ML20082F059

From kanterella
Jump to navigation Jump to search
Ro:On 831001-31,fire Doors Found Inoperable During Rountine Surveillances.Design Change Packages Being Developed to Upgrade Door Latches & Closure Mechanisms Into Heavier Duty Hardware
ML20082F059
Person / Time
Site: San Onofre  Southern California Edison icon.png
Issue date: 11/15/1983
From: Haynes J
SOUTHERN CALIFORNIA EDISON CO.
To: Martin J
NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION V)
References
NUDOCS 8311280419
Download: ML20082F059 (6)


Text

,

Southern California Edison Company

[E SAN ONOFRE NUCLE AR GENER A TING ST ATION P.O. BO K 128 S AN CLEMENT E, C A LIFORNI A 92672 J. G. H A Y N E S ST ATION M AN AGE R (73,,,,,,7,,,

November 15, 1983 cr; m

&'s w

k

(>

uss h

=

a E!

E" E?. S. Nuclear Regulatory Commission Dffice of Inspection and Enforcement Region V 1450 Maria Lane, Suite 210 Walnut Creek, California 94596-5368 Attention:

Mr. J.

B.

Martin, Regional Administrator

Dear Sir:

Subject:

Docket Nos. 50-361 and 50-362 30-Day Report, Inoperable. Fire Doors San Onofre~ Nuclear Generating Station, Units 2 and 3

Reference:

Letter, H.

B. Ray (SCE) to J.

B.

Martin (NRC),

dated October 18, 1983 In accordance with our referenced letter, this submittal provides the-30-day written report, pursuant to Technical Specification 6.9.1.13.b, for fire-rated assemblies (specifically fire doors) found inoperable during routine surveillances.

Fire doors found inoperable during the October routine surveillances are identified in the Attachment and include:

17 latching mechanism

  • failures; 37 closure mechanism failures; and 20 doors blocked open typically for construction, startup or maintenance activities.

As each of these deficiencies was identified, compensator'y fire watches, pursuant to Technical Specification 3.7.9, Action Statement

'a',

were established.

Mi As reported previously, Design Change Packages (DCP's)'are being developed to upgrade door' latches and closure mechanisms into heavier duty hardware and to ensure a constant prassure differential across the access doors in the Radwaste and Control Buildings in order to reduce the door closure problems.

8311280419 831115 PDR ADOCK 05000361 S

PDR

\\\\

gqV

x.

Mr. J. B. Martin tbvember 15, 1983 The administrative deficiencies which have permitted fire doors to be blocked open have been investigated.

.To effect control, fire doors impaired for construction or maintenance activities will be included in the Fire Barrier Removal and Reinstallation Request

-(FBRRR) Procedure to ensure proper compensatory measures are in place prior to any work performance.

As long term corrective action, the installation of utility penetrations adjacent to the 7

-doors for the routing of temporary cables, conduits and/or hoses, 1

to avoid blocking open the fire doors is under consideration.

Results of surveillances conducted during November 1983 will be reported by December 15, 1983.

If you require any additional information, please so advise.

Sincerel,

Yb b,99 Attachment cc:

A. E.

Chaffee*(USNRC)1 Resident Inspector, Units 1, 2 and 3)

J. P. Stewart (USNRC Resident Inspector, Units 2 and 3)

U. S. Nuclear Regulatory Commission Office of Inspection and Enforcement U. S.' Nuclear Regulatory Commission b

Division of Technical Information and Document Control Institute of Nuclear Power Operations (INPO)

cm

.l ATTACHMENT SOUTHERN CALIFORNIA EDISON COMPANY s

INOPERABLE FIRE DOORS FOR THE MONTH OF OCTOBER 1983 SAN ONOFRE NUCLEAR GENERATING STATION UNITS NO. 2 AND 3, DOCKET NOS. 50-361 and 50-362 y

[

I.

Latching Mechanism Failures:

Number of doors failing - 17, as follows:

s E

Door Number Inoperable Operable AR-104 10/05 11/07 10/09 10/11 10/21 Work Pending DG3-104 10/01 10/08 AC-118 10/01 10/05 AC-127 10/01 10/09 AR-203 10/01-10/12 10/28 Work Pending AC-257 10/03 10/04 h

AC-258 10/03 10/04 AC-303 10/16 10/17

  • ~

10/20 10/22 AC-304 10/16 10/19 AC-309 10/19 10/28 AC-338 10/01 10/02 10/03 10/12

^

10/13 10/15 10/16 10/19 AC-351 10/11 10/24 C2-403 10/09 10/11 C3-403 10/09 10/11

____10/14 10/19 10/22 10/28 FH2-403 10/01 10/03 10/15 10/17 i

10/21 10/22 h

C2-405-10/09 10/10 AR-504 10/01 10/03 10/13 Work Pending l

l 4

1, 4

?

6:

5

ATTACHMENT SOUTHERN CALIFORNIA EDISON COMPANY

($

INOPERABLE FIRE DOORS FOR THE MONTH OF OCTOBER 1983

f SAN ONOFRE NUCLEAR GENERATING STATION UNITS NO. 2 AND 3, DOCKET NOS. 50-361 and 50-362 (Continued)

II.

Closure Mechanism Failures:

Number of doors failing - 37, as follows:

E Door Number Inoperable Operable AR-101 10/01 10/17 10/18 Work Pending FH2-101 10/01 10/07 10/09 Work Pending AR-104 10/12 10/17 10/18 10/20 AC-105 10/01 Work Pending AC-106 10/01 10/09 10/11 Work Pending AC-111 10/07 10/08 AC-122 10/29 Work Pending AC-129 10/29 Work Pending AC-223 10/11 10/13 AC-236 10/10 10/11 FH2-302 10/01 10/19 10/21 10/22 10/28 Work Pending PH3-302 10/01 10/20 10/29 10/30 10/31 Work Pending AC-303 10/02 10/12 10/23 10/24 FH2-303 10/01 10/05 10/06 10/07 10/28 10/29 AC-304 10/05 10/09 L

10/11 10/12 10/20 10/24 10/31 Work Pending AC-305 10/02 10/12 10/13 10/14 10/23 10/24 10/31 Work Pending AC-308 10/08 10/09 AC-311 10/10 10/11 AR-315 10/03 10/04 AR-316 10/01 10/08 10/25 10/27 AR-318 10/01 10/08 AC-328 10/01 Work Pending AC-338 10/20 10/24 10/26 10/29 10/31 Work Pending 4

ATTACHMEllT SOUTHERN CALIFORNIA EDISON COMPANY INOPERABLE FIRE DOORS FOR THE MONTH OF OCTOBER 1983 J

SAN ONOFRE NUCLEAR GENERATING STATION UNITS NO. 2 AND 3, DOCKET NOS. 50-361 and 50-362 (Continued) f II.

Closure Mechanism Failures:

(Continued) 4 L*

Door Number Inoperable Operable

.AC-345 10/02 10/09 10/11 10/12 10/20 10/22 10/23 10/24 10/27 10/30 10/31 Work Pending i

AC-346 10/08 10/09 l

10/29 10/30 AC-347 10/20 10/22 10/27 10/28 i

AC-348 10/03 10/09 y

10/11 10/12 F

AC-349 10/20 10/28 10/29 Work Pending L

AC-350 10/05 10/07 10/20 10/22 10/23 10/24 10/29 10/30 r:

AC-402 10/03 10/06 FH2-403 10/23 10/26 FH3-403 10/01 10/06 10/27 Work Pending l

AR-405 10/14 10/15

- AC-413

-10/08

-Work-Pcnding -

AC-415 10/01 10/07 AC-442 10/04 10/07 10/08 10/10 10/11 10/12 p

AR-501 10/01 Work Pending l

l l

l l

c

~ [

L

.i'***

ATTACHMENT SOUTHERN CALIFORNIA EDISON COMPANY INOPERABLE FIRE DOORS FOR THE MONTH OF OCTOBER 1983 f'-

SAN ONOFRE NUCLEAR GENERATING STATION UNITS NO. 2 AND 3, DOCKET NOS. 50-361 and 50-362 (Continued)

III.

Doors-Blocked Open:

Number of doors failing - 20, as follows:

}

Door Number Inoperable Operable AC-106 10/26 10/29 AC-109 10/01 10/05 AC-lll 10/26 10/27 10/28 10/29 AC-ll2 10/05 10/09 AC-122 10/09 10/10 10/17 10/18 AC-124 10/17 10/18 AC-125 10/05 10/09 10/11 10/28 2

10/29 Work in Progress AC-233 10/23 Work in Progress AC-236 10/26 10/28 AC-259 10/01 Work in Progress AC-260 10/01 Work in Progress AC-303 10/19 10/20 AC-308 10/07 10/08 10/11 10/15 AR-315 10/09 10/11 AC-340 10/24 10/25 AC-341 10/24 10/25

.-.-._- _ _ __ _AC-402.

10/01 10/12 10/18 10/19 C2-403 10/12 10/13 10/25 Work in Progress AC-442 10/18 Work in Progress 3

AR-501 10/21 Work in Progress

)

r E

1833u :