ML20082E325
| ML20082E325 | |
| Person / Time | |
|---|---|
| Site: | Sequoyah |
| Issue date: | 04/06/1995 |
| From: | Shell R TENNESSEE VALLEY AUTHORITY |
| To: | NRC OFFICE OF INFORMATION RESOURCES MANAGEMENT (IRM) |
| Shared Package | |
| ML20082E326 | List: |
| References | |
| RTR-NUREG-1431, RTR-NUREG-1482 NUDOCS 9504110193 | |
| Download: ML20082E325 (2) | |
Text
.
l*
cyg
-o
[.',
j
- M
?
Tennessee valley Author,ty Post Office Box 2000. Soddy-Daisy. Tennessee 37379 j.
l-p April 6, 1995 I
(p TVA-SQN-TS-94-18 10 CFR 50.90 l
U.S. Nuclear Regulatory Commission ATTN:
Document Control Desk j
Washington, D.C. 20555 Gentlemen:
In the Matter of
)
Docket Nos. 50-327 Tennessee Valley Authority
)
50-328 SEQUOYAH NUCLEAR PLANT (SQN) - TECHNICAL SPECIFICATION (TS) CHANGE 94-18, l
" SURVEILLANCE REQUIREMENT (SR) 4.0.5 REVISION AND TS 3/4.4.10 DELETION" In accordance with 10 CFR 50.90, we are enclosing a requested amendment-to Licenses DPR-77 and DPR-79 to change the TSs of SQN Units 1 and 2.
The proposed change revises SR 4.0.5 in accordance with the recommendations of draft NUREG-1482, " Guidelines for Inservice Testing at Nuclear Power Plants," and NUREG-1431, Standard Technical Spscifications.
In conjunction with the proposed change to SR.4.0.5, TVA is relocating TS 3/4.4.10, Reactor Coolant System Structural Integrity, in accordance with the Commission's final policy statement for relocation of current TS that do not meet any of the screening criteria for 7
retention.
i The proposed TS change is identified in Enclosure 1.
The justification for the proposed TS change is provided in Enclosure 2.
A proposed determination of no significant hazards consideration performed pursuant to 10 CFR 50.92 is provided in Enclosure 3.
l TVA requests a 45-day implementation period for this TS change following issuance.
110035 9504110193 950406 PDR ADOCK.05000327 P
.m Cf
- p E
(U.S. Nuclear Regulatory Comission Page 2
-April-6, 1995' N
Please direct questions concerning this issue'to D. V. Goodin at (615) 843-7734.
Sincerely,-
G R. H. Shell Manager SQN Site Licensing c4!m$1K 6 % m/4 a o i.
NotaffPublic My Comission Expires O.
/g 7/
Enclosures cc (Enclosures):
l Mr. D. E. LaBarge, Project Manager U.S. Nuclear Regulatory Comission One White Flint, North 11555 Rockville Pike Rockville, Maryland 20852-2739 Mr. Michael H. Mobley, Director (w/o Enclosures)
Division of Radiological Health i
i 3rd Floor L & C Annex
'l 401 Church Street
'l Nashville, Tennessee 37243-1532 NRC Resident Inspector Sequoyah Nuclear Plant 2600 Igou Ferry Road Soddy-Daisy, Tennessee 37379-3624 Regional Administrator U.S. Nuclear Regulatory Comission Region II 101 Marietta Street, NW, Suite 2900 Atlanta, Georgia 30323-2711 i
~
-