ML20082F697

From kanterella
Jump to navigation Jump to search
Ro:On 831119,while Performing Investigation Into Why High Oxygen Level Existed in One Gas Decay Tank,Action Statement (B) of Tech Spec 3.11.2.5 Not Complied With.On 831103,waste Gas Holdup Tank Concentration Exceeded 4%
ML20082F697
Person / Time
Site: Cook  American Electric Power icon.png
Issue date: 11/21/1983
From: Will Smith
INDIANA MICHIGAN POWER CO. (FORMERLY INDIANA & MICHIG
To: James Keppler
NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION III)
References
NUDOCS 8311290208
Download: ML20082F697 (1)


Text

tu.auf kp-1 y,~g,,. Ilt0 LANA G RflCHIGAN ELECTRIC COMPANY DONALD C. COOK NUCLEAR PLANT P.O. Box 4!.3, Bridgman, Michigwa 49106 g/jI/d, (616) 465 0 01 November 21, 1983 Mr. J.G. Keppler, Regional Administrator United States Nuclear Regulatory Commissior Region III 799 Roosevelt Road Glen Ellyn, 15 60137 Operating License DPR-58/74 Docket No. 50-315/316

Dear Mr. Keppler:

This is to confirm a telephone report made by our Operations Superintendent, lir. K.R. Baker, to Mr. O. Merrill, NRC Operations Center Duty Officer, at 1018 hours0.0118 days <br />0.283 hours <br />0.00168 weeks <br />3.87349e-4 months <br /> on November 19, 1983. At this time Mr. Merrill was advised that while performing an investigation into why a high oxygen level had existed in one of the Plant's gas decay tanks it was discovered that Action Statement (b) of Technical Specification Section 3.11.2.5 was not complied with.

This Technical Specification requires that when the concentration of oxygen in the waste gas holdup system or tank is greater than 4% by volume and greater than 4% hydrogen by volume without delay suspend all additions of waste gases to the system or tank and reduce the concentration of oxygen to less than or equel to 3% or the concentration of hydrogen to less than or equal to 45, within 96 hours0.00111 days <br />0.0267 hours <br />1.587302e-4 weeks <br />3.6528e-5 months <br /> in the system or tank. On November 3, 1983, l while venting Unit Two's volume control tank to onc of the Plant's gas decay tanks (No. 3) the concentration in the waste gas holdup l tank was analyzed and found to exceed 4% for both oxygen and hydrogen, however, additions to this system were not suspended and filling of this tank continued for a period of sixteen (16) hours.

As required by Technical Specification 6.9.1.12, a follow-up report will be submitted within fourteen (14) days.

Sincerely, y)./[}h'eh,-Jr.

-- - ., - . _ . . . _ . , . _ =

w.c.SmivM:F-Plant Manager

/cbm cc: See attached distribution d

5 $PY N l~ 8311290208 831121 PDR ADOCK 05000315 h i

S PDR h@ba I . , - . ___

- ~ _

cc:. John E. Dolan '

H.P. AleXiJh R.F. Kroeger 11 . Brugger

- - " ~ ~ ~ * - - - -

t=gry15tyscar %snM=- = -- - ~ *=-

R.C. Callen, HPSC G. Charnoff, Esq.

J.M. Hennigan "

R.O. Bruggeo, EPRI INPO PNSRC J.?. Stietzel E.L. Townley Dir., IE (40 copies)

_ Dir.4 HIPC (4 copies) _ _ _ ,

F 4

4

'l