/2" $

Blockout l'-6" x 3'-0" None Grouted Electrical Tray l'-0" x 2'-5" 24" Tray Open Electrical Tray 10" x l'-10" 18" Tray Kaowool Sleeves 8" $ (4)

None Open Electrical Tray 10" x 2'-10" 24" Tray Kaowool Pipe 8" $

8" $ Pipe w/

Open insul.

Pipe 8" $

2-1/2" $

Open Pipe 8" $

1" $

Open Pipa 8" $ (3) 2" $

Open Electrical 8" $

3/4" $

Open Conduit Pipe 8" $

l-1/2" $

Open Pipe 8" $

2" $

Open Pipe 8" $

5" $

Open

ATTACHMENT A Sh. 12 BUILDING. Auxiliary Building FIRE ZONE. AB-FZ-5 ELEVATION. 281'-0" ORIENTATION. West Wall CONSTRUCTION. Reinforced Concrete THICKNESS.

S'-0" REFERENCE DRAWINGS E-422-013 PENETRATIONS (PAGE 1 OF 1)

_~

PENETRATING PENETRATION PENETRATING PENETRATION SERVICE DIMENSIONS SERVICE SEALANT NOTES DIMENSIONS (IF ANY)

Not Evaluated N/A N/A N/A The West Wall from (Column Line)

Column Line 10a to lla i

10s to lla was not evaluated since it is a 3 hr rated fire wall NOTE:

The West Wall north of Column Line 6c 1

is open to the pipe chase / tunnel Column Line 6e to 10a i

Blockout 2'-8" x 3'-6" None Concrete HVAC Duct 2'-7" x 3'-5" 2'-0" x 3'-0" Open Core Drill 6" $

None Grouted i

Electrica Tray l'-0" x 2'-10" 12" Trays (2)

Grouted

& Conduit 3" & Conduit 1-1/4" &

Conduit Blockout 2'-8" d 3'-6" None Concrete I

l l

i

ATTACHMENT A Sh. 13 BUILDING. Auxiliary Building FIRE ZTNE. AB-FZ-5 ELEVATION.

305'-0" ORIENTATION.

Ceiling CONSTRUCTION. Reinforced Concrete THICKNESS.

3'-0" REFERENCE DRAWINGS E-422-018 PENETRATIONS (PAGE 1 OF 1)

PENETRATING PENETRATION PENETRATING PENETRATION S12VICE DIMENSIONS SERVICE SEALANT NOTES DIMENSIONS (IF ANY)

See AB-FZ-7 for penetra-tion details of Ceiling of AB-FZ-5 that is adjacent to AB-FZ-7 (Floor)

See AB-FZ-6a for penetration details of Ceiling of AB-FZ-5 that is adjacent to AB-FZ-6a (Floor)

See AB-FZ-6 for penetra-tion details of ceiling of AB-FZ-5 that is adjacent to AB-FZ-6 (Floor)

See AB-FZ-8 for penetra-tion details of Ceiling i

of AB-FZ-5 that ic adjacent to AB-FZ-8 (Floor)

See AB-FZ-9 for penetra-tion details of Ceiling of AB-FZ-5 that is adjacent to AB-FZ-9

)

(Floor) j i

)

i l

1

ATTACmfENT A Sh. 14 BUILDING. Auxiliary Building FIRE ZDNE. AB-FZ-6 ELEVATION. 305'-0" ORIENTATION. North Wall CONSTRUCTION. Reinforced Concrete THICKNESS.

3'-0" REFERENCE DRAWINGS E-422-023 PENETRATIONS (PAGE 1 OF 1)

PENETRATING PENETRATION PENETRATING PENETRATION SERVICE DIMENSIONS SERVICE SEALANT NOTES DIMENSIONS (IF ANY)

Same as AB-FZ-7 See AB-FZ-7 for wall penetration details NOTE: A portion of the East section of the North Wall adjacent to the Reactor Building was not evaluated since it is a 3 hr rated fire wall NOTE:

East End of the North Wall is open to AB-FZ-7 therefore no seperation exists between AB-FZ-6 and AB-FZ-7 for a portion of the North Wall l

l l

l

l ATTACHMENT A Sh. 15 BUILDING. Auxiliary Building FIRE ZENE. AB-FZ-6 ELEVATION. 305' 0" ORIENTATION.

East Wall CONSTRUCTION - Reinforced Concrete THICKNESS.

3'-0" REFEf.ENCE DRAWINGS i

E-421-113 i

PENETRATIONS (PAGE 1 OF 2)

PENETRATING PENETRATION PENETRATING PENETRATION SERVICE DIMENSIONS SERVICE SEALANT NOTES DIMENSIONS (lF ANY)

I i

Blockout (Misc 4'-8" x 12'-4" 3'-6 x 3'-6" Services HVAC Duct 4'-0" x 5'-0" HVAC Duct 24" Tray 8" $ HVAC Duct 6" $ Pipe (2)

Open 3" $ Pipe (4) 2-1/2" $ Pipe (2) 1" $ Conduit (4) 1" $ Pipe (8) 2" Pipe Electrical Tray l'-0" x l'-1" 6" Tray Open Pipe 4" $

2" $

Open l HVAC Duct 10" x l'-2" 8" x 12" HVAC Open j

Duct l Blockout 6" x 2'-6" Unknown Open Penetrating Service l

could not be varified by Walk Down Team Pipe 8" $

4" $

Open l Tubing 8" $

1/2" $ Tube (3)

Open HVAC Duct 3'-11" x 4'-4" 3'-6" x 4'-0" Open l Pipe 4" $

1" $

Open Pipe 4" $

2" $

Open HVAC Duct 10" x l'-2" 8" x l'-0" Open

ATTACHMENT A Sh. 16 BUILDING. Auxiliary Building FIRE ZONE. AB-FZ-6 ELEVATION. 305'-0" ORIENTATION. East Wall CONSTRUCTION - Reinforced Concrete THICKNESS.

3'-0" REFERENCE DRAWINGS E-421-113 PENETRATIONS (PAGE 2 OF 2)

PENETRATING PENETRATION PENETRATING PENETRATION SERVICE DIMENSIONS SERVICE SEALANT NOTES DIMENSIONS (IF ANY)

HVAC Ducts 10" x l'-2" 8" x l'-0" Ope.n (2)

Pipes 8" $ (2) 2-1/2" $

Open Pips 4" $

l-1/2" $

Open Pipe 16" $

12" $

Open HVAC Duct l'-0" x l'-4" 8" x 12" Open Electrical 11" x l'-0" 2" &

Open Conduit 3/4" $ (3)

Blockout (HVAC l'-7" x 2'-9" 10" x 18" HVAC Open Duct & Pipes)

Duct 2" $ (3) 1-1/2" $ (2)

Electrical Tray 2'-0" x 2'-1"

' Trays (2)

Open

! & Conduit 3/4" $ (4)

Electrical Tray 2'-1" x 3'-0" 24" Trays (2)

Grouted

& Conduit 3/4" $ Conduit (4) l Blockout (Misc 9'-0" x 10'-0" 1" & Pipe Service) 2" & Pipe Open 3/4" $ Conduit (Vert.)

ATTACHMENT A Sh. 17 BUILDING Auxiliary Building FIRE ZONE - AB-FZ-6 ELEVATION -

305'-0" ORIENTATION - West Wall CCNSTRUCTION - Reinforced Concrete THICKNESS-3'-0" & 2'-0" REFERENCE DRAWINGS E-422-023 PENETRATIONS (PAGE 1 OF 2 )

PENETRADNG PENETRABON PENETRABNG PENETRADON SERVICE DIMENSIONS SERVICE SEALANT NOTES DIMENSIONS (IF ANY)

Not Evaluated N/A N/A N/A The wall between AB-FZ-6 (W211 Between

& 6a was not evaluated AB-FZ-6 & 6a) since at present (4/4/83) it does not exist.

Column Line 7d to lld Blockout 2'-6-1/2" x 3/4" $ Conduit (Misc Services) 8'-0" (3) 1" $ Conduit (2) 3/8" $ Tubes (2) 3/8" $ Braided Open Coil Wire 1-1/4" $

Conduit (3) 2" $ Conduit (2) 3" & Conduit (4) 3/4" $ Pipe 1-1/2" $ Pipe 2" & Pipe Pipe & Tube 8" $

4" $ Pipe Open 3/8" $ Tube Electrical 2" $ (8)

Same Embedded with Conduits Caps HVAC Duct 3'-4" x 4'-4" 3'-0" x 4'-0" Open (2)

Pipe l'-0" x 2'-6" 2" $ Pipe Open

ATTACHMENT A Sh. 18 BUILDING - Auxiliary Building FIRE ZUNE-AB-FZ-6 ELEVATION -

30' '-0" ORIENTATION - West Wall C' INSTRUCTION - Reinforced Concrete THICKNESS -

3'-0" & 2'-0" REFERENCE DRAWINGS E-422-023 PENETRATIONS (PAGE 2 OF 2 )

PENETRATING PENETRATION PENETRATING PENETRATION SERVICE DIMENSIONS SERVICE SEALANT NOTES DIMENSIONS (IF ANY)

Electrical l'-0" x 2'-6" 2-1/2" $ Pipe Conduit & Pipe 1-1/2" $ Pipe (2)

Open 3/4" & Conduit (2)

Pipe 6" $

l-1/2" $

Crouted Electrical 11" x l'-0" 3" $

Open Conduit 3/4" $

(4)

Blockout (Misc 9'-0" x 10'-0" 3/4" $ Conduit Services)

(3) 1" & Conduit (6) 1-1/2" & Conduit (4) 2" & Conduit (3)

Open 2-1/2" $ Conduit (3) 3" $ Conduit (5) l 2" & Conduit (3) l'-6" x 16" Box I

2" x 2" Raceway

ATTACHMENT A Sh. 19 BUILDING - Auxiliary Building FIRE ZZNE. AB-FZ-6 ELEVATION. 305'-0" ORIENTATION - Floor CPNSTRUCTION. Reinforced Concrete THICKNESS -

3e-0" REFERENCE DRAWINGS E-422-018 PENETRADONS (PAGE 10F 1)

PENETRATING PENETRATION I

PENETRATING PENETRATION SERVICE DIMENSIONS SERVICE SEALANT NOTES DIMENSIONS (IFANV)

Sans as AB-FZ-3 See Ceiling of AB-FZ-3 &

&4 (Cailing) 4 for penetration details of AB-FZ-6 (Floor)

AB-FZ-6 Floor Adjscent to AB-FZ-5 (Ceiling)

Pips 8" $

3" $

Open Pipe 6" $

l-1/2" $

Open Sleeve 8" $ (2)

Unknown Unknown Could not be field verified by Walk Down Sleeve 6" $

Unknown Unknown Team due to radiation level Blockout (Misc 2'-0" x 5'-0" 6" Trays (2)

Crouted Services) 1" $ Pipe l Blockout (Misc 2'-6" x 5'-6" 6" Tray l Services) 2'-0" Tray 30" Tray Grouted 3/4" & Conduit 1" $ Conduit 1-1/2" $ Conduit 2" $ Conduit 3" $ Conduit 1-1/2" $ Pipe 2" $ Pipe HVAC Duct 2'-5" x 3'-8" 2'-0" x 3'-6" Open

l ATTACHMENT A Sh. 20 BUILDING. Auxiliary Building FIRE Z?NE. AB-FZ-6a ELEVATION. 305'-O" ORIENTATION.

Nor:h Wall CC NSTRUCTION. Reinforced Concrete THICKNESS.

3'-O" REFERENCE DRAWINGS E-422-023 PENETRATIONS (PAGE 1 OF 1)

PENETRATING PENETRATION PENETRATING PENETRATION SERVICE DIMENSIONS SERVICE SEALANT NOTES DIMENSIONS (IF ANY)

Stma as AB-FZ-7 See AB-FZ-7 for wall penetration details

ATTACHMENT A Sh. 21 BUILDING. Auxiliary Building FIRE ZENE-AB-FZ-6a ELEVATION - 305'-0" ORIENTATION - South Wall CONSTRUCTION - Reinforced Concrete THICKNESS -

3'-0" REFERENCE DRAWINGS E-422-023 PENETRATIONS (PAGE 1 OF 1 )

PENETRATING PENETRATION PENETRATING PENETRATION SERVICE DIMENSIONS SERVICE SEALANT NOTES DIMENSIONS (IF ANY)

HVAC Ducc l'-2" x l'-4" 10" x 12" Open Electrical 11" x l'-0" 3/4" $ (3)

Open 1" $ (3)

Pipe 8" $

4" $

Open i

HVAC Duct 4'-1" x 4'-4" 3'-6" x 4'-0" Open HVAC Duct 4'-4" x 5'-7" 4'-0" x 4'-6" Open Doorway 4'-6" x 8'-6" 3/4" $ Conduit No Door (Misc Services)

(2) 1" $ Conduit (2) 1-1/2" &

Conduit 2" $ Conduit (3) 3" $ Conduit 3/4" $ Pipe 2" $ Pipe 1" $ Pipe 1/4" & Tubes (8) 3/8" & Tubes (2)

ATTACHMENT A Sh. 22 SUILDING. Auxilicry Building FIRE ZZNE. AB-FZ-6a ELEVATION. 305'-0" ORIENTATION. West Wall CONSTRUCTION. Reinforced Concrete THICKNESS.

3'-0" REFERENCE DRAWINGS E-422-023 PENETRATIONS (PAGE 1 OF 1)

PENETRATING PENETRATION PENETRATING PENETRATION SERVICE DIMENSIONS SERVICE SEALANT NOTES DIMENSIONS (IF ANY)

HVAC Duct 5'-4" $

5'-0" $

Open Door win /(with 3'-0-1/2" x 13-1/2" x l'-6" Door (louvers Louvers) 8'-0" (2) open)

Plywood 3'-0-1/2" x 1" $ Conduit Blockout 3/8" l'-6" (7)

Thick (with 2" $ Conduit Misc Services)

(4) 3" $ Conduit (2)

Open 3-1/4" $ Conduit (4) 3/4" $ Pipe (2) 1" $ Rubber Hose (2)

Pipa 8" $

4" $

Sealed with Duct Tape Electrical 2" $

1" $

Open Conduit Sleeves 2" $ (2)

None Crouted Blockout l'-0" x l'-10" None Open Electrical 3/4" $

3/4" $

Embedded Conduit HVAC Duct l'-2" x l'-4" 10" x 12" Sealed with Duct Tape J

e ATTACHMENT A Sh. 23 BUILDING. Auxiliary Building FIRE ZTNE. AB-FZ-6a ELEVATION.

305'-0" ORIENTATION.

Floor CONSTRUCTION. Reinforced Concrete THICKNESS.

3'-0" REFERENCE DRAWINGS E-422-018 PENETRATIONS (PAGE 1 OF 1)

PENETRATING PENETRATION PENETRATING PENETRATION SERVICE DIMENSIONS SERVICE SEALANT NOTES DIMENSIONS (IF ANY)

Pipe 2" $

Same Embedded Tubing 4" $

3/4" $ (4)

Open Blockout l'-6" x 6'-0" Same Grouted Pipa 2" $

None Embedded Pipe 3" $

1" $

Open Tubing 6" $

5/8" $ (3)

Open 1/4" $ (8)

Electrical 2" (3)

Same Embedded Conduit Electrical 1" (2)

Same Embedded Conduit

ATTACHMENT A Sh. 24 BUILDING. Auxilicry Building FIRE ZONE - AB-FZ-7 ELEVATION.

305'-0" ORIENTATION -

West. Wall C#NSTRUCTION - Reinforced Concrete THICKNESS.

3'-0" REFERENCE DRAWINGS E-422-023 PENETRATIONS (PAGE 1 OF 1)

PENETRATING PENETRATION PENETRATING PENETRATION SERVICE DIMENSIONS SERVICE SEALANT NOTES l

DIMENSIONS (IF ANY)

HVAC Duct 2'-4" x 2'-4" 2'-0" x 2'-0" Open (with Louver)

Electrical 2'-0" x 2'-1" 3" $ (3)

Open Conduit 1" $ (2) 1-1/2" $

HVAC Ducts 2'-4" x 4'-4" 2'-0" x 4'-0" Open (2) i i

l l

l l

l i

I

\\

ATTACIDfENT A Sh. 25 BUILDING. Auxiliary Building FIRE ZONE. AB-FZ-7 ELEVATION.

305'-0" ORIENTATION. South Wall CTNSTRUCTION. Reinforced Concrete THICKNESS.

3'-0" REFERENCE DRAWINGS E-422-023 PENETRATIONS (PAGE 1 OF 1 )

PENETRATING PENETRATION PENETRATING PENETRATION SERVICE DIMENSIONS SERVICE SEALANT NOTES DIMENSIONS (IF ANY)

Blockout (HVAC 4'-4" x 6'-

4" $ HVAC Duct Open Duct & Conduit) 1-1/2" 3/4" $ Conduit 1

(2)

Electrical 1" $

Same Embedded Conduit Electrical 2" $

1" $

Open HVAC Duct l'-7" x 4'-4" 15" x 4'-0" Open Electrical Tray 11" x 2'-0" 18" Tray Kaowool Pipa 18" $

10" $

Open Pipe 8" $

4" $

Open Electrical Tray 11" x l'-6" 12" Tray Kaowool Electrical Tray 11" x l'-0" 6" Tray Open Pipe 12" $

8" $

Open Electrical Tray 11" x l'-0" 6" Tray Kaowool Electrical 11" x l'-0" 2" $ (2)

NOTE:

AB-FZ-7 is open 1-1/2" $ (4)

Open to AB-FZ-6 at East End 1" $ (2) of South Wall

ATTACHMENT A Sh. 26 BUILDING Auxiliary Building FIRE Z"NE - AB-FZ-7 ELEVATION - 305'-0" ORIENTATION - Floor C' NSTRUCTION - Reinforced Concrete THICKNESS -

3'-0" REFERENCE DRAWINGS E-422-018 PENETRATIONS (PAGE 1 OF 1 )

PENETRATING PENETRATION PENETRATING PENETRATION SERVICE DIMENSIONS SERVICE SEALANT NOTES DIMENSIONS (IF ANY)

Pipa 12" $

8" $

Open Pipa 16" $

12" $

Open Pipa 24" $

16" $

Open Blockout 10" x 3'-6" 2" 4 Pipe Grouted (Hisc Services) 12" Tray 6" Tray 1" $ Conduit (2)

Pipe 2" $

Same Embedded Pipe 20" $

16" $

Open Pipe 4" $

1" $

Open Pipe 20" $

16" $

Open Pipa 1-1/2" $

Same Embedded Pipe 20" 4 (2) 16" $

Open Pipe 4" $

1" $

Open Pipe 6" $

4" $

Open Pipe 1-1/2" $ (3)

Same Embedded Pipe 8" $ (2) 3" $ (2)

Open Pipe 6" $

2" $

Open Pipe 2" $

Same Embedded

ATTACHMENT A Sh. 27 BU'LDING Auxiliary Building FIRE ZONE. AB-FZ-8 ELEVATION. 305'-0" ORIENTATION. North Wall CONSTP.UCTION. Reinforced Concrete THICKNESS.

3'-0" REFERENCE DRAWINGS E-422-023 PENETRADONS (PAGE 1 OF 1)

PENETRATING PENETRATION PENETRATING PENETRATION SERVICE DIMENSIONS SERVICE SEALANT NOTES DIMENSIONS (IF ANY)

Slesva 4" $

None Capped Pipas 4" $ (3) 2" $ (3)

Crout Pipe 6" $

1" $

Crout Electrical 2" &

Same Embedded Conduit Capped Pipe & Tubing l'-0" x 2'-0" 2" & Pipe Grout 1/4" $ Tubes (3)

ATTACHMENT A Sh. 28 BUILDING. Auxiliary Building FIRE Z@NE. AB-FZ-8 ELEVATION.

305'-0" ORIENTATION. South Wall CONSTRUCTION. Reinforced Concrete THICKNESS-3'-0" REFERENCE DRAWINGS E-422-024 PENETRADONS (PAGE 1 OF 1)

PENETRATING PENETRATION PENETRATING PENETRATION SERVICE DIMENSIONS SERVICE SEALANT NOTES DIMENSIONS (IF ANY)

HVAC Duct l'-10" x l'-6" x l'-6" Open l'-10" (2) l l

l I

l l

l

r ATTACHMENT A Sh. 29 BUILDING. Auxiliary Building FIRE ZENE. AB-FZ-8 ELEVATION.

305'-0" ORIENTATION.

East Wall CONSTRUCTION. Reinforced Concrete THICKNESS.

3'-0" REFERENCE DRAWINGS E-422-0*1t PENETRATIONS (PAGE 1 OF 1)

PENETRATING PENETRATION PENETRATING PENETRATION SERVICE DIMENSIONS SERVICE SEALANT NOTES DIMENSIONS (IF ANY)

Doorw:y 2'-6" x 8'-0" l-1/4" $

Open Conduit 3/8" Tubes (9)

(No Door)

Electrical 1" $ (2)

Same Embedded Sleeves 4" $ (2)

None Plugged &

(Conduits)

Capped Both Sides HVAC Duct l'-10" x 2'-4" l'-6" x 2'-0" Open Sleeves 4" $ (2)

None No Plugs or

- East Side Could Not (Conduit)

Caps on West Be Confirmed By Walk Side of East Down Team Wall I

l

f ATTACIDfENT A Sh. 30 BUILDING. Auxiliary Building FIRE ZIINE. AB-FZ-8 ELEVATION. 305'-0" ORIENTATION. West Wall CONSTRUCTION - Reinforced Concrete THICKNESS -

3'-0" REFERENCE DRAWINGS N/A PENETRATIONS (PAGE 1 OF 1 )

PENETRATING PENETRATION PENETRATING PENETRATION SERVICE DIMENSIONS SERVICE SEALANT NOTES DIMENSIONS (IF ANY)

None N/A N/A N/A There are no penetrating services through the West Wall of AB-FZ-8 l

ATTACHMENT A Sh. 31 BUILDING - Auxiliary Building FIRE ZONE-AB-FZ-8 ELEVATION -

305'-0" ORIENTATION - Floor CONSTRUCTION - Reinforced Concrete THICKNESS -

3'-0" REFERENCE DRAWINGS E-422-018 PENETRATIONS (PAGE 1 OF 1)

PENETRATING PENETRATION PENETRATING PENETRATION SERVICE DIMENSIONS SERVICE SEALANT NOTES DIMENSIONS (IF ANY)

Pipe 4" $ (3) 1" $

Open I

i l

l l

l l

ATTACHMENT A Sh. 32 BUILDING - Auxiliary Building FIRE Z1tNE-AB-FZ-9 ELEVATION - 305'-0" ORIENTATION - North Wall CENSTRUCTION - Reinforced Concrete THICKNESS -

5'-0" & 3'-0" REFERENCE DRAWINGS N/A PENETRATIONS (PAGE 1 OF 1)

PENETRATING PENETRATIOF PENETRATING PENETRATION

/

SERVICE DIMENSION ~

SERVICE SEALANT NOTES DIMENSIONS (IF ANY)

Batwzen Column N/A N/A N/A The North Wall between Lina N & M Column Lines N & M was (Not Evaluated) not evaluated since it is exposed to the exterior Between Column The North Wall between Line M & L Column Lines M & L is Same as AB-FZ-7 the same as the South Wall of AB-FZ-7 see AB-FZ-7 South Wall for

anetrations Between Column See South Wall of Line L & K AB-FZ-6a for details of Same as penetrations through

- AB-FZ-6a the North Wall of

(

AB-FZ-9 for between Column Lines L & K

ATTACHMENT A Sh. 33 BUILDING - Auxiliary Building 1

FIRE ZENE-AB-FZ-9 ELEVATION -

305'-0" ORIENTATION -

East Wall CNSTRUCTION - Reinforced Concrete THICKNESS -

5'_g" REFERENCE DRAWINGS N/A PENETRATIONS (PAGE 1 OF 1)

PENETRATING PENETRATION PENETRATING PENETRATION SERVICE DIMENSIONS SERVICE SEALANT NOTES DIMENSIONS (IF ANY)

North of Column N/A N/A N/A The East Wall North of Line 6c Not Column Line 6c was not Evaluated evaluated since it is exposed to the exterior Between Column See AB-FZ-7 (West Wall)

Lines 6c & 6d for details of penetra-Same as AB-FZ-7 tions of East Wall between Column Lines 6c and 6d Between Column See AB-FZ-6a (West Wall)

Lines 6d & 7d for details of penetra-Same as tions of East Wall AB-FZ-6a between Column Lines 6d and 7d Between Column See AB-FZ-6 (West Wall)

Lines 7d and for details of penetra-11a Same as tions of East Wall AB-FZ-6 between Column Lines 7d and lla

ATTACHMENT A Sh. 34 BUILDING - Auxiliary Building FIRE ZONE - AB-FZ-9 ELEVATION -

305'-0" ORIENTATION - Floor CONSTRUCTION - Reinforced Concrete THICKNESS -

3'-0" REFERENCE DRAWINGS E-422-018 PENETRATIONS (PAGE 1 OF 2 )

PENETRATING PENETRATION PENETRATING PENETRATION SERVICE DIMENSIONS SERVICE SEALANT NOTES DIMENSIONS (lF ANY)

Electrical Tray 10" x l'-4" 12" Tray Grouted Electrical Tray 10" x 10" 6" Tray Grouted Pips.

8".4 (2) 4" $

Open Blockout (Misc 6'-0" x 6'-0" 3/8" $ Tube 1/4" Cover

- Penetrations through Service)

(2)

Plate Cover Plate are not 2'-0" $ HVAC sealed Duct Pipe 2" $

Same Embedded Blockout (Misc 2'-0" x 2'-0" 3/8" $ Tubes Open Services)

(7) 1-1/2" & Pipe 1/2" & Conduit Pipe 4" $ (2) 1" $

Open Pipe 6" $

2" $

Open l Pipe l'-6" x 2'-0" 4" $

Open l

l Sleeve 4" $

Unknown Unknown No Accessability Due to Radiation Level - Walk Sleeve 6" $

Unknown Unknown Down Team Could Not Vecify Blockout l'-0" x 2'-0" Unknown Unknown

Sleeves 8" $ (2)

Unknown Unknown HVAC Duct 2'-S" x 2'-8" 2'-0" x 3'-6" Open Pipe 3" $

2" $

Open

- (In Hatch Cover)

Pipe 8" $

2-1/2" $

Open

ATTACHMENT A Sh. 35 BUILDING - Auxiliary Building FIRE ZANE-AB-FZ-9 ELEVATION - 305'-0" ORIENTATION - Floor CGNSTRUCTION - Reinforced Concrete THICKNESS -

3'-0" REFERENCE DRAWINGS E-422-018 PENETRATIONS (PAGE 2 OF 2 )

PENETRATING PENETRATION PENETRATING PENETRATION SERVICE DIMENSIONS SERVICE SEALANT NOTES DIMENSIONS (IFANY)

Pipe 6" $

l-1/2" $

Open Pipe & Tubes 6" $

1" $ Pipe (2)

Open 5/8" $ Tubes (3) 1//" $ Tubes (8)

Electrical Tray l'-0" x l'-6" 12" Tray Grouted Blockout l'-0" x l'-6" 1" $

Open (Conduit) 1-1/2" $ (3) 3" $ (4)

HVAC Duct 4'-1" x 4'-2" 3'-9" x 3'-9" Open Pipe l'-6" x 2t-0" 4" $

Open Pipe 4" $ (2) 1" $

Open Pipe 6" $

2" $

Open

' Blockout (Misc 2'-0" x 2'-0" 3/8" $ Tubes Open Services)

(7) 1/2" & Conduit 1-1/2" $ Pipe

' Unknown Sleeves 8" $ (2)

None Covered with Plastic Radiaticn Blanket

ATTACHMENT A Sh. 36 BUILDING - Funl H:ndling Building FIRE ZE NE-FH-FZ-1 ELEVATION.

271'-0" & 281'-0" ORIENTATIGN - West Wall CONSTRUCTION - Reinforced Concrete THICKNESS-5'-0" REFERENCE DRAWINGS E-422-012 PENETRATIONS (PAGE 1 OF 1)

PENETRATING PENETRATION PENETRATING PENETRATION SERVICE DIMENSIONS SERVICE SEALANT NOTES DIMENSIONS (IF ANY)

Some as the See AB-FZ-3 & AB-FZ-5 Following Fire for details of services Zones:

penetrating this wall AB-FZ-3 AB-FZ-5 NOTE:

(There is no wall separating FH-FZ-1 and AB-FZ-4)

i ATTACHMENT A Sh. 37 BUILDING - Fuel Handling Building FIRE ZENE-FH-FZ-1 ELEVATION - 305'-0" ORIENTATION - Ceiling (Floor Elev.)

CRNSTRUCTION - Reinforced Concrete THICKNESS -

3'-0" REFERENCE DRAWINGS E-421-108 PENETRATIONS (PAGE 1 OF 2 )

PENETRATING PENETRATION PENETRATING PENETRATION SERVICE DIMENSIONS SERVICE SEALANT NOTES DIMENSIONS (IF ANY)

Pips 12" $ (4) 8" $

Open Pipe 6" $ (2) 2-1/2" $

Open HVAC Duct l'-4" x l'-5" 12" x 12" Open Blockout l'-2" x l'-2" Same Sealed Pipe 16" $

12" $

Open HVAC Duct 2'-4" x 4'-4" 2'-0" x 4'-0" Open Blockouts l'-2" x l'-2" Same Sealed (2)

Pipe 8" $ (2) 4" $

Open Electrical Tray 10" x 5'-0" 3/4" & Conduit Grouted

& Conduit 2'-0" Tray (2) 1" $ Conduit (5) 2" $ Conduit Electrical Tray 10" x l'-4" 1" $ Conduit Grouted

& Conduit 12" Tray Pipe 14" $ (2) 12" $ w/ insul Open Sleeves 8" & (2)

Same Capped Cover Plate Cable l'-0" x 2'-6" 25% Cable Fill Kaowool (2)

Cable l'-0" x 2'-6" 50% Cable Fill Kaowool (2)

Cable l'-0" x l'-6" 50% Cable Fill Kaowool

ATTACHMENT A Sh. 38 SUILDING - Fuel Handling Building FIRE ZONE-FH-FZ-1 ELEVATION - 305'-0" ORIENTATION - Ceiling (Floor Elev.)

CONSTRUCTION - Reinforced Concrete THICKNESS -

3'-0" REFERENCE DRAWINGS E-421-108 PENETRATIONS (PAGE 2 OF 2 )

PENETRATING PENETRATION PENETRATING PENETRATION SERVICE DIMENSIONS SERVICE SEALANT NOTES DIMENSIONS (IF ANY)

Elevator Shaft 13'-8" x 9'-2" Same Elevator Doors

- Elevator Door Fire Sealed Rating Not Confirmed Ventilating 18'-0" x 19'-0" 5'-8" x 2'-0" Open

- Chase Above Elevations Chese w/ Misc Duct Sealed with Sheet Services 5'-0" x 4'-2" Metal Duct 3'-6" x l'-8" Duct 3/4" & Conduit (4) 1" & Conduit (7) 4" $ Pipe 2" $ Conduit 4" $ Conduit 6" Tray 1" $ Pipes (3) 2" & Pipe 3/4" $ Conduit (2) 2-1/2" &

Conduit (2) 1/2" $ Pipe 2-1/2" & Pipe (2) 1-1/2" $

Conduit 2" & Condui-P1000 Unistruts (8) 1-1/2" x 1-1/2" Angles (2)

\\

ATTACHMENT A Sh. 39 BUILDING - Fusi Hindling Building FIRE ZENE-FH-FZ-2 ELEVATION - 305'-0" - 331'-0" ORIENTATION - West Well CONSTRUCTION - Reinforced Concrete THICKNESS -

5'-0" REFERENCE DRAWINGS E-421-113 PENETRATIONS (PAGE 1 OF 1 )

PENETRATING PENETRATION PENETRATING PENETRATION SERVICE DIMENSIONS SERVICE SEALANT NOTES DIMENSIONS (IF ANY)

Not Evaluated N/A N/A N/A The West Wall (South of (South of Column Line lla) was not Column Line evaluation since it is lid) exposed to the outside Column Line 7d See AB-FZ-6 for wall to lid penetration details of See AB-FZ-6 the West Wall of FH-FZ-2 Column Line 6d See AB-FZ-6 for wall to 7d Same as penetration details of AB-FZ-6 West Wall of FH-FZ-2 between Column Lines 6d and 7d

ATTACHMENT A Sh. 40 BUILDING,- Fuel Handling Building FIRE ZONE - FH-FZ-2 ELEVATION -

305'-0" ORIENTATION - North Wall CONSTRUCTION - Reinforced Concrete THICKNESS -

2'-0" & 3'-6" REFERENCE DRAWINGS E-421-114 PENETRAllONS (PAGE 1 OF 1)

PENETRATING PENETRATION PENETRATING PENETRATION SERVICE DIMENSIONS SERVICE SEALANT NOTES DIMENSIONS (iTANY)

Not Evaluated N/A N/A N/A The North Wall was not evaluated since it is a 3 hr rated fire wall Adjacent to 14" $

10" $

Open

- North Wall adjacent FH-FZ-1 (Chase) to FH-FZ-1 HVAC Duct &

l '-2

x l '-8" l'-0" x l'-6" Open Conduit HVAC Duct 2" & Conduit Electrical Tray 11" x l'-0" 6" Tray

& Cenduit 2" $ Conduit Blockout (Misc 2'-6" x 3'-2" 18" x 18" HVAC Open Services)

Duct 2" $ Pipe (2) 1-1/2" $

- Conduit 3" $ Conduit 1-1/2" & Pipe 1/2" Tubes (3)

ATTACHMENT A Sh. 41 BUILDING - Fuel Handling Building FIRE ZINE-FH-FZ-2 ELEVATION - 305'-0" to ORIENTATION - South Wall 409'-0" CONSTRUCTION - Reinforced Concrete THICKNESS -

5'-0" REFERENCE DRAWINGS E-421-113 PENETRATIONS (PAGE 1 OF 1 )

PENETRATING PENETRATION PENETRATING PENETRATION SERVICE DIMENSIONS SERVICE SEALANT NOTES DIMENSIONS (IF ANY)

Not Evaluated N/A N/A N/A The South Wall was not 305'-0" to evaluated since it is a 348'-0" 3 hr rated fire wall from 305'-0" to 348'-0" Not Evaluated N/A N/A N/A The South Wall was not 348'-0" to evaluated since it is 409'-0" exposed to the Unit 2, fuel pool and there are no penetrations For FH-FZ-2 Adjacent to FH-FZ-4 North of (fuel pool area)

Column Line 7d no penetrations Sleeve 6" $

Unknown Unknown Verification could not be made by Walk Down i

Team 1

l Blockout (HVAC) 5'-2" x 9'-6" 4'-0" x 2'-6" Open 4'-0" x 5'-0" l Pipe 6" & (2) 4" Pipe Open Sleeves 6" $ (3)

None Open Pipes 8" $ (2) 4" $

Open Blockout 2'-0" x 4'-6" Grouted l (Pipes) 2-1/2" $

3/4" $ Pipe Sleeve l

3" $

1" $ Pipe (2)

Sleeve 4" $

1" & Pipe (2)

Sleeve 3" $

1/4" $ Pipe

1 ATTACHMENT A Sh. 42 BUILDING - Fuel Handling Building FIRE ZONE-FH-FZ-2 ELEVATION - 305'-0" - 409'-0" ORIENTATION - Floor CONSTRUCTION - Reinforced Concrete THICKNESS -

3'-0" REFERENCE DRAWINGS E-421-108 PENETRATIONS (PAGE 1 OF 2 )

PENETRATING PENETRATION PENETRATING PENETRATION SERVICE DIMENSIONS SERVICE SEALANT NOTES DIMENSIONS (IF ANY)

Sams as FH-FZ-1 See AB-FZ-1 (Ceiling)

(Ceiling) for penetration details For FH-FZ-2 adjacent te Control Building CB-FA-1 at El. 305'-0" see below Blockout w/

6'-6" x 15'-6" 3/4" & Conduit Misc Services (10) 1-1/2" $

Conduit (7) 10" $ Pipe w/

insul 2" $ Pipe (5) 2-1/2" $

Conduit (2) 1" & Conduit Open l

(6) 1-1/4" $

Conduit (2) 4" & Conduit (4) 1-3/4" $

Conduit (1) 12" $ Pipe (1) 1/2" $ Pipe (1) 4" $ Pipe (2) 2" $ Conduit (3) 3" $ Conduit (2) 16" $ Air Duct 5'-0" x 2'-6" Air Duct

ATTACHMENT A Sh. 43 BUILDING - Fuel Handling Building FIRE ZONE-FH-FZ-2 ELEVATION - 305'-0" - 409'-0" ORIENTATION - Floor CONSTRUCTION - Reinforced Concrete THICKNESS -

3'-0" REFERENCE DRAWINGS E-421-108 PENETRATIONS (PAGE 2 op 2 }

PENETRATING PENETRATION PENETRATING PENETRATION SERVICE DIMENSIONS SERVICE SEALANT NOTES DIMENSIONS (IF ANY)

Blockout w/ Misc 4'-0" x 15'-6" 3/4" $ Conduit Open Grating with 1/8" thick Services (2) plate over opening 1" $ Conduit (clean clothing barrel 3" $ Conduit storage)

(4) 1-1/4" $

Conduit 4" $ Pipe 1" $ Pipe Electrical 5" $

4" $

Open Conduit Electrical 2" $ (3) 1-1/2" $

Open Conduit l

l l

l l

l l

l l

l l

ATTACHMENT A Sh. 44 BUILDING. Fuel Handling Building 322'-0" (Floor Elev.) & 329'-0" (Floor Elev.)

FIRE ZMNE. FH-FZ-2 ELEVATION. 409 '-0" ORIENTA TION - Ceiling (Floor Elev.)

CONSTRUCTION. Reinforced Concrete THICKNESS - 5'-0" (409'-0")

REFERENCE DRAWINGS 18" (322'-0")

E-421-209 (ADJ to 2'-0" (339'-0")

CB-FA-1) Floor El. 322'-0" PENETRATIONS (PAGE 1 OF 4)

PENETRAUNG PENETRADON PENETRADNG PENETRADON SERVICE DitM.NSIONS SERVICE SEALANT NOTES DIMENSIONS (IF ANY) l Not Evaluated N/A N/A N/A The Ceiling was not evaluated since it is exposed to the exterior See below for Ceiling penetrations in FH -FZ-2 adjacent to CB-FA-1 at floor El. 322'-0" Electrical 3" 4 1-1/2" $

Open Conduit Blockout w/ Misc l'-0" x 2'-0" 4" $ Pipe (3)

Open Service 3" 4 Conduit 1" $ Conduit (2) 3/4" & Conduit (2) 1" $ Pipe (2)

Blockout l'-6" x 9'-6" 2" $ Conduit

(Conduit) 1-1/2" $ Conduit l

(2) l 3/4" & Conduit (3)

Core Drill 5" $

4" $ Conduit Open (Conduit) lCoreDrill 1-1/2" 4 1" & Conduit Open I (Conduit)

HVAC Duct 3'-6" x 5'-5" 2'-0" x 5'-0" Open i

ATTACHMENT A Sh. 45 BUILDING - Fuel Handling Building 322'-0" (Floor Elev.) & 329'-0" (Floor Elev.)

FIRE Z1NE-FH-FZ-2 ELEVATION - 409 '-0" ORIENTATION-Ceiling 5 '-0" (409 '-0")

CONSTRUCTION-Reinforced Concrete THICKNESS - 5'-0" (409'-0")

REFERENCE DRAWINGS 18" (322'-0")

E-421-209 (ADJ to 2'-0" (339'-0")

CB-FA-1) Floor El. 322'-0" PENETRATIONS (PAGE 2 OF 4 )

PENETRATING PENETRATION PENETRATING PENETRATION SERVICE DIMENSIONS SERVICE SEALANT NOTES DIMENSIONS (IF ANY)

Blockout w/ Misc l'-6" x 2'-0" 10" $ Pipe Open Services w/insul (2) 2" $ Pipe 1-1/2" $

Conduit 1-1/4" $

Conduit (2) 1" $ Conduit (2) 3/4" $ Conduit (2)

Electrical 4" $

Same Embedded Conduit Electrical 2" $

Same Embedded Conduit Core Drill 4" $

2-1/2" $

Open (Conduit)

Conduit Core Drill 2" $

1" & Conduit Open l (Conduit)

(3) i Electrical 1" $

Same Embedded l Conduit Electrical 2-1/2" $

Same Embedded Conduit I Core Drill 2-1/2" $

1-1/2" $

Open (Conduit)

Conduit Blockout w/ Misc 18" x 6'-6" 16" x 3'-6" Crouted Service Duct 30" Tray 1" & Conduit

ATTACHMENT A Sh. 46 BUILDING. Fuel Handling Building 322'-0" (Floor Elev.) & 329'-0" (Floor Elev.)

FIRE ZONE. FH-FZ-2 ELEVATION - 409 '-0" ORIENTATION-Ceiling (Floor Elev.)

CONSTRUCTION. Reinforced Concrete THICKNESS - 5'-0" (409'-0")

REFERENCE DRAWINGS 18" (322 '-0")

E-421-209 (ADJ to 2'-0" (339'-0")

CB-FA-1) Floor El. 322'-0" PENETRABONS (PAGE 3 OF 4 )

PENETRATING PENETRATION PENETRATING PENETRATION SERVICE DIMENSIONS SERVICE SEALANT NOTES DIMENSIONS (IF ANY)

Core Drill 3" $ (5) 2" $

Open (Conduit)

Core Drill 4" $ (3) 3" $

Open (Conduit)

Core Drill 5" $ (2) 4" $

Open (Conduit)

Core Drill 4" $

2-1/2" $

Open (Conduit)

Core Drill 3" $ (3) 1-1/2" &

Crouted (Conduit)

Core Drill 3" $

2-1/2" $

Open (Conduit) l l Core Drill 5" $

3" $

Open

' (Conduit)

Core Drill 4" $

3" $

Sealed (Conduit)

Core Drill 3" $

2" $

Open (Conduit)

Core Drill 2" $ (2) 3/4" &

Sealed i

(Conduit)

' Blockout w/ Misc l'-0" x 6'-6" 12" Tray Grouted Services 30" Tray Grouted 18" Tray Open 2" $ Conduit Grouted (3) 3/4" $ Conduit Open l HVAC Duct 3'-0" x 5'-0" 2'-9" x 4'-8" Sealed with Sneet Metal l

ATTACHMENT A Sh. 47 RUILDING - Fuel Handling Building 322'-0" (Floor Elev.) & 329'-0" (Floor Elev.)

FIRE ZONE-FH-FZ-2 ELEVATION 409'-0" ORIENTATION Ceiling (Floor Elev.)

CSNSTRUCTION-Reinforced Concrete THICKNESS -

5'-0" (409'-0")

REFERENCE DRAWINGS 18" (322'-0")

E-421-209 (ADJ to 2'-0" (339'-0")

CB-FA-1) Floor El. 322'-0" PENETRADONS (PAGE 4 OF 4 )

PENETRATING PENETRATION PENETRATING PENETRATION SERVICE DIMENSIONS SERVICE SEALANT NOTES DIMENSIONS (IF ANY)

Cora Drill 3" $

l-1/2" $

Sealed (Conduit)

Conduit Core Drill 5" $

3" $ Conduit Sealed (Conduit)

Blockout w/ Misc 2'-0" x 11'-6" 30" Tray (2)

Grouted Services 1" $ Conduit 3/4" $ Conduit (3)

HVAC Duct 7'-0" x 7'-0" 6'-6" x 6'-6" Sealed with 1/16" Plate Core Drill 3" $ (2) 1-1/2" $

Sealed (Ccaduit)

Conduit Core Drill 5" $

3" $ conduit Sealed (Conduit)

Core Drill 3" $

2" $ Conduit Sealed (Conduit)

NOTE:

For penetrations in ceiling of FB-FZ-2 at Floor El. 329'-0" adjacent to FB-FZ (see FB-FZ-3 Floor) t

BUILDING. Funt Htndling Building FIRE Zf NE. FH-FZ-3 ELEVATION. 329'-0" & 331'-0" ORIENTATION. North Wall CCNSTRUCTION. Reinforced Concrete THICKNESS -

5'-0" REFERENCE DRAWINGS E-421-118 PENETRATIONS (PAGE 1 OF 1)

PENETRATING PENETRATION PENETRATING PENETRATION SERVICE DIMENSIONS SERVICE SEALANT NOTES DIMENSIONS (IF ANY)

Sleeves 6"$

Unknown Not Known Penetrations through the North Wall could not be varified by the Walk-Down Team due to radiation levels.

,4

i ATTACHMENT A Sh. 50 BUILDING. Fual Htndling Building FIRE ZCNE. FH-FZ-3 ELEVATION. 329'-0" & 331'-0" ORIENTATION. Floor CCNSTRUCTION. Reinforced Concrete THICKNESS.

2'-0" REFERENCE DRAWINGS N/A PENETRATIONS (PAGE 1 OF 1)

PENETRATING PENETRATION PENETRATING PENETRATION SERVICE DIMENSIONS SERVICE SEALANT NOTES DIMENSIONS (IF ANY) l Pipe 14"$

8"$

Open Pipe 10"$

4"$

Open Blockout w/ misc 8'-6" x 11'-0" 12", trays (2)

Open services 2-1/2"$ conduit 1"$ conduit (6) 3/4"$ conduit 1"$ pipe 2-1/2"$ pipe 4"$ pipe i

l i

l l

l

ATTACHMENT A Sh. 49 BUILDING. Funi Hindling Building e

FIREZONE. FH-FZ-3 ELEVATION. 329'-0" & 331'-0" ORIENTATION. South Wall O2NSTRUCTION. Reinforced Concrete THICKNESS.

2'-0" REFERENCE DRAWINGS E-421-117 E-421-118 PENETRATIONS (PAGE 1 OF 1 )

PENETRATING PENETRATION PENETRATING PENETRATION SERVICE DIMENSIONS SERVICE SEALANT NOTES DIMENSIONS (IF ANY)

Adjacent to 5'-9" x 9'-0" Door 1-1/2 Hr Elevator Shaft Same Labeled Fire FZ-FZ-1 Door Adjacent to 3'-5" x 7'-Sk" Door.

Door not FH-FZ-2 Same Labeled

I ATTACHMENT A Sh. 51 BUILDING. Fual H;maling Building FIRE ZONE. FH-FZ-3 ELEVATION. 348'-0" ORIENTATION. Ceiling CONSTRUCTION - Reinforced Concrete THICKNESS.

2'-0" REFERENCE DRAWINGS E-421-117 1

PENETRATIONS (PAGE OF I)

PENETRATING PENETRATION PENETRATING PENETRATION SERVICE DIMENSIONS SERVICE SEALANT NOTES DIMENSIONS (IF ANY)

Embsdments 4"$ (7)

Same Caps Pips 6"$

l-1/2"$

Open Electrical 2-1/2"$ (2)

Same Embedded Conduit Electrical 2"$ (3)

Same Embedded Conduit Electrical 1-1/2"$ (4)

Same Embedded Conduit Electrical 3/4"$

Same Embedded Conduit Electrical 1"$ (2)

Same Embedded Conduit Pipe 6"$

l-1/2"$ pipe Open 3/4"$ pipe Crating 12'-0" x Same Open 15'-0" Crating 13'-0" x Same Open 22'-0"

ATTACHMENT A Sh. 52 BUILDING - Fu21 Hindling Building FIRE ZONE-FH-FZ-4 ELEVATION - 305'-0" & 348'-0" ORIENTATION - Floor CCNSTRUCTION - Reinforced Concrete THICKNESS.

S'_0" REFERENCE DRAWINGS E-421-ll7 PENETRATIONS (PAGE 1 OF 1 )

PENETRATING PENETRATION PENETRATING PENETRATION SERVICE DIMENSIONS SERVICE SEALANT NOTES DIMENSIONS (IF ANY)

At El. 348'-0" See FB-FZ-3 (Ceiling)

Sami as Ceiling for penetration details of FB-FZ-3 at operating floor El. 348'-0" At El. 305'-0" (Bottom of Fuel Pool) No None None N/A No penetrations of penetrations bottom of Fuel Pool

._______________________-____________________________________-___s

ATTACHMENT A Sh. 53 BUILDING. Fuel H:ndling Building FIRE ZONE. FH-FZ-4 ELEVATION.

305'-0" to 400'-0" ORIENTATION.

East Wall CCNSTRUCTION. Reinforced Concrete THICKNESS.

S'-0" REFERENCE DRAWINGS N/A PENETRATIONS (PAGE 1 OF 1)

PENETRATING PENETRATION PENETRATING PENETRATION SERVICE DIMENSIONS SERVICE SEALANT NOTES DIMENSIONS (IF ANY)

Sleeves (at (6) 5"$

Same Embedded (At El. 322'-0" Fuel El. 322'-0" (0 pen)

Pool Wall)

HVAC Duct Not Known 3'-0" x 8'-0" Not Known At El. 380'-0" (could not confirm blockout dimensions and sealant).

l

ATTACHMENT A Sh. 54 BUILDING - Fuel Handling Building FIRE ZONE-FH-FZ-5 ELEVATION -

322'-0" to 400'-0" ORIENTATION - West Wall CONSTRUCTION - Reinforced Concrete THICKNESS -

S'-On REFERENCE DRAWINGS N/A PENETRATIONS (PAGE 1 OF 1)

PENETRATING PENETRATION PENETRATING PENETRATION SERVICE DIMENSIONS SERVICE SEALANT NOTES DIMENSIONS (IFANY)

Sleeves (at (6) 5"$

Same Embedded (at El. 322'-0") in Fuel El. 322'-0" (0 pen)

Pool Wall (South End)

HVAC Duct Not Known 3'-0" x 8'-0" Not Known El. 380'-0" Could not (at 380'-0")

confirm blockout dimension & sealant

l l

l ATTACHMENT A Sh. 55 8UILDING - Fuel Handling Building FIRE ZONE-FH-FZ-5 ELEVATION -

322'-0" to 400'-0" ORIENTATION - East Wall CC NSTRUCTION - Reinforced Concrete THICKNESS -

2'-0" REFERENCE DRAWINGS N/A PENETRATIONS (PAGE 1 OF 1)

PENETRATING PENETRATION PENETRATING PENETRATION SERVICE DIMENSIONS SERVICE SEALANT NOTES DIMENSIONS (IF ANY) l Not Evaluated N/A N/A N/A The East Wall below Below 380'-0" El. 380'-0" was not evaluated since it is a 3 hr rated Fire Wall Same as CB-FZ-Sa For East Wall at

& CB-FZ-5b elevation 380'-0" see CB-FZ-5a & CB-FZ-5b for penetrations through the wall

1 ATTACHMENT A Sh. 56 8UILDING - Fuel Handling Building FIRE ZONE-FH-FZ-5 ELEVATION - 322'-0" ORIENTATION. Floor CONSTRUCTION - Reinforced Concrete THlCKNESS -

3'-0" REFERENCE DRAWINGS E-421-209 PENETRATIONS (PAGE 1 OF 1 )

PENETRATING PENETRATION PENETRATING PENETRATION SERVICE DIMENSIONS SERVICE SEALANT NOTES DIMENSIONS (IF ANY)

Samn as FB-FZ-2 See FB-FZ-2 (Ceiling)

Ceiling adjacent adjacent to CB-FZ-1 for to CB-FZ-1 details of penetrations through floor at El. 322'-0" j

i l

l

)

l

\\

l

\\

l l

l l

ATTACHMENT A Sh. 57 BUILDING - Fuel Handling Building FIRE ZRNE-FH-FZ-6 ELEVATION -

305'-0' ORIENTATION -

Ceiling CONSTRUCTION. Reinforced Concrete THICKNESS -

3'-0" REFERENCE DRAWINGS E-421-108 PENETRATIONS (PAGE 1OF 1)

PENETRATING PENETRATION PENETRATING PENETRATION SERVICE DIMENSIONS SERVICE SEALANT NOTES DIMENSIONS (IF ANY)

Samn as FH-FZ-2 See FH-FZ-2 (Floor) for (Floor) details of penetrations through the ceiling of this fire zone

r ATTACHMENT A Sh. 58 BUILDING. Control Building FIRE ZRNE. CB-FZ-5A ELEVATION.

380'-0" ORIENTATION. West Wall CONSTRUCTION. Reinforced Concrete THICKNESS.

3'-0" REFERENCE DRAWINGS E-421-222 PENETRATIONS (PAGE 1 OF 1 )

PENETRATING PENETRATION PENETRATING PENETRATION SERVICE DIMENSIONS SERVICE SEALANT NOTES DIMENSIONS (IF ANY)

HVAC Duct 2'-0" x 2'-0" 18" x 18" Bisco Pipe 8" $

3" $

Open HVAC Duct 2'-2" x l'-0" Same Bisco Sh et Metal 10'-0" x 3'-0" x 7'-0" Not Rated Panel (with 15'-0" Door Door & Block-(2-1/4" Thick) 24" x 24" No Fire Damper outs) & Conduit Louvered Vent Penetrations Blockout Open NOTE:

Metal Panel Not 6" Tray (2)

Fire Rated Blockout 1-1/2" 4 Conduit (2)

Bisco 2" & Conduit 3" $ Conduit Blockout 2" $ Conduit

(

l-1/2" $

1 Conduit Bisco i

1" $ Conduit 3/4" $ Conduit j

1-1/2" $

Open Conduit (2)

ATTACHMENT A Sh. 59 BUILDING. Control Building FIRE ZONE. CB-FZ-5B ELEVATION.

380'-0" ORIENTATION. West Wall CiNSTRUCTION. Reinforced Concrete THICKNESS.

3'-0" REFERENCE DRAWINGS E-421-222 PENETRATIONS (PAGE 1 OF 1)

PENETRATING PENETRATION PENETRATING PENETRATION SERVICE DIMENSIONS SERVICE SEALANT NOTES DIMEN'90NS (IF ANY)

HVAC Duct 2'-0" x 2'-0" 18" x 18" Open Pips 8" $

3" $

Kaowool Shsst Metal 10'-0" x 3'-0".x 7'-0" Not Rated Penal (with 15'-0" (2-1/4" 24" x 24" No Fire Damper Blockouts &

Thick)

Louvered Vent

& Door) &

2" $ Conduit Open Conduit Penetrations Blockout 6" Tray (2)

Kaowool in Openings within Blockout 3/4" $ Conduit 3" $ Conduit Blockout Grouted 3/4" $ Conduit 1" & Conduit l

1-1/2" ? Conduit l

i l

l l

l

ATTACHMENT A Sh. 60 BUILDING - Intermediate Building FIRE ZONE -

ORIENTADON -

IB-FZ-1 295'-0" North Wall CONSTRUCTION -

^

Reinforced Concrete 2'-0" E-421-305 PENETRATIONS (PAGE OF g) y PENETRATING PENETRATION PENETRATING PENETRATION SERVICE DIMENSIONS SERVICE SEALANT NOTES DIMENSIONS (IF ANY)

Electrical 2'-0" x l'-0" 3" $

Open Conduit Doorway 3'-4-1/2" x Same Open No Door Installed (295'-0")

8'-0" Doorway 3'-4-1/2" x Same Door (3 Hr) 3 hr Labeled Door (305'-0")

7'-4-1/4" Installed Blockout (Pipe 2'-6" x 3'-0" 18" $ Pipe Open

& Conduit) 3" $ Conduit 1" & Conduit 3/4" $ Conduit Conduit l'-0" x 2'-0" 3" $

Open 2" $

1-1/2" $

Pipe l'-0" x 2'-0" 1" $ (2)

Open

ATTACHMENT A Sh. 61 BulLDING - Intermedicto Building FIRE Z'NE-IB-FZ-1 ELEVATION - 295'-0" ORIENTATION - West Wall CONSTRUCTION - Reinforced Concrete THICKNESS -

2'-0" REFERENCE DRAWINGS E-421-305 PENETRADONS (PAGE 1 OF 1 )

PENETRATING PENETRATION PENETRATING PENETRATION SERVICE DIMENSIONS SERVICE SEALANT NOTES DIMENSIONS (IF ANY)

Sisovas (4) 3" Same Plugged Electrical l'-0" x 2'-0" 1" $ (2)

Open Conduit Electrical l'-0" x 2'-0" 1" $

Open Conduit 3/4" $ (2)

Electrical 3/4" $

Same Embedded Conduit Electrical 3/4" $

Same Embedded Conduit Electrical l'-0" x 2'-0" 3/4" $ (2)

Open Conduit 1-1/2" $ (3)

Pipa & Tubing 2'-0" x 2'-2" 1" $ (3) Pipe Open 3/8" $ (2)

Tubing Blockout 2'-0" x 3'-0" Same Open Conduit Electrical 2'-0" x 3'-0" 1-1/2" $

Open Conduit Blockout 11" x l'-0" Same Open Blockout l'-0" x 3'-0" Same Opan Electrical 11" x l'-6" 1" $ Conduit Grouted Tray & Conduit 3" $ Conduit 6" Tray Pipe &

2'-0" x 2'-0" 1" $ Conduit Open Electrical 1-1/2" $ Pipe Conduit

ATTACHMENT A Sh. 62 BulLDING. Interm: dicto Building FIRE ZINE - IB-FZ-1 ELEVATION. 295'-0" ORIENTATION. East Wall CNSTRUCTION. Reinforced Concrete THICKNESS.

3'-0" REFERENCE DRAWINGS E-421-304 PENETRATIONS (PAGE 1 OF 1)

PENETRATING PENETRATION PENETRATING PENETRATION SERVICE DIMENSIONS SERVICE SEALANT NOTES DIMENSIONS (IF ANY)

Scme as West See West Wall of IB-FZ-2 Wall of IB-FZ-2 for details of wall penetrations

(

l l

l l

l i

1 1

ATTACHMENT A Sh. 63 BUILDING - Intermedicta Building FIRE ZPNE - IB-FZ-1 ELEVATION - 295'-0" ORIENTATION. Floor C' INSTRUCTION. Reinforced Concrete THICKNESS -

3'-3" REFERENCE DRAWINGS E-421-302 PENETRABONS (PAGE 1 OF 1 )

PENETRATING PENETRATION PENETRATING PENETRATION SERVICE DIMENSIONS SERVICE SEALANT NOTES DIMENSIONS (IF ANY)

Pips 10" $

4" $

Open Pips 10" $

4" $

Open Electrical 3-1/2" $

3-1/2" $

Embedded Conduit 4

l I

ATTACHMENT A Sh. 64 BUILDING. Intermidiate Building FIRE ZONE. IB-FZ-1 ELEVATION.

322'-0" ORIENTATION. Ceiling (Floor Elev.)

CCNSTRUCTION. Reinforced Concrete THICKNESS -

3'-3" REFERENCE DRAWINGS E-421-309 PENETRATIONS (PAGE 1 OF 1 )

PENETRATING PENETRATION PENETRATING PENETRATION SERVICE DIMENSIONS SERVICE SEALANT NOTES DIMENSIONS (IF ANY)

Pips 12" $

2" $

Open Tubing 12" $

1/4" $ (4)

Open Pipe l'-6" x 3'-0" 2" $ (2)

Open 1-1/2" 4 (2)

Blockout l'-0" x l'-0" Same Open Electrical 8" $

l-1/4" $

Open Conduit 2" $

Pipe 8" $

1" $ (2)

Open i

ATTACHMENT A Sh. 65 BUILDING. Intermrdicte Building FIRE ZONE. IB-FZ-2 ELEVATION -

295'-0" ORIENTATION. North Wall CCNSTRUCTION - Reinforced Concrete THICKNESS -

2'-0" REFERENCE DRAWINGS E-421-305 PENETRATIONS (PAGE 1 OF 1 )

PENETRATING PENETRATION PENETRATING PENETRATION

)

SERVICE DIMENSIONS SERVICE SEALANT NOTES DIMENSIONS (IF ANY)

Doorway 3"-4-1/2" x Same Open No Door Installed (295'-0")

8'-0" Doorway 5'-0" x 8'-0" Same 3 Hr Labeled (305'-0")

Door Pipe & Tubing l'-0" x 2'-0" 1" $ Pipe Open 3/8" $ Tube (2)

Blockout l'-0" x 2'-0" Same Open Electrical l'-0" x l'-6" 1" $ Pipe Open Conduit & Pipe 1" & Conduit Pipe l'-6" x 2'-0" 6" $

Open Pipe 2'-0" x 2'-0" 10" $

Open l

l

ATTACHMENT A Sh. 66 BUILDING - Intermidiate Building FIRE ZONE-IB-FZ-2 ELEVATION -

295'-0" ORIENTATION - East Wall CC NSTRUCTION - Reinforced Concrete THICKNESS -

3'-0" REFERENCE DRAWINGS E-421-304 PENETRATIONS (PAGE 1 OF 1 )

PENETRATING PENETRATION PENETRATING PENETRATION SERVICE DIMENSIONS SERVICE SEALANT NOTES DIMENSIONS (IF ANY)

Sama as West N/A N/A N/A See West Wall of IB-FZ-3 Wall of for details of wall IB-FZ-3 penetrations l

I i

i l

E l

ATTACHMENT A Sh. 67 BUILDING. Intermediate Building FIREZANE. IB-FZ-2 ELEVATION -

295'-0" ORIENTATION - West Wall CCNSTRUCTION - Reinforced Concrete THICKNESS -

3'-0" REFERENCE DRAWINGS E-421-304 PENETRATIONS (PAGE 1 OF 1 )

l PENETRATING PENETRATION PENETRATING PENETRATION SERVICE DIMENSIONS SERVICE SEALANT NOTES DIMENSIONS (IF ANY)

Pips 2'-0" x 3'-0" 1" $

Open Blockout 2'-0" x 3'-0" Same Open Electrical 11" x l'-0" 6" Tray Grouted Tray & Conduit 1" $ Conduit Blockout l'-0" x l'-6" Same Open Electrical l'-6" x 2'-1" 6" Tray Grouted Tray & Conduit 1" $ Conduit 12" Tray Electrical 2'-7" x 4'-0" 12" Tray Open Tray & Conduit 1" $ Conduit Electrical 2" $ (2) 2" $

Embedded Conduit Electrical 1-1/2" $ (4) 1-1/2" &

Embedded Conduit Core Drilled 1-1/4" $ (2) 1-1/4" &

Concrete Holes Plugged Door 3'-4-1/2" x Same No Label on 8'-0" Door Electrical l'-0" x 2'-1" 6" Tray (2)

Crouted Trays Pipe 2'-0" x 2'-0" 1" $

Open 1-1/2" $ (2)

ATTACHMENT A Sh. 68 BUILDING. Intermtdiate Building FIRE ZONE. IB-FZ-2 ELEVATION. 295'-0" ORIENTATION. Floor CCNSTRUCTION - Reinforced Concrete THICKNESS -

3'-3" REFERENCE DRAWINGS E-421-302 PENETRATIONS (PAGE 1 OF 1 )

PENETRATING PENETRATION PENETRATING PENETRATION SERVICE DIMENSIONS SERVICE SEALANT NOTES DIMENSIONS (IF ANY)

Sleeve 8" $

Same Open Sleeve 8" $

Same Open l

ATTACHMENT A Sh. 69 BUILDING IntermIdicte Building FIRE ZENE. IB-FZ-2 ELEVATION. 322'-0" ORIENTATION - Ceiling (Floor Elev.)

C! INSTRUCTION - Reinforced Concrete THICKNESS -

3'-3" REFERENCE DRAWINGS E-421-309 PENETRATIONS (PAGE 1 OF 1 )

PENETRATING PENETRATION PENETRATING PENETRATION SERVICE DIMENSIONS SERVICE SEALANT NOTES DIMENSIONS (IF ANY)

Electrical 4" $

1-1/2" $

Embedded /

Conduit Capped Sleeve Siceve 4" &

Same Embedded /

Capped Sleeve Pipe 12" $

2-1/2" $

Open Tubing l'-0" x l'-0" 3/8" Open Pipe 2'-6" x 4'-6" 18" $

Open w/ insulation 10" $

3" $

Pipe 16" $

10" Open Pipe 16" $

10" Open Pipe 18" $

10" Open Cable Tray 4'-2" x l'-6" 6" Tray (2)

Crouted 12" Tray Pipe 4'-5" x 2'-6" 10" $

Open w/ insulation 18" $

w/ insulation HVAC Duct 10" x 10" 6" $

Open Dwg Shows 8" Pipe Sleeve Instead of 10" x 10" Blockout Pipe 18" &

5" $

Open w/ insulation Pipe 10" x 10" $

8" $

Open Dwg Shows 8" Pipe Sleeve w/ insulation Instead of 10" x 10" Blockout Pipe 16" $

8" $

Open w/ insulation

ATTACHMENT A Sh. 70 BUILDING. Intermediato Building FIRE ZCNE-IB-FZ-3 ELEVATION. 295'-0" ORIENTATION - North Wall CONSTRUCTION - Reinforced Concrete THICKNESS -

2'-0" REFERENCE DRAWINGS E-421-305 PENETRATIONS (PAGE 1 OF 2 )

FENETRATING PENETRATION PENETRATihG PENETRATION SERVICE DIMENSIONS SERVICE SEALANT NOTES OlMENSIONS (IF ANY)

Tubing l'-0" x 2'-0" 1/2" &

Crouted Pipe l'-0" x 2'-0" 2" $

Crouted Blockout l'-0" x 2'-0" Same Open Pipa l'-0" x 2'-0" 1" $

Open 1-1/4" $ (3)

Conduit 2'-1" x 2'-4" 2" $

Open 3" $ (2)

Doorway 5'-0" x 8'-0" Same 3 Hr Labeled (305'-0")

Door Electrical Tray l'-2" x 2'-0" 1/2" $ (3)

& Conduit Conduit Open 1" $ Conduit 1-1/2" $ (2)

Conduit 6" Tray

' Doorway 3'-4-1/2" x Same Open No Door Installed (295'-0")

8'-0" Pips l'-0" x 2'-0" 2" $

Open l Doorway 3'-4-1/2" x Same Open No Door Installed l (295'-0")

8'-0" l

Pipe 2'-0" x 2'-0" 10" $

Open Doorway 5'-0" x 8'-0" Same 3 Hr Labeled (305'-0")

Door j

Electrical l'-0" x 2'-0" 1" $

Open

Conduit l

Pipa l'-0" x 2'-0" 1" $

Open l

Doorway 3'-4-1/2" x Same 3 Hr Labeled (305'-0")

7'-4-1/2" Door 1

l l

ATTACHMENT A Sh. 71 BUILDING - Intermediate Building FIRE ZONE - IB-FZ-3 ELEVATION - 295'-0" ORIENTATION - North Wall CO NSTRUCTION - Reinforced Concrete THICKNESS.

2'-0" REFERENCE DRAWINGS E-421-305 PENETRATIONS (PAGE 2 OF 2 )

PENETRATING PENETRATION PENETRATING PENETRATION SERVICE DIMENSIONS SERVICE SEALANT NOTES DIMENSIONS (IF ANY)

Blockouts l'-0" x 2'-0" Same Open (3)

Electrical l'-0" x 2'-0" 1-1/2" $

Conduit Pipe (3)

& Pipe 1-1/2" $

Conduit (2)

Blockout l'-0" x 2'-0" Same Open Electrical l'-6" x l'-0" 3" & Conduit Conduit &

4" & Conduit Pipe 1" $ Conduit (2)

Open 1-1/2" $

Conduit (3) 1/2" $ Conduit 2" $ Pipe l

l l

l l

l l

ATTACHMENT A Sh. 72 BulLDING - Intermediate Building FIRE ZONE-IB-FZ-3 ELEVATION -

295'-0" ORIENTATION - West Wall CONSTRUCTION - Reinforced Concrete THICKNESS -

3'-0" REFERENCE DRAWINGS E-421-304 PENETRATIONS (PAGE 1 OF 1 )

PENETRATING PENETRATION PENETRATING PENETRATION l

SERVICE DIMENSIONS SERVICE SEALANT NOTES DIMENSIONS (IF ANY)

Pipe 2'-0" x 2'-3" 6" $

Open Pipa 2'-0" x 2'-3" 8" $

Open Pipe 2'-0" x 2'-3" 2" $

Open 6" $

Pipe 22" $

15" $

Open HVAC Duct 2'-6" x 2'-6" 26" Duct No Fire Damper 28" Frame i

Pipe 8" x 9" 4" $

Open Electrical 11" x l'-0" 6" Tray Crouted Tray &

1-1/2" $

Conduit (2) 1" $ Conduit Blockout l'-0" x l'-6" Same Open Electrical l'-6" x 2'-1" 6" Tray Grouted Trays 12" Tray l Electrical 3'-0" x 7'-

6" Tray (2)

Marinite Board l Trays 4-1/2" 12" Tray

& Kaowool l

l Pipe 2'-0" x 2'-0" 8" $ w/insul.

Open l

2" $ (2)

Pipe 28" $

19" $

Open Electrical 1-1/2" $ (6) 1-1/2" $

Embedded 2" $ (2) 2" $

l

ATTACHMENT A Sh. 73 BUILDING. Interm: dicto Building FIRE ZrNE. IB-FZ-3 ELEVATION.

295'-0" ORIENTATION. Floor CONSTRUCTION. Reinforced Concrete THICKN

3'-3" REFERENCE DRAWINGS E-421-302 PENETRATIONS (PAGE 1 OF 1 )

PENETRATING PENETRATION PENETRATING PENETRATION SERVICE DIMENSIONS SERVICE SEALANT NOTES DIMENSIONS (IF ANY)

Sleeve 8" $

Same Open Sleeve 8" $

Same Open Creting 5'-0" x 8'-6" Same Open Grating 5'-0" x 8'-6" Same Open Sleeve 8" $

Same Open Electrical 8" $

1" $

Open Conduit Electrical 8" $

1" $ (2)

Open Conduit 1-1/4" $

2" $

Pipe 12" $

6" $

Open Pipe 12" $

6" $

Open Electrical 8" $

3/4" $

Open Conduit Pipe 8" $

1" $

Open Pipe 8" $

2" $

Open t

l l

l ATTACHMENT A Sh. 74 BUILDING Intermediate Building FIRE ZT NE -

ON-ORIENTADON.

IB-FZ-3 322'-0" Ceiling (Floor Elev.)

CS NSTRUCTION.

THICKNESS -

REFERENCE DRAWINGS Reinforced Concrete 3'-3" E-421-309 PENETRATIONS (PAGE OF 3) y PENETRATING PENETRATION PENETRATING PENETRATION SERVICE DIMENSIONS SERVICE SEALANT NOTES DIMENSIONS (IF ANY)

Electrical l'-0" x 2'-6" 6" Tray Grouted Tecy 12" Tray Electrical l'-0" x l-6" 6" Trsy (2)

Crouted Tray Electrical l'-0" x l'-0" 6" Tray Grouted Tray Electrical 3/4" $ (3)

Same Embedded Conduits Sleeves 8" $ (2)

Same Open Pipe 18" $

15" $ w/insul.

Open Pipe 30" $

27" $ w/insul.

Open Grating -

4'-6" x 8'-0" 2-1/2" $

Open (Misc. Pene-Pipe Support tretions)

Rod 10" $ HVAC Duct 12" $ Pipe w/insul.

1/4" Tubing Pipe 12" $

2-1/2" $

Open Blockout l'-0" x l'-0" Same Open Pipe 18" $

15" & Pipe Open w/insul.

Sleeve 6" $

Same Open Pipe 6" $

1" $

Open

ATTACHMENT A Sh. 75 BUILDING. Intsem: dicto Building FIRE Z5NE. IB-FZ-3 ELEVATION. 322'-0" ORIENTATION - Ceiling (Floor Elev.)

CE NSTRUCTION - Reinforced Concrete THICKNESS -

3'-3" REFERENCE DRAWINGS E-421-309 P_ENETRATIONS (PAGE 2 OF 3 )

PENETRATING PrNE1 RATION PENETRATING PENETRATION SERVICE DIMENSIONS SERVICE SEALANT NOTES DIMENSIONS (IF ANY)

Crating 4'-6" x 7'-6" l-1/2" $

Open (With Conduit)

Conduit Electrical 3" x 5-1/2" l-1/2 & (2)

Open Conduits (Oval)

Electrical 3/4" $

Same Embedded Conduits Sleeve 3/4" $

Same Plugged Pipe 16" x 22" 15" Pipe Open In Place of 18" Sleeve (Oval) w/insul.

as shown on Dwg.

Electrical 8" $

6" x 3" Oval Open Conduit &

Insulation Pipe Over Pipe 1" $ Pipe 1-1/2" 4 Conduit Electrical 3" $

2" $

Open Conduit Electrical 3" $

l-1/2" $

Open Conduit Electrical 3" $

3" $

Open Conduit Electrical l'-0" x l'-0" 3" $

Open Conduit 1-1/4" $ (2)

Sleeve 12" $

Same Open Electrical 4" $

Same Embedded Conduit Electrical 1-1/4" $

Same Embedded Conduit

- - - - - - - - - - - - _ _ _ _ _ _ _ _ -. _ _ _ _ _ _ _ _ - _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _- _ J

ATTACHMENT A Sh. 76 BUILDING Interm: dicto Building FIRE ZONE-IB-FZ-3 ELEVATION -

322'-0" ORIENTATION - Ceiling (Floor Elev.)

CONSTRUCTION - Reinforced Concrete THICKNESS -

3'-3" REFERENCE DRAWINGS E-421-309 PENETRATIONS (PAGE 3 OF 3 )

PENETRATING PENETRATION PENETRATING PENETRATION SERVICE DIMENSIONS SERVICE SEALANT NOTES DIMENSIONS (IF ANY)

Electrical 1-1/4" $

Same Embedded Conduit Electrical 1/2" &

Same Embedded Conduit Electrical 1" $

Same Embedded Conduit Electrical 4" $

Same Embedded Conduit Electrical 2" $

Same Embedded Conduit Electrical 2" $

Same Embedded Conduit Electrical 1" $

Same Embedded Conduit Electrical 1" $

Same Embedded Conduit Electrical 1" $

Same Embedded Conduit

ATTACHMENT A Sh. 77 BUILDING. IntermIdiote Building FIRE ZONE. IB-FZ-4 ELEVATION. 295'-0" ORIENTATION. East Wall CONSTRUCTION - Reinforced Concrete THICKNESS -

2'-0" REFERENCE DRAWINGS E-421-305 PENETRATIONS (PAGE 1 OF 1 )

PENETRATING PENETRATION PENETRATING PENETRATION SERVICE DIMENSIONS SERVICE SEALANT NOTES DIMENSIONS (IF ANY)

Scmn as West See West Wall of IB-FZ-1 Wall of IB-FZ-1 for details of Wall Penetrations Note at Column Line H between 1 & 2, the East Wall is a 3 hr fire rated wall and was not evaluated

)

[

l

ATTACHMENT A Sh. 78 BUILDING - Intermtdiate Building FIRE ZENE. IB-FZ-4 ELEVATION - 295'-0" ORIENTATION. Floor CENSTRUCTION - Reinforced Concrete THICKNESS -

3'-3" REFERENCE DRAWINGS 8

E-421-302 PENETRATIONS (PAGE 1 OF 1 )

PENETRATING PENETRATION PENETRATING PENETRATION SERVICE DIMENSIONS SERVICE SEALANT NOTES DIMENSIONS (IF ANY)

Pipa &

8" $

1" $ Pipe (2)

Open Electrical 1" x 1-1/2" Rscsway Elect. Raceway Crating & Misc 5'-0" x 8'-6" 3" $ Conduit Open Conduit Pene-1-1/2" $ Conduit trations 1" $ Conduit Electrical 8" $

1" $

Open 3" $

Pipe l'-0" x 2'-0" 1" $

Open s

_ _ _ _ _ _ _ _ - - _ _ - - - - _ _ _ _ _ _ _ _ _ _ - _ _ _ _ _ _ _ _ _ _ _ _ _ _ - _ _ - _ - __ - _ _0

ATTACHMENT A Sh. 79 BUILDING - Intermediate Building FIRE ZONE - IB-FZ-4 ELEVATION -

305'-0" ORIENTATION - Ceiling (Floor Elev.)

CYNSTRUCTION

  • Reinforced Concrete THICKNESS -

l'_in REFERENCE DRAWINGS E-421-303 PENETRABONS (PAGE 1 OF 1 )

PENETRATING PENETRATION PENETRATING PENETRATION SERVICE DIMENSIONS SERVICE SEALANT NOTES DIMENSIONS (IF ANY)

Sleevas 12" $ (2)

Same Grouted Sleeves Removed &

Crouted Equipmsnt Drain 2" $

Same Embedded Pipa 8" $

l-1/2" $

Open Crsting & Misc 4'-6" x 8'-0" 1/2" $ Tubing Open Penetrations (8) 3" $ Conduit 1-1/2" $ Conduit 1" $ Conduit Electrical 8" $

1" $

Open Conduit Pipe 8" x 2'-0" 1" $

Open

Equipment 2" $

Same Embedded L Drain Pipe 8" $

4" $

Open Pipe 30" $

20" $

Open Electrical 1" $

Same Embedded Conduit l Embedded 4-1/2" $ (2)

Same Capped Sleeves Sleeves 12" $ (2)

Same Grouted Sleeves Removed &

Grouted Electrical 1" $

Same Embedded ll Conduit Sleeve 1" $

Same Capped l

Embedded Stairs 5" x 0" x Same Open Stairwell 13"-0" 1

ITTACHMENT A Sh. 80 BUILDING - Intermediate Building FIRE ZONE - IB-FZ-5 ELEVATION -

305'-0" ORIENTATION - East Wall CONSTRUCTION - Reinforced Concrete THICKNESS -

2'-0" REFERENCE DRAWINGS E-421-305 PENETRATIONS (PAGE 1 OF 1 )

PENETRATING PENETRATION PENETRATING PENETRATION SERVICE DIMENSIONS SERVICE SEALANT NOTES DIMENSIONS (IF ANY) i Scme es West See West Wall of IB-FZ-1 W211 of IB-FZ-1 for details of wall penetrations l

l

ATTACHMENT A Sh. 81 BUILDING - Intermidigte Building FIRE ZONE-IB-FZ-5 ELEVATION - 305'-0" ORIENTATION. Floor CSNSTRUCTION - Reinforced Concrete THICKNESS -

l'-1" REFERENCE DRAWINGS E-421-303 PENETRATIONS (PAGE 1 OF 1 )

PENETRATING PENETRATION PENETRATING PENETRATION SERVICE DIMENSIONS SERVICE SEALANT NOTES DIMENSIONS (IF ANY)

Sama as Ceiling See Ceiling of IB-FZ-4 of IB-FZ-4 for details of floor penetrations J

r ATTACHMENT A Sh. 82 BUILDING Intermediate Building FIRE ZINE IB-FZ-5 ELEVATION - 322'-0" ORIENTATION - Ceiling (Floor Elev.)

CONSTRUCTION - Reinforced Concrete THICKNESS -

3'-3" REFERENCE DRAWINGS E-421-309 PENETRADONS (PAGE 1 OF 1 )

PENETRATING PENETRATION PENETRATING PENETRATION SERVICE DIMENSIONS SERVICE SEALANT NOTES DIMENSIONS (IF ANY)

Sleavas 10" $ (2)

Same Open Sleeves 12" $ (2)

Same Open Pips 10" $ (3) 6" $

Open Pipe & Tubing 8" x 2'-0" 1" & Pipe Open 1/2" $ Tubing Pipe 8" $

1" $ (2)

Open Crating &

5'-0" x 8'-6" 3" $

Open

' Conduit 1-1/2" $

Penetrations 1" $

Stairs 5'-0" x 13'-0" Same Open Stairwell Pipe 12" $

2" $

Open Tubing 12" $

1/4" $ (4)

Open Electrical 4" $

l-1/2" $

Embedded Conduit Sleeve 4" $

Same Embedded Capped Electrical 3/4" $

Same Embedded Conduit Sleeve 3/4" $

Same Embedded Plugged

ATTACHMENT A Sh. 83 BUILDING - Interm* dicto Building FIRE ZONE - IB-FZ-6 ELEVATION -

322'-0" ORIENTATION - Floor CONSTRUCTION - Reinforced Concrete THICKNESS-3'-3" REFERENCE DRAWINGS E-421-309 PENETRATIONS (PAGE 1 OF 1 )

PENETRATING PENETRATION PENETRATING PENETRATION SERVICE DIMENSIONS SERVICE SEALANT NOTES DIMENSIONS (IF ANY)

Stme as Ceiling See Ceiling of the of the Follow-following fire zones for ing Fire Zones:

details of ceiling / floor IB-FZ-1 penetrations:

IB-FZ-2 IB-FZ-1 IB-FZ-3 IB-FZ-2 IB-FZ-5 IB-FZ-3 IB-FZ-5 l

l l

ATTACIDfENT A Sh. 84 BUILDING Intermediate Building FIRE ZINE. IB-FZ-6 ELEVATION -

355'-0" & 347'-0" ORIENTATION - Ceiling (Floor Elev.)

C7NSTRUCTION

  • Reinforced Concrete THICKNESS -

3e-0" & 5'-0" REFERENCE DRAWINGS E-241-314 PENETRADONS (PAGE 1 OF 1 )

PENETRATING PENETRATION PENETRATING PENETRATION SERVICE DIMENSIONS SERVICE SEALANT NOTES DIMENSIONS (IF ANY)

Not Evaluated N/A N/A N/A Ceiling at El. 347'-0" (For Ceiling was not evaluated since El. 347'-0" it is exposed to the which is exterior exposed to the exterior)

For Ceiling at N/A N/A N/A See IB-FZ-7 for Floor /

El. 355'-0" -

Ceiling penetration sama as Floor details for Floor of IB-FZ-7 elevation 355'-0" l

l ATTACHMENT A Sh. 85 BUILDING. Interm2dicte Building FIRE ZONE. IB-FZ-7 ELEVATION. 355'-0" ORIENTATION. Floor CONSTRUCTION - Reinforced Concrete THICKNESS -

3'-0" REFERENCE DRAWINGS E-421-314 PENETRATIONS (PAGE 1 OF 3 )

PENETRATING PENETRATION PENETRATING PENETRATION SERVICE DIMENSIONS SERVICE SEALANT NOTES DIMENSIONS (IF ANY)

Blockout 7'-3" x Valve Operator Open (Misc Equip-5'-8-1/2" 3/4" $ Conduit m:nt)

(3) 1" $ Support Rods (2) 1" & Conduit 1-1/2" $ Conduit 1/2" $ Conduit 1" $ Pipe P1000 Unistrut (2)

Stairwell 4'-0" x 21'-6" Same Open w/ Electrical 3/4" $ Conduit Conduit & Pipe (2) 2-1/ " $ Pipe Penetrations 2

Pipe 16" $ (2) 10" $

Open Pipes 18" $ (5) 12" $

Open HVAC Duct 3'-0" x 7'-0" 2 '-0" x 4 '-0" Open Sleeve 8" $

Same Open Pipe 14" $ (2) 10" $

Open Sleeve 12" $

Same Open Blockout 5'-6" x 6'-3" Value Operator Open (Misc Equip) 1-1/2" $ Support Rod (2) 3/4" $ Conduit (3) 1" $ Conduit 1-1/2" $ Conduit 1/2" $ Conduit 1" $ Pipe P1000 Unistrut (2)

ATTACHMENT A Sh. 86 BUILDING. Interm; dicto Building FIRE ZONE. IB-FZ-7 ELEVATION.

355'-0" ORIENTATION. Floor CENSTRUCTION - Reinforced Concrete THICKNESS -

3'-0" RFFERENtE DRAWINGS E-421-314 PENETRATIONS (PAGE 2 OF 3 )

PENETRATING PENETRATION PENETRATING PENETRATION SERVICE DIMENSIONS SERVICE SEALANT NOTES DIMENSIONS (lF ANY)

Pipe 14" $

10" $

Open Pipes 18" $ (4) 12" $

Open Sleeves 8" $ (2)

Same Open Creting 6'-0" x 11'-0" Same Open Blockout 5'-6" x Value Operator Open (Misc Equip) 7'-2-1/4" l-1/2" $ Support Rod (2) 3/4" $ Conduit (3) 1" $ Conduit 1-1/2" $ Conduit 1/2" $ Conduit 1" $ Pipe P1000 Unistrut (2)

Pipes 18" $ (4) 12" $

Open Sleeves 8" $ (2)

Same Open Grating 6'-0" x 11'-0" Same Open Blockout 5'-6" x 6'-2" Value Operator Open (Misc Equip) 1-1/2" $ Support Rod (2) 3/4" & Cenduit (3) 1" $ Conduit 1-1/2" $ Conduit 1/2" $ Conduit 1" $ Pipe P1000 Unistrut (2)

ATTACHMENT A Sh. 87 BUILDING - Interm:diate Building l

l FIRE ZCNE-IB-FZ-7 ELEVATION - 355' 1" ORIENTATION - Floor CONSTRUCTION - Reinforced Concrete THICKNESS -

3'-0" REFERENCE DRAWINGS E-421-314 PENETRATIONS (PAGE 3 OF 3 )

PENETRATING PENETRATION PENETRATING PENETRATION SERVICE DIMENSIONS SERVICE SEALANT NOTES DifAENSIONS (IF ANY)

Electrical l'-5" x 2'-6" 18" Tray Grouted Tray Sleeves 12" 4 (2)

Same 14" Cover Plates Pipe 14" $

10" $

Open Pipe 18" 4 (4) 12" $

Open Sleeve 8" $

Same Open A

\\

ATTACHMENT A Sh. 88 BUILDING. Interm diate Building FIRE ZSNE. IB-FZ-8 ELEVATION.

295'-0" ORIENTATION. Ceiling (Floor Elev.)

CCNSTRUCTION. Reinforced Concrete THICKNESS -

3'-3" REFERENCE DRAWINGS N/A PENETRATIONS (PAGE 1 OF 1)

PENETRATING PENETRATION PENETRATING PENETRATION SERVICE DIMENSIONS SERVICE SEALANT NOTES DIMENSIONS (IF ANY)

Srma as Floor See Floor Penetrations of the Follow-for the following fire ing Fire Zones:

zones:

IB-FZ-1 IB-FZ-1 IB-FZ-2 IB-FZ-2 IB-FZ-3 IB-FZ-3 IB-FZ-4 IB-FZ-4

l ATTACHMENT A Sh. 89 BUILDING - Intcks Scrsin cnd Pump Hausa FIRE ZTNE. ISPH-FZ-1 ELEVATION.

308'-0" ORIENTATION. Floor C NSTRUCTION-Reinforced Concrete THICKNESS -

3'-0" REFERENCE DRAWINGS E-426-101 PENETRATIONS (PAGE 1 OF 2 )

PENETRATING PENETRATION PENETRATING PENETRATION SERVICE DIMENSIONS SERVICE SEALANT NOTES DIMENSIONS (IF ANY)

Ltdder Access 3'-6" x 3'-0" Same Checkplate

- Open to Pit Area Below Steel Cover (Not in Place)

Cables l'-4" x 8" Misc. Cables Open Cables 4'-6" x 6" Misc. Cables Open Pipe 2" $

2" $

Embedded Drains (Floor) 3" 4 (4) 3" $

Embedded

- Open to Pit Area Below Pipe 3" $

1" $

5" Cover Plate Pipe 6" $

6" $

Embedded Pump Shaft 8" $

8" $

Embedded Pipe 10" $ (2) 10" $

Embedded Pipe 12" $ (2) 12" $

Embedded Pipe 6" $ (4) 6" $

Embedded Pipe 8" $

8" $

Embedded Pipe 6" $

6" $

Embedded Pipe 21" $

21" $

Embedded Pipe 6" $

6" $

Embedded Pipes 18" $ (3) 18" $

Embedded Pipe 12" $

12" $

Embedded Pump Shafts 18" $ (2) 18" $

Embedded Pump Shafts 24" $ (2) 24" $

Embedded Pump Shafts 21" $ (3) 21" $

Embedded Drains (Funnel) 3" $ (7) 3" $

Embedded

- Open to Pit Area Below

ATTACHMENT A Sh. 90 SUILDING - Intake Screen and Pump House FIRE ZANE-ISPH-FZ-1 ELEVATION - 308"-0" ORIENTATION -

Floor CONSTRUCTION

  • Reinforced Concrete THICKNESS -

3'-0" REFERENCE DRAWINGS E-426-101 PENETRATIONS (PAGE 2 OF 2 )

PENETRATING PENETRATION PENETRATING PENETRATION SERVICE DIMENSIONS SERVICE SEALANT NOTES DIMENSIONS (IF ANY)

Pipa 12" $

12" $

Embedded Sleeve (Empty) 3" $ (5) 3" $

5" & Cover Plate Pipe 3" $ (5) 2" $

3" & Cover Plate Pipe 3" $ (5) 1" $

3" & Cover Plate Sleeve (Empty) 3" &

3" $

3" & Cover Plate Pipe 3" $

2" $

3" $ Cover Plate NOTE:

In the Pit Area Below El. 308'-0" No Barrier Seperates ISPA-FZ-1 & ISPA-FZ-2.

ATTACIDENT A Sh. 91 BUILDING. Intsks Scrasn and Pump House FIRE ZONE. ISPH-FZ-1 ELEVATION - 308'-0" ORIENTATION. West Wall CENSTRUCTION - Reinforced Concrete THICKNESS -

3'-0" REFERENCE DRAWINGS E-423-103 PENETRADONS (PAGE 1 OF 1 )

PENETRATING PENETRATION PENETRATING PENETRATION SERVICE DIMENSIONS SERVICE SEALANT NOTES DIMENSIONS (IF ANY)

Roll-up Door 9'-0" x 12'-0" Same N/A 3 hr Roll up Door with Fusible Link Door 3'-0" x 7'-0" Same N/A 3 hr Labeled Fire Door E1cetrical 1" $

1" $

Embedded Conduit Pipe 6" $

1-1/2" $

None Pipe 6" $

3-1/2" &

None Tubing (4) 6" $

3/8" $ (4)

None Blockout ( F.mpty) 2'-6" x 4'-0" Same None Electrical Tray l'-0" x 2'-0" (2) 6" trays Grouted Electrical 8" $

l-1/2" $

Open Conduit 1" $

Pipe 8" $

6" $

Open HVAC Duct 2'-0" x 4'-6" l'-9" x 4'-3" Open No Fire Damper Blockout 2'-0" x 4'-0" Same Open (Empty) l l

ATTACIDiENT A Sh. 92 BUILDING - Intake Screen and Pump House FIRE Z"NE-ISPH-FZ-2 ELEVATION - 308'-0" ORIENTATION - Floor C'"NSTRUCTION - Reinforced Concrete THICKNESS -

3'-0" REFERENCE DRAWINGS E-426-101 PENETRADONS (PAGE 1 OF 2 )

PENETRATING PENETRATION PENETRATING PENETRATION SERVICE DIMENSIONS SERVICE SEALANT NOTES DIMENSIONS (IFANY)

Pump Shaft 8" $

8" $

Embedded Pips 4" $

4" $

Embedded Drains (Floor) 3" $ (4) 3" $

Embedded

.- Open to Pit Area Below Pipe 3" $

1" $

5" $ Cover Plate Pipe 8" $ (2) 8" $

Embedded Pipe 12" 4 8" $

12" $ Cover Plate Pipe 15" $

10" $

16" $ Cover Plate (LadderAccess 3'-0" x 3'-0" Same Checkplate

- Open to Pit Area Below Steel Cover j

(Not in Place) i Pipes 30" $ (3) 30" $

Embedded Pipes 18" 4 (4) 18 $

Embedded Pipes 21" $ (3) 21" $

Embedded Pipes 12" $ (4) 12 $

Embedded Pipes 6" $ (5) 6" $

Embedded Pipes 8" $

8" $

Embedded Cables l'-4" x 6" Misc. Cables Open Cables 4'-6" x 6" Misc. Cables Open Cables 3'-6" x 6" Misc. Cables Open Cables l'-4" x 6" Misc. Cables Open l

l

F ATTACHMENT A Sh. 93 BUILDING Intake Screen end Pump Housa FIRE ZONE. ISPH-FZ-2 ELEVATION. 308'-0" ORIENTATION - Floor CONSTRUCTION. Reinforced Concrete THICKNESS.

3'-0" REFERENCE DRAWINGS E-426-101 PENETRATIONS (PAGE 2op2)

PENETRATING PENETRATION PENETRATING PENETRATION SERVICE DIMENSIONS SERVICE SEALANT NOTES DIMENSIONS (IF ANY)

Pump Shafts 26" $ (5) 26" $

Embedded Pump Shaft 16" $

16" $

Embedded Drains (Funnel) 3" $

3" $

Embedded

- Open to Pit Area Below Sleeve (Empty) 3" $ (5) 3" $

5" $ Cover Plate Pipe 3" $ (5) 2" $

3" & Cover Plate Pipe 3" $ (5) 1" $

3" $ Cover Plate Sleeve (Empty) 3" $

3" $

3" & Cover Plate Pipe 3" $

2" $

3" $ Cover Plate

r x

ATTACHMENT A Sh. 94 BUILDING. Intake Scresn and Pump Hsuse FtRE ZONE. ISPH-FZ-2 ELEVATION. 308'-0" O'RIENTATION. West Wall CONSTRUCTION. Reinforced Concrete THICKNESS.

3'-0" REFERENCE DRAWINGS E-423-103 PENETRATIONS (PAGE 1 OF 2 )

PENETRATING PENETRATION PENETRATING PENETRATION SERVICE DIMENSIONS SERVICE SEALANT NOTES DIMENSIONS (IF ANY)

Door (2) 3'-0" x 7'-0" Same N/A 3 he door frames installed however doors are not installed.

Tubing 8" $

1/4" $ (2)

Open 3/8" $ (2)

HVAC Duct 2'-0" x 4'-6" l'-9" x 4'-3" Open Sleeves (4) 2" $

Same Concrete Electrical l'-2" x 2'-1" (2) 6" Trays Grouted Tray &

1-1/2" $

Conduit Conduit Pipe 10" $

6" $

Open Blockout 2'-6" x 4'-0" Same Open

.(Empty)

Blockout l'-0" x l'-0" Same Open (Empty)

Pipe 6" $

3-1/2" $

Open Pipe 6" $

(2) 1" $

Open Tubing 6" $

(4) 3/8" $

Open Sleeves (4) 2" $

Same Open Pipe 8"

6$

Open I Blockout l'-0" x 6" Same Open

((Empty)

\\

l Tray Electrical l'-0" x 2'-G" (2) 6" Trays Kaowool l

i i

I

r N

l t.TTACHIENT A Sh. 95 9UILDING Intake Screen and Pump House FIRE ZiNE. ISPH-FZ-2 ELEVATION.

308'-0" ORIENTATION - West Wall C%NSTRUCTION. Reinforced Concrete THICKNESS.

3'-0" REFERENCE DRAWINGS E-423-103 PENETRATIONS (PAGE 2 OF 2}

PENETRATING PENETRATION PENETRATING PENETRATION SERVICE DIMENSIONS SERVICE SEALANT NOTES DIMENSIONS (IF ANY)

Pips 8" $

6" $

Open Electrical 4" $

l-1/2" $

Open Conduit Electrical 4" $

l-1/2" $

Open Conduit NOTE:

In the Pit Area Below El. 308'-0" - No Barrier Separates ISPH-FZ-1 & ISPH-FZ-2

I ATTACHMENT A Sh. 96 BUILDING - Intake Screen and Pump House FIRE ZONE - ISPH-FZ-3 ELEVATION - 308'-0" ORIENTATION - East Wall CONSTRUCTION -

THICKNESS -

Reinforced Concrete 3e-On REFERENCE DRAWINGS E-423-103 PENETRATIONS (PAGE 1 OF 1 )'

PENETRATING PENETRATION PENETRATING PENETRATION SERVICE DIMENSIONS SERVICE SEALANT NOTES DIMENSIONS (IF ANY)

Same as West See West Wall of Wall of ISPH-ISPH-FZ-1 & ISPH-FZ-2 FZ-1 & ISPH-for details of wall FZ-2 penetrations l

l L

J