Text
_ - _ _ _ _ - - _.
. [D Commonwealth Edison O
~.) 1400 Opus PL m
./-\\\\j/ Downers Grov3, luinois 60515 March 30,1995 Office of Nuclear Reactor Regulation U.S. Nuclear Regulatory Commission Washington, D.C. 20555 Attn: Document Control Desk
Subject:
Braidwood Station Units 1 and 2 Inservice Testing Program Plan for Pumps and Valves NRC Docket Numbers 50-456 and 50-457
References:
1.
R. Capra letter to D. Farrar dated February 17,1995, transmitting the Safety Evaluation Approving Inservice Testing Program Relief Requests for Valves (VR-26 and VR-27) 2.
D. Saccomando letter to T. Murley dated December 13,1993, transmitting Safety Evaluation Response 3.
J. Dyer letter to D. Farrar dated September 14,1993, transmitting Safety Evaluation Report for Revision 5/5a IST Program Reference 3 transmitted the Nuclear Regulatory Commission's (NRC) Safety Evaluation Report for Revision 5/5a Inservice Testing Program Plan for Pumps and Valves. The Technical Evaluation Report which was also transmitted in Reference 3 listed anomalies. These anomalies were addressed by Commonwealth Edison Company (Comed) in Reference 2 and in a March 14,1994 letter. In Reference 2, Attachment A, Braidwood responded to anomaly I by committing that Braidwood would submit a IST program revision in the Spring of 1995. The attachment contains that revision along with a summary of changes to the program.
Contained in this revision are two relief requests (VR-29 and VR-30) which we are requesting for an expedited review prior to the Unit 1 Refuel Outage scheduled for September 22,1995. To aid in this review, please note that identical relief requests (VR-26 and VR-27) were recently reviewed and approved by the Staff for Byron Station. Reference 1 transmitted the Safety Evaluation concerning these relief requests.
Kinla\\bwd\\lstrev7 1
l 950407o21s 950sso PDR ADOCK 0500o456 P
Document Control Desk March 30,1995 If you have any questions concerning this correspondence please contact this office.
Si erely, es u
Denise M. Saccomando Nuclear Licensing Administrator Attachment ec:
R. Assa, Braidwood Project Manager-NRR S. Dupont, Senior Resident Inspector-NRR J. Martin, Regional Administrator-RIII Office of Nuclear Safety-IDNS Ktula\\bwd\\istrev7
Summmy of Cassges forRevision 7 of the laservice Tesdag Programa Plan forPumps and Valves Besidwood Nuclear Power Station Units 1 and 2 Secdom 3.0 - Table of Ca=*=*=
1.
No Change Secdon 3.1 - Program Descnotion 2.
No Change Seedon 3.2 - Program References 3.
No Change Section 3.3 - Pumn Tables A.
Pumn Table Descrintion
- 1. No Change B.
Pumn Tables 1.
No Change Secdos 3.4 - Pumn Notes 1.
No Change Section 3.5 - Pumn Technical Anorne% and Poni*ia==
1.
No Change Section 3.5 - Pumn Relief Renuests 1.
No Change
s Summary of Changes for Revision 7 of the Inservice Testing Program Plan for Pamps and Valves Braid.veed Nuclear Power Staties Units 1 and 2 Secties 4.0 - Table of Contents 1.
Added Cold Shutdown Justincations VC-1 thru VC-4.
2.
Added Relief Requests VR-29, VR-30, VR-31.
Secties 4.1 - Pmaram Description 1.
No Change Secties 4.2 - Pmarma References 1.
No Change Section 4J - Valve Tables A.
Valve Table Descria*ia=
1.
Edited the note with Section K to indicate components shall be stroke timed in the designated direction (s).
B.
Yalic_ Tables l.
1/2CC9412A: corrected typographical error to renect normal position closed and stroke direction open.
2.
1/2CC9458,1/2CC9459A,1/2CC9467A,C: added these manual valves to the program per Engineering evaluation of UFSAR design basis.
3.
1/2CV128: added this air-operated valve to program for St, Ft, & It test types per 1994 scope review.
4.
1/2CV459 and 1/2CV460: added these air-operated valves to program for St, Ft, & It test types per 1994 scope review and cold shutdown justification VC-4.
5.
1/2CV8149A,B,C: added these air operated valves to program for St, Ft, & It test types per 1994 scope review and cold shutdown justification VC-4.
6.
1/2CV8153A,B: added air-operated valves to progran for ST, Ft, & It test types per 1994 scope review.
Sammary of Changes for Revisies 7 of the laservice Testing Program Plan for Pamps and Valves Braidwood Nuclear Power Staties Units 1 and 2 7.
1/2CV8348: added this check valve to program for Bt test type per 1994 scope review and relief request VR-30.
8.
1/2CV8355A-D: added these motor operated valves to program for St & It test types per 1994 scope review and cold shutdown justification VC-2.
9.
1/2CV8368A-D: added these check valves to program for Bt test type per 1994 scope review and cold shutdown justification VC-2.
10.
1/2FP345: added this check valve to program for Bt test type per 1994 scope review and relief request VR-29.-
11.
1/2FWO39A: corrected typographical error to indicate stroke time testing in test mode "CS".
12.
1/2FWO79A-D: deleted reference to note 39 and added reference to new relief regnest VR-31.
13.
1/2MS001B,C: corrected editorial error to indicate correct valve siac of 30.75 inches.
14.
1/2MS018A-D: corrected typographical error to correctly reference technical positions VA-01 and VA-02; no notes are applicable.
15.
1/2MS019A-D: corrected typographical error to show valve type "GA" for gate valves.
16.
00G059,61-65: added these motor operated valves to program for test types St & lt per 1994 scope review.
17.
1/2PS9354B-1/2PS9357B: corrected typographical error to correctly reference technical positions VA-01 and VA-02; no notes are applicable.
18.
1/2RE9159B: added reference to relief request VR-12 for classification as a rapid acting valve.
19.
1/2RF027: corrected typographical errors to correctly reference relief request VRel and technical positions VA 01 and VA-02.
20.
Valve Table page 30: edited page so that component data appears in its appropriate column.
21.
ISD054A-H and 2SD054B,D,F,H: added these air operated vsives for St & Ft test types per 1994 scope review and cold shutdown justification VC-3.
Summary of Changes for Revision 7 of the Inservice Testing Program Plan for Pumps and Valves Braidwood Nuclear Power Station Units 1 and 2 22.
1/2S18806: deleted reference to open direction stroke time testing. The 1994 scope review concluded that open stroke time test is not required. Closed direction testing shall continue.
23.
1/2SI8808A-D: added these motor operated valves to program for test types St & It por 1994 scope review and cold shutdown justification VC-1.
24.
1/2SX005: added those motor operated valves to the program for test types St & It per 1994 scope review.
25.
1/2SXI73: corrected typographical error to correctly identify failsafe testing (Ft) in Test Mode OP/ quarterly, not RR/ refueling.
26.
0WOOO2A & OWOOO2B: added these check valves to the program for test type Ct per 1994 scope review.
Section 4.4 - Valve F sig 1.
Ammended Note 30 to indicate that the backflow test for the AF014A-H valves will be performed during cold shutdowns, as recommended by region III inspectors, in addition to temperature verifications performed shiAly during operator rounds.
2.
Deleted Note 39.
3.
Added VC-1: cold shutdown justification for the safety injection accumulator discharge isolation valves S18808A-D.
4.
Added VC-2: cold shutdown justification for the RCP seal injection containment isolation valves CV8355A-D & CV8368A-D.
5.
Added VC-3: cold shutdown justification for the S/G blowdown flow control /High Energy Line Break valves SD054A-H.
6.
Added VC-4: cold shutdown justification for CVCS letdown isolation valves CV459, CV460 and letdown orifice isolation valves CV8149A-C.
Sasumary of Changes forRevieles 7 of the Inservice Testieg Pusgsus Plan for Pamps and Valves Braidweed Nuclear PowerStaties Units I and 2 Secties 4.5 - Valve Taak=iaal Anora-aka
' Paggigag 1.
Expanded the scope of this technical position to include four additional CC manual valves: CC9458, CC9459A, CC9467A, CC9467C.
Secties 4.6 - Valve n.ii.c p- -
1.
Revised relief request VR-02 to include additional infonastion to support the attornate testing method for spray add check valvos CS020A-B. The new information was previously provided in an SER response to NRR dated December 13,1993.
2.
Revised VR-12 to eliminate enumeration of rapid-acting valves in the body of the relief request.
3.
Revised VR-25 to correct a typographical error in the title block.
4.
Added VR-29: Relief Roquest for Refuel frequency testing of Fire Protection check valve FP345.
5.
Added VR-30: Relief Roquest for Refuel frequency testing of CVCS Loop Fill check valve CV8368.
6.
Added VR-31: Relief Request for Refuel frequency disassembly of Main Foodwater Header check valves FWO79A-D.