ML20082K217

From kanterella
Jump to navigation Jump to search
Forwards Application for Amend to License DPR-34,revising Decommissioning TS to Reflect Organizational Changes & Incorporate Editorial Corrections Previously Discussed W/ NRC
ML20082K217
Person / Time
Site: Fort Saint Vrain Xcel Energy icon.png
Issue date: 04/14/1995
From: Crawford A
PUBLIC SERVICE CO. OF COLORADO
To: Weber M
NRC OFFICE OF INFORMATION RESOURCES MANAGEMENT (IRM), NRC OFFICE OF NUCLEAR MATERIAL SAFETY & SAFEGUARDS (NMSS)
Shared Package
ML20082K220 List:
References
P-95037, NUDOCS 9504190162
Download: ML20082K217 (3)


Text

-.

i Public Servics Company of Colorado P.O. Box 840 Denver, Co 80201-0840 A. Clegg Crawford April 14.1995 vice Pro.uioni Fort St. Vrain Engineering and OP**"* support P-95037 U. S. Nuclear Regulatory Commission i l

ATrN: Document Control Desk Washington, D. C. 20555 ATFN: Mr. Michael F. Weber, Chief l Decommissioning and Regulatory 1

- Issues Branch Docket No. 50-267 i

e l

SUBJECT:

Proposed Amendment to Decommissioning Technical Specifications j i

Dear Mr. Weber:

This letter submits proposed changes to the Fort St. Vrain (FSV) Decommissioning Technical Specifications (DTS), to rcilect organizational changes at Public Service Company of Colorado (PSC), and to incorporate several editorial corrections that had previously been discussed with the NRC.

PSC has recently undertaken a corporate restructuring and, in addition, is preparing to  :

, repower the site with natural gas-powered combustion turbines and heat recovery boilers. I As part of these projects, various organizational changes are being made that impact the membership of the Decommissioning Safety Review Committee, as described in DTS f

Administrative Control 5.3.1.

The proposed DTS changes described above are included in the following attachments: j i

Attachment 1 - Summary of Proposed Changes i Attachment 2 - Proposed Changes Attachment 3 - No Significant Hazards Consideration Evaluation PSC has determined that the proposed changes included in this submittal involve No Significant Hazards Consideration, as described in 10 CFR 50.92.

9504190162 950414 7 i ADOCK 0500

{DR s < t

P-95037 April 14,1995 Page 2 l

PSC requests NRC approval of the attached proposed Decommissioning Technical Specification amendment to support changes in the FSV organization and make editorial ,

corrections. If you have any questions concerning this submittal, please contact Mr. M.

H. Holmes at (303) 620-1701.

1 i

Very truly yours, .

l Y

' A. Clegg Crawford Vice President ,

Engineering and Operations Support ACC/SWC Attachments l

cc: w/ attachments Regional Administrator, Region IV Mr. Robert M. Quillin, Director Radiation Control Division Colorado Department of Public Health and Environment

UNITED STATES OF AMERICA NUCLEAR REGULATORY COMMISSION in the Matter of the Facility Operating Ucense )

of )

Public Service Company of Colorado ) Docket No. 50-267 Fort St. Vrain Unit No.1 )

AFFIDAVIT A. Clegg Crawford, being first duly sworn, deposes and says: That he is Vice President, .

Engineering and Operations Support, of Public Service Company of Colorado, the Ucensee herein, that he has read the foregoing Application for Amendment to Appendix A of the Facility Operating Ucense and knows the contents thereof, and that the statements and matters set forth therein are true and correct to the best of his knowledge, information and belief.

Y A. Clegg Crawford v Vice President Engineering & Operations Support STATE OF ['#

  1. [39de )

COUNTY OF [?)))uJtJ'u )

Subscribed and sworn to before me, a Notary Public on this

/L/!.d day of //g// ,1995 i

MlAD/ $bwwJ Notary Pu6lic "

My commission expires 7/Ol/dsn2A 29 , 19 95

____