Interim Deficiency Rept DER 83-70 Re Wiring in ERF Cabinets Supplied by Energy,Inc Not in Conformance w/IEEE-384 Criteria.Initially Reported on 831011.Vendor Requested to Inspect Cabinets.Next Rept by 840120
ML20082E978
Person / Time
Site: Palo Verde  Arizona Public Service icon.png
Issue date: 11/08/1983
From: Van Brunt E, Van Brunt E, Van Brunt E, Vanbrunt E, Vanbrunt E
ARIZONA PUBLIC SERVICE CO. (FORMERLY ARIZONA NUCLEAR
To: Bishop T
NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION V)
References
10CFR-050.55E, 10CFR-50.55E, ANPP-28201-BSK, DER-83-70, NUDOCS 8311280388
Download: ML20082E978 (3)


Text

_.

s ,.

Arizona Pu'olic Service Company P O. B Ox 21666 . PHOENIX, ARIZONA 85036 November 8, 1983 ANPP-28201-BSK/RQT U. S. Nuclear Regulatory Commission Region V Creekside Oaks Office Park 1450 Maria Lane - Suite 210 Walnut Creek, CA 94596-5368 Attention: Mr. T. W. Bishop, Director Division of Resident Reactor Projects and Engineering Programs

Subject:

Interim Report - DER 83-70 A 50.55(e) Potentially Reportable Deficiency Relating to Wiring In the ERF Cabinets.Is Not In Conformance With IEEE-384 Criteria.

File: 83-019-026; D.4.33.2

Reference:

Telephone Conversation between P. Narbut and R. Tucker on October 1), 1983.

Dear Sir:

The NRC was notified of a potentially reportable deficiency in the referenced telephone conversation. At that time, it was estimated that a determination of reportability would be made within thirty (30) days.

Due to the extensive investigation and evaluation required, an Interim Report is attached. It is now expected that_this information will be finalized by January 20, 1984 at which time a complete report will be submitted.

Very truly yourS Q rm . ..

m -

. ML A LLC O y_ [ E. E. Van Brunt, Jr.

i m APS Vice President, h-- C N Nuclear Projects Management

.  ;::;..-g

h. ANPP Project Director Elgl/RQT:

- AtVinchment .

..x.-

cd: See Page Two 8311280388 831108 .

PDR ADOCK 05000528 S PDR

^

}h

(s- - 3 R, ..

o l I

Mr. T. W. Bishop DER 63-70 l Page Two '

.cc: . Richard DeYoung, Director

~ 0ffice of Inspection and Enforcement U. S. Nuclear Regulatory Commission '

Washington, D. C. 20555 T. C;' Woods, Jr.

G. C. Andognini J. A. Roedel D. B. Fasnacht.

A. C. Rogers B. S. Kaplan W. E. Ide J. Vorees J. R. Bynum D. D. Green P. P. Klute A. C. Gehr

~W. J. Stubblefield W. G. Bingham R. L. Patterson R. W. Welcher R. M. Grant D. R. Hawkinson L. E.' Vorderbrueggen G. A.. Fiore111 .*

.S. R. Frost J. Self D. Canady l

Records Center i Institute of Nuclear Power Operations 1100 Circle 75 Parkway, Suite 1500 Atlanta,.GA 30339

, y - - --

  • ' n- , e INTERIM REPORT - DER 83-70 POTENTIAL REPORTABLE DEFICIENCY ARIZONA PUBLIC SERVICE COMPANY (APS)

PVNCS UNITS 1 & 2 I. Potential Problem Surveillance inspection of Units 1 and 2 ERF isolation cabinets identified by tag numbers 1s-SDD-C06, IJ-SDC-COS, 2J-SDD-C06, and

-2J-SDC-C05 do not meet IEEE-384 Class 1E separation criteria.

The cabinets were supplied by Energy Incorporated under purchase order 13-JM-106.

II. - Approach To and Status of Proposed Resolution Bechtel engineering has requested the services of- an Energy Incorporated representative to -inspect the subject cabinets. A copy _of DER 83-70 will be sent to Energy Incorporated to provide reportability and technical justification for corrective action.

III. Projected Completion of Corrective Action and Submittal of the Final Report Evaluation of this condition and submittal of the Final Report is forecast to be completed by January 20, 1984.

6_