ML20082C337

From kanterella
Jump to navigation Jump to search

Amend 36 to License NPF-2,allowing one-time Only Change to Tech Spec to Allow Use of 74-75% of Detector Thimbles in in-core Detection Sys for Flux Map Ending 831013
ML20082C337
Person / Time
Site: Farley 
(NPF-02-A-036, NPF-2-A-36)
Issue date: 11/01/1983
From: Varga S
Office of Nuclear Reactor Regulation
To:
Shared Package
ML20082C340 List:
References
TAC-52562, NUDOCS 8311220030
Download: ML20082C337 (4)


Text

/q:

UNITED STATES

[ T - g? i NUCLEAR REGULATORY CC"4M!SS CN

, Nd{dj,l A

.usmNcTon.1 c. :csse

.. '..j;j m,

ALABAMA POWER COMPANY 00CKET NO. 5_0-348 JOSEPH M. FARLEY NUCLEAR PLANT, UNIT NO. 1 AMENDMENT TO FACILITY OPERATING LICENSE Amendment No. 36 License No. MPF-2 1.

The Nuclear Regulatory Commission (the Commission) nas found that:

A.

The application for amendment by Alabama Power Company (the licensee) dated October 21, 1983, complies With the standards and requirements of the Atomic Energy Act of 1954, as amended (the Act),, and the Commission's rules and regulations set forth in 10 CFR Chapter I; 8.

The facility will operate in conformity with the application, the provisions of the Act, and the rules and regulations of the Commission; C.

There is reasonable assurance (i) that the activities authorized by this amendment can be conducted without endangering the health and safety of the public, and (ii) that such activities will be conducted in cacpliance with the Commission's regulations; D.

The issuance of this ametriment will not be inimical to the common defense and security or to the health and safety of the public; and E.

rne issuance of this amerdment is in accordance with 10 CFR Part 51 of the Commission's regulations and all applicable requirements have been satisfied.

8311220030 831101 PDR ADOCK 05000348 p

PDR

. 2.

Accordingly, the license is amended by changes to the Technical Specifications as. indicated in the attachment to this license amendment, and paragraph 2.C.(2) of Facility Operating License No. NPF-2 is hereby amended to read as follows:

~

(2) Technical Scecifications The Technical Spec.ifications contained in Appendices A and B, as revised through Amendment No. 36, are herehy. incorporated in the license. The licensee shall operate the facility in accordance with the Technical Specifications.

3.

This license anendment was effective as of October 21, 1983 on a one-time basis and will expire on about November 22. 1983.

FOR THE NUCLEAR REGULATORY COMMISSION I

iGil1Qef t ven d arga,i Operating Reactor-B anch No. 1 Division of Licens' g

Attachment:

Changes to the Technical Specifications Date of Issuance: November _1, 1983

ATTACHMENT TO LICENSE AMEN 0 MENT AMENDMENT NO. 36 TO FACILITY OPERATING LICENSE N0. NPF-2 00CKET NO. 50-348 Revise

  • Appendix A as fc;1cws:

k Remove +Page Insert Page 3/4-42.

~

3/4 3-42

  • Note: The page to be inserted is effective on a one-time basis from October 21, 1983 until the ncxt core flux mapping is required (about November 22,1983). At that time the inserted page shall be removed and page 3/4 3-42 Amendment No. 26 is effective again.

i l

i l

l l

l o

l_N's I RUML N I A I I ON MOVABLE INCORE DETECTORS LIMITING CONDITION FOR OPERATION 3.3.3.2 The movable incore detection system shall be OPERABLE with:

Atleast75$ofthedetectorthimbles.

a.

l b.

A minimum of 2 detector' thimbles per core quadrant, and Sufficient movable detectors, drive, and readout equipment to map c.

these thimbles.-

APPLICABILITY: When the movablm incore detection system is used for:

Recalibration of the excore neutron flux detection system, a.

b.

Monitoring the QUADRANT POWER TILT RATIO, or N

c.

Measurement of F3g, F (Z) and F q

xy ACTION:

With the movable incore detection system inoperable, do not use the system for the above applicable monitoring or calibration functions.

The provisions of Specifications 3.0.3 and 3.0.4 are nct applicable.

SURVEILLANCE REQUIREMENTS 4.3.3.2 The movable incore detection system shall be demonstrated OPERABLI,

.by normalizing each detector output during use when required for:

a.

Recalibration' of the excore neutron f lux detection system, or b.

Monitoring the QUADRANT POWER Titi RATIO, or c.

Measurement nf F g, F (Z) and F g

xy

  • A one-time only change allois use of 74% of the detector thimbles for the flux map taken for the period ending October 14, 1983 (grace period ends October 22,1983).
ARLEY-UNIT 1 3/4 3-42 AMENDMENT N0. 36

-..