ML20082G092

From kanterella
Jump to navigation Jump to search
Forwards Revised Detailed Control Room Design Review Program Plan in Response to Generic Ltr 82-33 & Suppl 1 to NUREG-0737
ML20082G092
Person / Time
Site: Wolf Creek, Callaway, 05000000
Issue date: 11/28/1983
From: Petrick N
STANDARDIZED NUCLEAR UNIT POWER PLANT SYSTEM
To: Harold Denton
NRC
Shared Package
ML20082G097 List:
References
RTR-NUREG-0737, RTR-NUREG-737 83-0062, 83-62, GL-82-33, NUDOCS 8311300068
Download: ML20082G092 (1)


Text

.

e.

C

' SNUPPS siene.reises w.i e unit Power Plant System 5 choke ch rry need Nicholas A. Petrick

  • "d N Executive Director November 28, 1983 SLNRC 83 0062 FILE: 0671.1 SUBJ: SNUPPS Program Plan for the DCRDR Mr. Harold R. Denton U.S. Nuclear Regulatory Commission Washington, D.C. 20555

Reference:

SLNRC 83-0035, 06/30/83: Same Subject

Dear Mr. Denton:

The reference letter provided the subject report dated June 1983.

A meeting was held in Rockville between SNUPPS and the NRC on October 25, 1983 to discuss NRC comments on the SNUPPS Detailed Control Room Design Review, of which the Program Plan is a part.

This attachment provides a revised SNUPPS Program Plan incorporating comments made during the October 25th meeting.

Very ruly yours,

-C&< s t Nicholas A. Petrick DJK/dck/8a22 Attachment cc:

D. F. Schnell UE G. L. Koester KGE D. T. McPhee KCPL W. S. Schum USNRC/WC J. H. Neisler UENRC/ CAL W. Middleton NRC 8311300068 831128 PDR ADOCK 05000482 F

PDR h

Vn