Cycle 7 Colr
ML20082K156
Person / Time
Site: Catawba Duke Energy icon.png
Issue date: 04/12/1995
From: Carroll M, Clark R, Thomas S
DUKE POWER CO.
To:
Shared Package
ML20082K153 List:
References
CNEI-0400-25, CNEI-0400-25-R04, CNEI-400-25, CNEI-400-25-R4, NUDOCS 9504190099
Download: ML20082K156 (5)


Text

- _ _ _ - _ _ _ _ _ _ _ _ _ - _ _ _ _ _ _ _ _ _

CNEI-Ot00-25 Page 1 of 19 Rev.4

?

Catawba Unit 2, Cycle 7 i

Core Operating Limits Report

~

April 1995 d

4 i

Duke Power Company 1

DATE PREPARED BY:

Nb b 4!/z./Cff~

CHECKED BY:

/

O

/ Af[

1 M/!

7'//&/ff CHECKED BY:

APPROVED BY:

I l-f'(

i QA CONDITION 1 1

NOTE This document does not contain information that affects the results and conclusions presented in the C2C7 Reload Report, Safety Analysis.

9504190099 950412 PDR ADOCK 05000414 P

PDR

- Cctawba 2 Cycle 7 Core Operatirg Limits Report CNEI-0400-25 Page 2 of 19 Rev.4 INSERTION SHEET 1

Remove Jmign 1

pages 1,2,3, rev 3; 5,6, rev 2 pages 1,2,3,5,5; rev 4 i

4 4

t t

6 i

1 I

i e

i r

h 4

l

.s i

j l

i a

n l

1

?

N I

1 J

,f W

e i

4 I

i a

i I

Cctawba 2 Cycle 7 Core Operatiig Limits Report CNEI-0400-25 Page 3 of 19 Rev.4 REVISION LOG

{

Revision Effective Date Comment OriginalIssue 15 February 1993 C2C6 COLR' Revision 1-14 April 1994 C2C6 COLR rev.

i Revision 2 19 May 1994 C2C7 COLR j

Revision 3 24 October 1994 C2C7 COLR rev

)

Revision 4 12 April 1995 C207 COLR rev i

l l

G a

r

Catawba 2 Cycle 7 Core Operati g Limits Report CNEI4400-25 Page 5 of 19 '

Rev.4 1.1 Opdrating Limits The cycle-specific parameter limits for the specifications listed in section 1.0 are presented

,4 in the following subsections. These limits have been developed using-NRC-approved methodologies specified in Technical Specification 6.9.1.9.

4 2.0 Reactor Trip System Instrumentation Setpoints (Specification 2.2.1) 2.1 Overtemperature AT Setpoint Parameter Values 3

Parameter Value Overtemperature AT reactor trip setpoint K = 1.1953 i

i d

Overtemperature AT reactor trip heatup setpoint K = 0.03163/aF 2

penalty coefficient i

I Overtemperature AT stactor trip depressurization K = 0.001414/ psi 3

setpoint penalty coefficient 2

i Measured reactor vessel AT lead / lag time t = 8 sec.,

i constants T = 3 sec.

2 i

Measured ATlag time constant T = 0 sec.

3 i

Measured reactor vessel average temperature T = 22 sec.,

4 lead / lag time constants i = 4 sec.

s Measured reactor vessel avefage temperature lag T = 0 sec.

6 l

time constant l

'.i f (AI) " positive" breakpoint '

= 3.0% AI i

l f (AI) " negative" breakpoint

= -39.9% AI 3

1 f (AI) " positive" slope

= 1.525% AT / % AI i

o f (AI) " negative" slope

= 3.910% ATo/ % AI i

i i

J D

Cctawba 2 Cycle 7 Core Oper: ting Limits Report CNEI-0400-25 Page 6 of 19 Rev.4 j

2.2 Overpower AT Setpoint Parameter Values Parameter ygla 4

Overpower AT reactor trip setpoint K = 1.0819 4

1 Overpower AT reactor trip heatup setpoint penalty K = 0.001291/oF 6

coefficient (for T > 590.8 *F) 4 Overpower AT reactor trip heatup setpoint penalty K = 0.0/*F 6

j coefficient (for Ts 590.8 'F)

Measured reactor vessel AT lead / lag time T = 8 sec.,

3 Constants T = 3 sec.

2

[

Measured ATlagtime constant T = 0 sec.

3 Measured mactor vessel average temperature lag T = 0 sec.

6 time constant i

Measured reactor vessel average temperature rate-T = 10 sec.

7 lag time constant i

f (AI) " Positive" breakpoint

= 35.0% AI i

2 f (AI) " negative" breakpoint

= -35.0% AI 2

i f (AI) " Positive" slope

=7.0% ATg % AI 2

i f (AI) " negative" slope

= 7.0% ATg % AI 2

I t

s t

i 4