ML20082C942

From kanterella
Jump to navigation Jump to search
Forwards Rev 7 to IST Program Plan for Pumps & Valves, Containing Relief Requests VR-29 & VR-30,per Commitment Made in Util 931213 Response to NRC 930914 SER for Rev 5/5a IST Program
ML20082C942
Person / Time
Site: Braidwood  
Issue date: 03/30/1995
From: Saccomando D
COMMONWEALTH EDISON CO.
To:
NRC OFFICE OF INFORMATION RESOURCES MANAGEMENT (IRM), Office of Nuclear Reactor Regulation
Shared Package
ML20082C946 List:
References
NUDOCS 9504070218
Download: ML20082C942 (7)


Text

_ - _ _ _ _ - - _.

. [D Commonwealth Edison O

~.) 1400 Opus PL m

./-\\\\j/ Downers Grov3, luinois 60515 March 30,1995 Office of Nuclear Reactor Regulation U.S. Nuclear Regulatory Commission Washington, D.C. 20555 Attn: Document Control Desk

Subject:

Braidwood Station Units 1 and 2 Inservice Testing Program Plan for Pumps and Valves NRC Docket Numbers 50-456 and 50-457

References:

1.

R. Capra letter to D. Farrar dated February 17,1995, transmitting the Safety Evaluation Approving Inservice Testing Program Relief Requests for Valves (VR-26 and VR-27) 2.

D. Saccomando letter to T. Murley dated December 13,1993, transmitting Safety Evaluation Response 3.

J. Dyer letter to D. Farrar dated September 14,1993, transmitting Safety Evaluation Report for Revision 5/5a IST Program Reference 3 transmitted the Nuclear Regulatory Commission's (NRC) Safety Evaluation Report for Revision 5/5a Inservice Testing Program Plan for Pumps and Valves. The Technical Evaluation Report which was also transmitted in Reference 3 listed anomalies. These anomalies were addressed by Commonwealth Edison Company (Comed) in Reference 2 and in a March 14,1994 letter. In Reference 2, Attachment A, Braidwood responded to anomaly I by committing that Braidwood would submit a IST program revision in the Spring of 1995. The attachment contains that revision along with a summary of changes to the program.

Contained in this revision are two relief requests (VR-29 and VR-30) which we are requesting for an expedited review prior to the Unit 1 Refuel Outage scheduled for September 22,1995. To aid in this review, please note that identical relief requests (VR-26 and VR-27) were recently reviewed and approved by the Staff for Byron Station. Reference 1 transmitted the Safety Evaluation concerning these relief requests.

Kinla\\bwd\\lstrev7 1

l 950407o21s 950sso PDR ADOCK 0500o456 P

PDR

Document Control Desk March 30,1995 If you have any questions concerning this correspondence please contact this office.

Si erely, es u

Denise M. Saccomando Nuclear Licensing Administrator Attachment ec:

R. Assa, Braidwood Project Manager-NRR S. Dupont, Senior Resident Inspector-NRR J. Martin, Regional Administrator-RIII Office of Nuclear Safety-IDNS Ktula\\bwd\\istrev7

Summmy of Cassges forRevision 7 of the laservice Tesdag Programa Plan forPumps and Valves Besidwood Nuclear Power Station Units 1 and 2 Secdom 3.0 - Table of Ca=*=*=

1.

No Change Secdon 3.1 - Program Descnotion 2.

No Change Seedon 3.2 - Program References 3.

No Change Section 3.3 - Pumn Tables A.

Pumn Table Descrintion

1. No Change B.

Pumn Tables 1.

No Change Secdos 3.4 - Pumn Notes 1.

No Change Section 3.5 - Pumn Technical Anorne% and Poni*ia==

1.

No Change Section 3.5 - Pumn Relief Renuests 1.

No Change

s Summary of Changes for Revision 7 of the Inservice Testing Program Plan for Pamps and Valves Braid.veed Nuclear Power Staties Units 1 and 2 Secties 4.0 - Table of Contents 1.

Added Cold Shutdown Justincations VC-1 thru VC-4.

2.

Added Relief Requests VR-29, VR-30, VR-31.

Secties 4.1 - Pmaram Description 1.

No Change Secties 4.2 - Pmarma References 1.

No Change Section 4J - Valve Tables A.

Valve Table Descria*ia=

1.

Edited the note with Section K to indicate components shall be stroke timed in the designated direction (s).

B.

Yalic_ Tables l.

1/2CC9412A: corrected typographical error to renect normal position closed and stroke direction open.

2.

1/2CC9458,1/2CC9459A,1/2CC9467A,C: added these manual valves to the program per Engineering evaluation of UFSAR design basis.

3.

1/2CV128: added this air-operated valve to program for St, Ft, & It test types per 1994 scope review.

4.

1/2CV459 and 1/2CV460: added these air-operated valves to program for St, Ft, & It test types per 1994 scope review and cold shutdown justification VC-4.

5.

1/2CV8149A,B,C: added these air operated valves to program for St, Ft, & It test types per 1994 scope review and cold shutdown justification VC-4.

6.

1/2CV8153A,B: added air-operated valves to progran for ST, Ft, & It test types per 1994 scope review.

Sammary of Changes for Revisies 7 of the laservice Testing Program Plan for Pamps and Valves Braidwood Nuclear Power Staties Units 1 and 2 7.

1/2CV8348: added this check valve to program for Bt test type per 1994 scope review and relief request VR-30.

8.

1/2CV8355A-D: added these motor operated valves to program for St & It test types per 1994 scope review and cold shutdown justification VC-2.

9.

1/2CV8368A-D: added these check valves to program for Bt test type per 1994 scope review and cold shutdown justification VC-2.

10.

1/2FP345: added this check valve to program for Bt test type per 1994 scope review and relief request VR-29.-

11.

1/2FWO39A: corrected typographical error to indicate stroke time testing in test mode "CS".

12.

1/2FWO79A-D: deleted reference to note 39 and added reference to new relief regnest VR-31.

13.

1/2MS001B,C: corrected editorial error to indicate correct valve siac of 30.75 inches.

14.

1/2MS018A-D: corrected typographical error to correctly reference technical positions VA-01 and VA-02; no notes are applicable.

15.

1/2MS019A-D: corrected typographical error to show valve type "GA" for gate valves.

16.

00G059,61-65: added these motor operated valves to program for test types St & lt per 1994 scope review.

17.

1/2PS9354B-1/2PS9357B: corrected typographical error to correctly reference technical positions VA-01 and VA-02; no notes are applicable.

18.

1/2RE9159B: added reference to relief request VR-12 for classification as a rapid acting valve.

19.

1/2RF027: corrected typographical errors to correctly reference relief request VRel and technical positions VA 01 and VA-02.

20.

Valve Table page 30: edited page so that component data appears in its appropriate column.

21.

ISD054A-H and 2SD054B,D,F,H: added these air operated vsives for St & Ft test types per 1994 scope review and cold shutdown justification VC-3.

Summary of Changes for Revision 7 of the Inservice Testing Program Plan for Pumps and Valves Braidwood Nuclear Power Station Units 1 and 2 22.

1/2S18806: deleted reference to open direction stroke time testing. The 1994 scope review concluded that open stroke time test is not required. Closed direction testing shall continue.

23.

1/2SI8808A-D: added these motor operated valves to program for test types St & It por 1994 scope review and cold shutdown justification VC-1.

24.

1/2SX005: added those motor operated valves to the program for test types St & It per 1994 scope review.

25.

1/2SXI73: corrected typographical error to correctly identify failsafe testing (Ft) in Test Mode OP/ quarterly, not RR/ refueling.

26.

0WOOO2A & OWOOO2B: added these check valves to the program for test type Ct per 1994 scope review.

Section 4.4 - Valve F sig 1.

Ammended Note 30 to indicate that the backflow test for the AF014A-H valves will be performed during cold shutdowns, as recommended by region III inspectors, in addition to temperature verifications performed shiAly during operator rounds.

2.

Deleted Note 39.

3.

Added VC-1: cold shutdown justification for the safety injection accumulator discharge isolation valves S18808A-D.

4.

Added VC-2: cold shutdown justification for the RCP seal injection containment isolation valves CV8355A-D & CV8368A-D.

5.

Added VC-3: cold shutdown justification for the S/G blowdown flow control /High Energy Line Break valves SD054A-H.

6.

Added VC-4: cold shutdown justification for CVCS letdown isolation valves CV459, CV460 and letdown orifice isolation valves CV8149A-C.

Sasumary of Changes forRevieles 7 of the Inservice Testieg Pusgsus Plan for Pamps and Valves Braidweed Nuclear PowerStaties Units I and 2 Secties 4.5 - Valve Taak=iaal Anora-aka

' Paggigag 1.

Expanded the scope of this technical position to include four additional CC manual valves: CC9458, CC9459A, CC9467A, CC9467C.

Secties 4.6 - Valve n.ii.c p- -

1.

Revised relief request VR-02 to include additional infonastion to support the attornate testing method for spray add check valvos CS020A-B. The new information was previously provided in an SER response to NRR dated December 13,1993.

2.

Revised VR-12 to eliminate enumeration of rapid-acting valves in the body of the relief request.

3.

Revised VR-25 to correct a typographical error in the title block.

4.

Added VR-29: Relief Roquest for Refuel frequency testing of Fire Protection check valve FP345.

5.

Added VR-30: Relief Roquest for Refuel frequency testing of CVCS Loop Fill check valve CV8368.

6.

Added VR-31: Relief Request for Refuel frequency disassembly of Main Foodwater Header check valves FWO79A-D.