ML20082F577

From kanterella
Jump to navigation Jump to search
Advises That First New Spent Fuel Pool Rack Containing Boraflex Installed on 831119,in Response to License Condition in Amend 75 to License DPR-40
ML20082F577
Person / Time
Site: Fort Calhoun 
Issue date: 11/23/1983
From: William Jones
OMAHA PUBLIC POWER DISTRICT
To: John Miller
Office of Nuclear Reactor Regulation
References
LIC-83-295, NUDOCS 8311290152
Download: ML20082F577 (2)


Text

-

w l

l l

1 Omaha Public Power District 1623 Harney Omaha, Nebraska 68102 402/536-4000 November 23, 1983 LIC-83-295 Mr. James R.

Miller, Chief U.

S.

Nuclear Regulatory Commission Office of Nuclear Reactor Regulation l

Division of Licensing l

Operating Reactors Branch No. 3 Washington, D.C.

20555

Reference:

Docket No. 50-285

Dear Mr. Miller:

Spent Fuel Pool Roracking at the Fort Calhoun Station In a letter dated September 9, 1983, the Commission issued Amendment No. 75 to Facility Operating License No. DPR-40 for the Fort Calhoun Station.

This amendment to the License and Technical Specifications was requested as a part of the reracking of the spent fuel pool at the Fort Calhoun Station.

A license condition was added to that amendment which required that the District notify the Commission in writing within two weeks after the event as to the follow-ing:

(1)

Installation date of the first new rack that contains Boraflex.

(2)

Installation date of the first new rack that does not j

contain Boraflex.

(3)

Installation date of the last new rack.

0311290152 831123 PDR ADOCK 05000285 P

PDR

'h0 l

l I

b i

45 5124 Employment with Equal Opportunity maie: remate

=

Mr. James R.

Miller LIC-83-295 Page Two i

In response to this request, the District hereby notifies

(

the Commission that installation of the first new rack that j

contains Boraflex was completed on November 19, 1983.

Sincerely, ilt]@f;w W.

C.; Jones Divigion Manager i

Proddction Operations WCJ/JCB:jmm cc:

Mr. J.

E. Gagliardo, Director Division of Resident Reactor Project

& Engineering Programs U.

S.

Nuclear. Regulatory Commission Region IV 611 Ryan Plaza Drive, Suite 1000 Arlington, Texas 76011 LeBoeuf, Lamb, Leiby & MacRae 1333 New Hampshire Avenue, N.W.

Washington, D.C.

20036 4

Mr.

E.

G. Tourigny, Project Manager Mr.

L.

A.

Yandell, Senior Resident Inspector A

4

.-. -. _ _ _, _ _ _. - - ~ -....