ML20082E369

From kanterella
Jump to navigation Jump to search
Application for Amends to Licenses DPR-77 & DPR-79, Consisting of TS Change 95-08,changing Definition of Core Alteration & Quadrant Power Tilt Ratio & Clarifying Unit 1 Operational Mode Parameters,Per NUREG-1431
ML20082E369
Person / Time
Site: Sequoyah  Tennessee Valley Authority icon.png
Issue date: 04/06/1995
From: Shell R
TENNESSEE VALLEY AUTHORITY
To:
NRC OFFICE OF INFORMATION RESOURCES MANAGEMENT (IRM)
Shared Package
ML20082E372 List:
References
RTR-NUREG-1431 NUDOCS 9504110208
Download: ML20082E369 (2)


Text

__

.NC 9

e Tenrence Vaney A@oiy Post Off.ce Bon M/J0. Soddy Desy Tennessee 37379 April 6,1995 TVA-SON-TS-95-08 10 CFR 50.90 U.S. Nuclear Regulatory Commission ATTN: Document Control Desk Washington, D.C. 20555 Gentlemen:

In the Matter of

)

Docket Nos. 50-327 Tennessee Valley Authority

)

50-328 SEQUOYAH NUCLEAR PLANT (SON) - TECHNICAL SPECIFICATION (TS)

CHANGE 95-08," QUADRANT POWER TILT RATIO AND CORE ALTERATION DEFINITIONS REVISION AND OPERATIONAL MODE CLARIFICATIONS" In accordance with 10 CFR 50.90, we are enclosing an amendment to Licenses DPR-77 and DPR-79 to change the TSs of SON Units 1 and 2. The proposed change revises SON's definitions section, which is consistent with standard TS (NUREG-1431). The proposed TS change revises the definition of core alteration, quadrant power tilt ratio, and corrects operational mode parameters for the Unit 1 TS.

The proposed TS change is identified in Enclosure 1. The justification for the proposed TS change is provided in Enciosure 2. A proposed determination of no significant hazards consideration performed pursuant to 10 CFR 50.92 is provided in.

110031 9504110200 950406 PDR ADOCK 05000327 P

PDR f

I

C,. ;'

9;%

W 33 n

y,-

4 4

U.S. Nuclear Regulatory Commission Page 2.

- April 6,1995.

TVA requests a 45-day implementation period for this TS change following issuance.

Please direct questions concerning this issue to James W. Proffitt at (615) 843-6651.

L Sincerely, kt Yo.

R. H. Shell Manager SGN Site Licensing day of 1995 9MA

/

1Al l

Notdry Public

/

My Commission Expires h.k /

f Enclosures cc (Enclosures):

Mr. D. E. LaBarge, Project Manager Nuclear Regulatory Commission One White Flint, North 11555 Rockville Pike l

Rockville, Maryland 20852-2739 Mr. Michael H. Mobley, Director (w/o Enclosures)

Division of Radiological Health 3rd Floor L & C Annex 401 Church Street Nashville, Tennessee 37243-1532 t

NRC Resident inspector Sequoyah Nuclear Plant 2600 lgou Ferry Road Soddy-Daisy, Tennessee 37379-3624 Regional Administrator U.S. Nuclear Regulatory Commission

. Region 11 101 Marietta Street, NW, Suite 2900 Atlanta, Georgia 30323-2711

,.