Category:MONTHLY OPERATING ANALYSIS REPORT
MONTHYEARML20217F9921999-09-30030 September 1999 Monthly Operating Rept for Sept 1999 for Grand Gulf Nuclear Station,Unit 1.With ML20216E4881999-08-31031 August 1999 Monthly Operating Rept for Aug 1999 for Grand Gulf Nuclear Station.With ML20211A6921999-07-31031 July 1999 Monthly Operating Rept for July 1999 for Grand Gulf Nuclear Station,Unit 1.With ML20209G0691999-06-30030 June 1999 Monthly Operating Rept for June 1999 for Grand Gulf Nuclear Station,Unit 1.With ML20196A1161999-05-31031 May 1999 Monthly Operating Rept for May 1999 for Grand Gulf Nuclear Station.With ML20206Q4831999-04-30030 April 1999 Monthly Operating Rept for Apr 1999 for Grand Gulf Nuclear Station Unit 1.With ML20205P8771999-03-31031 March 1999 Monthly Operating Rept for Mar 1999 for Grand Gulf Nuclear Station,Unit 1.With ML20207K5141999-02-28028 February 1999 Monthly Operating Rept for Feb 1999 for Grand Gulf Nuclear Station,Unit 1.With ML20206R9501998-12-31031 December 1998 Monthly Operating Rept for Dec 1998 for Grand Gulf Nuclear Station,Unit 1.With ML20198E2481998-11-30030 November 1998 Monthly Operating Rept for Nov 1998 for Grand Gulf Nuclear Station,Unit 1.With ML20195F4801998-10-31031 October 1998 Monthly Operating Rept for Oct 1998 for Grand Gulf Nuclear Station,Unit 1.With ML20154K2391998-09-30030 September 1998 Monthly Operating Rept for Sept 1998 for Grand Gulf Nuclear Station Unit 1.With ML20153B2161998-08-31031 August 1998 Monthly Operating Rept for Aug 1998 for Grand Gulf Nuclear Station,Unit 1.With ML20237B6661998-07-31031 July 1998 Monthly Operating Rept for Jul 1998 for Grand Gulf Nuclear Station,Unit 1 ML20236R0231998-06-30030 June 1998 Monthly Operating Rept for June 1998 for Grand Gulf Nuclear Station,Unit 1 ML20249B1251998-05-31031 May 1998 Monthly Operating Rept for May 1998 for Grand Gulf Nuclear Station,Unit 1 ML20247F3591998-04-30030 April 1998 Monthly Operating Rept for Apr 1998 for Grand Gulf Nuclear Plant,Unit 1 ML20217A0291998-03-31031 March 1998 Monthly Operating Rept for Mar 1998 for Grand Gulf Nuclear Sation,Unit 1 ML20216J2021998-02-28028 February 1998 Monthly Operating Rept for Feb 1998 for Grand Gulf Nuclear Station,Unit 1 ML20203A2891998-01-31031 January 1998 Monthly Operating Rept for Jan 1998 for Grand Gulf Nuclear Station ML20198P1121997-12-31031 December 1997 Monthly Operating Rept for Dec 1997 for Grand Gulf Nuclear Station,Unit 1 ML20203K4031997-11-30030 November 1997 Monthly Operating Rept for Nov 1997 for Grand Gulf Nuclear Station,Unit 1 ML20199K0611997-10-31031 October 1997 Monthly Operating Rept for Oct 1997 for Grand Gulf Nuclear Station,Unit 1 ML20198J8911997-09-30030 September 1997 Monthly Operating Rept for Sept 1997 for Grand Gulf Nuclear Station,Unit 1 ML20210V0621997-08-31031 August 1997 Monthly Operating Rept for Aug 1997 for GGNS ML20210K5671997-07-31031 July 1997 Monthly Operating Rept for July 1997 for GGNS ML20149K0621997-06-30030 June 1997 Monthly Operating Rept for June 1997 for GGNS ML20148L2591997-05-31031 May 1997 Monthly Operating Rept for May 1997 for GGNS Unit 1 ML20141E3541997-04-30030 April 1997 Monthly Operating Rept for Apr 1997 for Grand Gulf Nuclear Station Unit 1 ML20137X7881997-03-31031 March 1997 Monthly Operating Rept for Mar 1997 for Grand Gulf Nuclear Station,Unit 1 ML20147E6201997-02-28028 February 1997 Monthly Operating Rept for Feb 1997 for Grand Gulf Nuclear Station,Unit 1 ML20134Q2281997-01-31031 January 1997 Monthly Operating Rept for Jan 1997 for Grand Gulf Nuclear Station,Unit 1 ML20133M1111996-12-31031 December 1996 Monthly Operating Rept for Dec 1996 for Grand Gulf Nuclear Station,Unit 1 ML20132H1281996-11-30030 November 1996 Monthly Operating Rept for Nov 1996 for Grand Gulf Nuclear Station Unit 1 ML20134M0571996-10-31031 October 1996 Monthly Operating Rept for Oct 1996 for Grand Gulf Nuclear Station Unit 1 ML20129B6881996-09-30030 September 1996 Monthly Operating Rept for Sept 1996 for Grand Gulf Nuclear Station Unit 1 ML20117P2621996-08-31031 August 1996 Monthly Operating Rept for Aug 1996 for Grand Gulf Nuclear Station ML20116N1851996-07-31031 July 1996 Monthly Operating Rept for July 1996 for GGNS Unit 1 ML20115H0661996-06-30030 June 1996 Monthly Operating Rept for June 1996 for GGNS ML20112J1881996-05-31031 May 1996 Monthly Operating Rept for May 1996 for Grand Gulf Nuclear Station Unit 1 ML20111B2381996-04-30030 April 1996 Monthly Operating Rept for Apr 1996 for Grand Gulf Nuclear Station Unit 1 ML20106J8921996-03-31031 March 1996 Monthly Operating Rept for Mar 1996 for Grand Gulf Nuclear Station Unit 1 ML20106H0851996-02-29029 February 1996 Monthly Operating Rept for Feb 1996 for Grand Gulf Nuclear Station,Unit 1 ML20100G8641996-01-31031 January 1996 Monthly Operating Rept for Jan 1996 for GGNS Unit 1 ML20096E6261995-12-31031 December 1995 Monthly Operating Rept for Dec 1995 for Grand Gulf Nuclear Station Unit 1 ML20095F4051995-11-30030 November 1995 Monthly Operating Rept for Nov 1995 for Grand Gulf Nuclear Station ML20094L0531995-10-31031 October 1995 Monthly Operating Rept for Oct 1995 for GGNS Unit 1 ML20093E6211995-09-30030 September 1995 Monthly Operating Rept for Sept 1995 for Grand Gulf Nuclear Station ML20087K0011995-07-31031 July 1995 Monthly Operating Rept for July 1995 for Grand Gulf Nuclear Station ML20086K0371995-06-30030 June 1995 Monthly Operating Rept for June 1995 for Grand Gulf Nuclear Station Unit 1 1999-09-30
[Table view] Category:TEXT-SAFETY REPORT
MONTHYEARML20217F9921999-09-30030 September 1999 Monthly Operating Rept for Sept 1999 for Grand Gulf Nuclear Station,Unit 1.With ML20212F5641999-09-23023 September 1999 SER Concluding That All of ampacity-related Concerns Have Been Resolved & Licensee Provided Adequate Technical Basis to Assure That All of Thermo-Lag Fire Barrier Encl Cables Operating within Acceptable Ampacity Limits ML20211Q3171999-09-0909 September 1999 Safety Evaluation Accepting BWROG Rept, Prediction of Onset of Fission Gas Release from Fuel in Generic BWR, Dtd July 1996 ML20216E4881999-08-31031 August 1999 Monthly Operating Rept for Aug 1999 for Grand Gulf Nuclear Station.With ML20211A6921999-07-31031 July 1999 Monthly Operating Rept for July 1999 for Grand Gulf Nuclear Station,Unit 1.With ML20209J1961999-07-12012 July 1999 Special Rept 99-001:on 990528,smoke Detectors Failed to Alarm During Performance of Routine Channel Functional Testing.Applicable TRM Interim Compensatory Measure of Establishing Roving Hourly Fire Patrol Was Implemented ML20196K4981999-07-0101 July 1999 Safety Evaluation Authorizing PRR-E12-01,PRR-E21-01, PRR-P75-01,PRR-P81-01,VRR-B21-01,VRR-B21-02,VRR-E38-01 & VRR-E51-01.Concludes That Alternatives Proposed by EOI Acceptable ML20209G0691999-06-30030 June 1999 Monthly Operating Rept for June 1999 for Grand Gulf Nuclear Station,Unit 1.With ML20196A1161999-05-31031 May 1999 Monthly Operating Rept for May 1999 for Grand Gulf Nuclear Station.With ML20206Q4831999-04-30030 April 1999 Monthly Operating Rept for Apr 1999 for Grand Gulf Nuclear Station Unit 1.With ML20206J1201999-04-30030 April 1999 Redacted ME-98-001-00, Pressure Locking & Thermal Binding Test Program on Two Gate Valves with Limitorque Actuators ML18016A9011999-04-12012 April 1999 Part 21 Rept Re Defect in Component of DSRV-16-4,Enterprise DG Sys.Caused by Potential Problem with Connecting Rod Assemblies Built Since 1986,that Have Been Converted to Use Prestressed Fasteners.Affected Rods Should Be Inspected ML20205P8771999-03-31031 March 1999 Monthly Operating Rept for Mar 1999 for Grand Gulf Nuclear Station,Unit 1.With ML20207M9231999-03-12012 March 1999 Amended Part 21 Rept Re Cooper-Bessemer Ksv EDG Power Piston Failure.Total of 198 or More Pistons Have Been Measured at Seven Different Sites.All Potentially Defective Pistons Have Been Removed from Svc Based on Encl Results ML20207K5141999-02-28028 February 1999 Monthly Operating Rept for Feb 1999 for Grand Gulf Nuclear Station,Unit 1.With ML20206T7991999-01-31031 January 1999 Iodine Revolatizitation in Grand Gulf Loca ML20207A8301998-12-31031 December 1998 1998 Annual Operating Rept for Ggns,Unit 1 ML20206R9501998-12-31031 December 1998 Monthly Operating Rept for Dec 1998 for Grand Gulf Nuclear Station,Unit 1.With ML20206D7721998-12-31031 December 1998 South Mississippi Electric Power Association 1998 Annual Rept ML20198E2481998-11-30030 November 1998 Monthly Operating Rept for Nov 1998 for Grand Gulf Nuclear Station,Unit 1.With ML20195F4121998-11-13013 November 1998 Rev 16 to GGNS-TOP-1A, Operational QA Manual (Oqam) ML20195C4841998-11-0606 November 1998 SER Accepting QA Program Change to Consolidate Four Existing QA Programs for Arkansas Nuclear One,Grand Gulf Nuclear Station,River Bend Station & Waterford 3 Steam Electric Station Into Single QA Program ML20195C2791998-11-0505 November 1998 BWR Feedwater Nozzle Inservice Insp Summary Rept for GGNS, NUREG-0619-00006 ML20195F4801998-10-31031 October 1998 Monthly Operating Rept for Oct 1998 for Grand Gulf Nuclear Station,Unit 1.With ML20155C1351998-10-26026 October 1998 Rev B to Entergy QA Program Manual ML20154K2391998-09-30030 September 1998 Monthly Operating Rept for Sept 1998 for Grand Gulf Nuclear Station Unit 1.With ML20155F1961998-09-0101 September 1998 Engineering Rept for Evaluation of BWR CR Drive Mounting Flange Cap Screw ML20153B2161998-08-31031 August 1998 Monthly Operating Rept for Aug 1998 for Grand Gulf Nuclear Station,Unit 1.With ML20237B6661998-07-31031 July 1998 Monthly Operating Rept for Jul 1998 for Grand Gulf Nuclear Station,Unit 1 ML20236R0231998-06-30030 June 1998 Monthly Operating Rept for June 1998 for Grand Gulf Nuclear Station,Unit 1 ML20155J0811998-05-31031 May 1998 10CFR50.59 SE for Period Jan 1997 - May 1998 ML20249B1251998-05-31031 May 1998 Monthly Operating Rept for May 1998 for Grand Gulf Nuclear Station,Unit 1 ML20248B6261998-05-11011 May 1998 Rev 6 to Grand Gulf Nuclear Station COLR Safety-Related ML20217Q6701998-05-0606 May 1998 SER Approving Proposed Postponement of Beginning Augmented Exam Requirements of 10CFR50.55a(g)(6)(ii)(A)(2) at Grand Gulf for Circumferential Shell Welds for Two Operating Cycles ML20206J1271998-04-30030 April 1998 Pressure Locking Thrust Evaluation Methodology for Flexible Wedge Gate Valves ML20247F3591998-04-30030 April 1998 Monthly Operating Rept for Apr 1998 for Grand Gulf Nuclear Plant,Unit 1 ML20217M8951998-04-30030 April 1998 QA Program Manual ML20217P8281998-04-0707 April 1998 Safety Evaluation Accepting Relief Authorization for Alternative to Requirements of ASME Section Xi,Subarticle IWA-5250 Bolting Exam for Plants,Per 10CFR50.55a(a)(3)(i) ML20217P0381998-04-0606 April 1998 Safety Evaluation Supporting Amend 135 to License NPF-29 ML20217A0291998-03-31031 March 1998 Monthly Operating Rept for Mar 1998 for Grand Gulf Nuclear Sation,Unit 1 ML20216J4211998-03-18018 March 1998 SER Approving Alternative to Insp of Reactor Pressure Vessel Circumferential Welds for Grand Gulf Nuclear Station ML20216J2021998-02-28028 February 1998 Monthly Operating Rept for Feb 1998 for Grand Gulf Nuclear Station,Unit 1 ML20203A2891998-01-31031 January 1998 Monthly Operating Rept for Jan 1998 for Grand Gulf Nuclear Station ML20247B4111997-12-31031 December 1997 1997 Annual Financial Rept for South Mississippi Electric Power Association ML20203H9741997-12-31031 December 1997 1997 Annual Operating Rept, for Ggns,Unit 1 ML20198P1121997-12-31031 December 1997 Monthly Operating Rept for Dec 1997 for Grand Gulf Nuclear Station,Unit 1 ML20203B5581997-12-0404 December 1997 Special Rept 97-003:on 971111,valid Failure of Div 2 EDG Occurred,Due to Jacket Water Leak.Failure Reported,Per Plant Technical Requirements Manual Section 7.7.2.2 ML20203K4031997-11-30030 November 1997 Monthly Operating Rept for Nov 1997 for Grand Gulf Nuclear Station,Unit 1 ML20199H3711997-11-19019 November 1997 SER Accepting Approving Request Relief from Requirements of Section XI, Rule for Inservice Insp of NPP Components, of ASME for Current or New 10-year Inservice Insp Interval IAW 50.55(a)(3)(i) of 10CFR50 ML20199F3431997-11-18018 November 1997 SER Accepting Rev 15 of Operational Quality Assurance Manual for Grand Gulf Nuclear Station,Unit 1 1999-09-09
[Table view] |
Text
o ,
- g. c. ., o,.a.o:, i.
t h
- _ ENTERGY
-- eo eox758 Pon Gbson, MS 39150
.-f . Tel 601437 2800
. a C. R. Hutchinson Vre PrecAmt Owatre Graiv) Gulf Nucear S' anon April 10, 1995 U.S. Nuclear Regulatory Commission Mail Station P1-137
- Washington, D.C. 20555 Attention: Document Control Desk
SUBJECT:
Grand Gulf Nuclear Station Unit i Docket No. 50-416 Ucense No. NPF-29 Monthly Operating Report GNRO-95/000 51 Gentlenen:
In accordance with the requirement of Technical Specification 6.9.1.10, Entergy Operations is providing the Monthly Operating Report for Grand Gulf Nuclear Station Unit i for March 1995.
If you have any questions or require additional information, please contact this office.
Yours truly, g [
7
/ ) 7. ' . ' u !;
^
I
,!rlU/h,Y ~ ^ ~
j..
CRH/TMC attachments: 1. Operating Status
- 2. Average Daily Power Level
- 3. Unit Shutdown and Power Reductions cc: (See Next Page) l
~j'$0NE0 i
i 9504170229 950331 'p /
I i
PDR ADOCK 05000416 '
R PDR t l l
k-Apr'il 10, 1995
' GNRO-95/00051 Page 2 of 3 cc: M . O. C. Hintz (w/a)
Mr. R. B. McGehee (w/a)
Mr. N. S. Reynolds (w/a)
Mr. J. E. Tedrow (w/a)
Mr. H. L. Thomas (w/o)
Mr. Stewart D. Ebneter (w/a)
Regional Administrator U.S. Nuclear Regulatory Commission Region ll 101 Marietta St., N.W., Suite 2900 Atlanta, Georgia 30323 Mr. P. W. O'Connor, Project Manager ':
Office of Nuclear Reactor Regulation U.S. Nuclear Regulatory Commission Mail Stop 13H3 Washington, D.C. 20555 h
l
r I -
Att chm:nt 1 to GNRO-95/00051 4
.' . DOCKET NO 50-416 y DATE 04/04/95 COMPLETED BY S. D. Lin TELEPHONE (601) 437-6793 QPERATING STATUS
- 1. Unit Name: GGNS UNIT 1
- 2. Reporting Period: .Jdarch 1995
- 3. Licensed Thermal Power (MWt): 3833 MWT
- 4. Nameplate Rating (Gross MWe): 1372.5 MWE E. Design Electrical Rating (Net MWe): 1250 MWE
- 6. Maximum Dependable Capacity (Gross MWe): 1190 MWE
- 7. Maximum Dependable Capacity (Net MWe): 1143 MWE
- 8. If changes occur in Capacity Ratings (Items 3 through 7) Since Last Report. Give Reason: N/A
- 9. Power Level To Which Restricted, If Any (Net MWe): N/A
- 10. Reasons For Restrictions, if Any: N/A This Month Yr to Date Cumulative ;
- 11. Hours in Reporting Period 744 2.160 91.576
- 12. Number of Hours Reactor was Critical 719.5 2.135.5 75.286.6
- 13. Reactor Reserve Shutdown Hours O O O
- 14. Hours Generator On-Line 706.7 2.122.7 72.469.1
- 15. Unit Reserve Shutdown Hours O O O
- 16. Gross Thermal Energy Generated (MWH) 2.586.122 _2.988.522 256.832.017
- 17. Gross Electrical Energy Generated (MWH) 836.260 2.604.784 81.926.283
- 18. Net Electrical Energy Generated (MWH) 801.861 2.500.504 78.486.645
- 19. Unit Service Factor 95.0 98.3 81.2
- 20. Unit Availability Factor 95.0 98.3 81.2
- 21. Unit Capacity Factor (Using MDC Net) 94.3 101.3 79.0
- 22. Unit Capacity Factor (Using DER Net) 86.2 92.6 71.8
- 23. Unit Forced Outage Rate 5.Q. 1.7 6.3
- 24. Shutdowns Scheduled Over Next 6 Months (Type, Date, and Duration of Each):
Bafuelino Outage # 7 beginnina on 04/15/94 O 0000 hour0 days <br />0 hours <br />0 weeks <br />0 months <br /> for a duration of 39 davs
- 25. If Shut Down At End of Report Period. Estimated Date of Startup:
- 26. Units in Test Status (Prior to Commercial Operation).
Forecast Achieved INITIAL CRITICALITY 08/18/82 INITIAL ELECTRICITY 10/20/84 COMMERCIAL OPERATION 07/01/85
I Att chm:nt 2 to GNRO-95/00051
. . DOCKET NO 50-416 DATE 04/04/95 COMPLETED BY S. D. Lin TELEPHONE (601) 437-6793 MONTH _ March 1995 DAY AVERAGE DAILY POWER LEVEL DAY AVERAGE DAILY POWER LEVEL (MWo-Net) (MWe-Net) 1 1172 17 28 2 1082 18 486 3 1207 19 1079 4 1049 20 1139 5 1154 21 1178 6 1060 22 1180 7 1068 23 1179 8 1210 24 1189 9 1209 25 1189 10 1205 26 1180 11 1194 27 1192 12 1189 28 1199 13 1187 29 1201 14 1192 30 1197 15 1193 31 1201 16 223
, .N Attachment 3 to GNh10-95/qMXM 1 :
UNIT SHUTDOWNS AND POWER REDUCTIONS DOCKET NO. 50-416 UNIT NAME GGNS Unit 1 DATE 04/tM/95 COMPLETED BY S. D. Lin TELEPHONE (60lM37-6793 REPORT MONTH March 1995 No. Date Type (1) Duration Reason Method M Licensee System Code Component Cause & Corrective Action To Hours (2) Shutting Event Report # (4) Code Prevent Recurrence (C&CA)
Down Reactor (5)
(3)95-001 03/16/95 F 37.3 A 3 954XM AA SOL Reactor scram caused by pmched-wire ground fault in RCIC minimum flow valve E51F1)19 and intermittent ground of backww valve ClIFl10A which energized during Division II survedlance (halfScramexisting). Immabte corrective actions included reworkmg the ground on the RCIC valve and replacing the backup scram valve solenoid. Also, the conduit going to the solenoid was sealed to prevent moisture intrusion. A Material Nonconformance Report was initiated to address the presence of condensation in the solenoid housmg.
I 2 3 4 5 F: Forced Reason: Method: Exhibit G - Instructions for Preparation of Exhibit 1 - Same Source S: Scheduled A-Equipment Failure (Explain) 1-Manual Data Entry Sheets for Licensee Event B-Maintenance or Test 2-Manual Scram Report (LER) File (NUREG-0161)
C-Refueling 3-Automatic Scram D-Regulatory Restriction 4-Continued E-Operator Training & 5-Reduced load Licensing Examination 6-Other F-Administrative G-Operational Error (Explain)
H-Other (Explain)