Category:MONTHLY OPERATING ANALYSIS REPORT
MONTHYEARL-99-154, Monthly Operating Repts for Sept 199 for Bvps,Units 1 & 2. with1999-09-30030 September 1999 Monthly Operating Repts for Sept 199 for Bvps,Units 1 & 2. with L-99-140, Monthly Operating Repts for Aug 1999 for Bvps,Units 1 & 2. with1999-08-31031 August 1999 Monthly Operating Repts for Aug 1999 for Bvps,Units 1 & 2. with L-99-126, Monthly Operating Repts for Jul 1999 for Beaver Valley Power Station,Units 1 & 2.With1999-07-31031 July 1999 Monthly Operating Repts for Jul 1999 for Beaver Valley Power Station,Units 1 & 2.With L-99-107, Monthly Operating Repts for June 1999 for Bvps,Units 1 & 2. with1999-06-30030 June 1999 Monthly Operating Repts for June 1999 for Bvps,Units 1 & 2. with L-99-096, Monthly Operating Repts for May 1999 for BVPS Units 1 & 2. with1999-05-31031 May 1999 Monthly Operating Repts for May 1999 for BVPS Units 1 & 2. with L-99-079, Monthly Operating Repts for Apr 1999 for Beaver Valley Power Station,Units 1 & 2.With1999-04-30030 April 1999 Monthly Operating Repts for Apr 1999 for Beaver Valley Power Station,Units 1 & 2.With L-99-058, Monthly Operating Repts for Mar 1999 for Bvps,Units 1 & 2. with1999-03-31031 March 1999 Monthly Operating Repts for Mar 1999 for Bvps,Units 1 & 2. with L-99-038, Monthly Operating Repts for Feb 1999 for Bvps,Units 1 & 2. with1999-02-28028 February 1999 Monthly Operating Repts for Feb 1999 for Bvps,Units 1 & 2. with ML20203D4811999-01-31031 January 1999 Monthly Operating Repts for Jan 1999 for Bvps,Units 1 & 2, in Accordance with NRC GL 97-02.With ML20199C9971998-12-31031 December 1998 Monthly Operating Repts for Dec 1998 for Bvps,Units 1 & 2. with L-98-229, Monthly Operating Repts for Nov 1998 for Bvps,Units 1 & 2. with1998-11-30030 November 1998 Monthly Operating Repts for Nov 1998 for Bvps,Units 1 & 2. with L-98-210, Monthly Operating Repts for Oct 1998 for Bvps,Units 1 & 2. with1998-10-31031 October 1998 Monthly Operating Repts for Oct 1998 for Bvps,Units 1 & 2. with L-98-197, Monthly Operating Repts for Sept 1998 for Beaver Valley Power Station,Units 1 & 2.With1998-09-30030 September 1998 Monthly Operating Repts for Sept 1998 for Beaver Valley Power Station,Units 1 & 2.With L-98-178, Monthly Operating Repts for Aug 1998 for Bvps,Units 1 & 2. with1998-08-31031 August 1998 Monthly Operating Repts for Aug 1998 for Bvps,Units 1 & 2. with L-98-168, Monthly Operating Repts for July 1998 for Bvps,Units 1 & 21998-07-31031 July 1998 Monthly Operating Repts for July 1998 for Bvps,Units 1 & 2 L-98-139, Monthly Operating Repts for June 1998 for Bvps,Units 1 & 21998-06-30030 June 1998 Monthly Operating Repts for June 1998 for Bvps,Units 1 & 2 L-98-119, Monthly Operating Repts for Bvps,Units 1 & 21998-05-31031 May 1998 Monthly Operating Repts for Bvps,Units 1 & 2 L-98-096, Monthly Operating Repts for Apr 1998 for Bvps,Units 1 & 21998-04-30030 April 1998 Monthly Operating Repts for Apr 1998 for Bvps,Units 1 & 2 L-98-068, Monthly Operating Repts for Mar 1998 for Bvps,Units 1 & 21998-03-31031 March 1998 Monthly Operating Repts for Mar 1998 for Bvps,Units 1 & 2 L-98-036, Monthly Operating Repts for Feb 1998 for Beaver Valley Power Station1998-02-28028 February 1998 Monthly Operating Repts for Feb 1998 for Beaver Valley Power Station ML20202F8191998-01-31031 January 1998 Monthly Operating Repts for Jan 1998 for Beaver Valley Power Station,Units 1 & 2 ML20198L3981997-12-31031 December 1997 Monthly Operating Repts for Dec 1997 for Beaver Valley Power Station,Units 1 & 2 L-97-072, Monthly Operating Repts for Nov 1997 for Bvps,Units 1 & 21997-11-30030 November 1997 Monthly Operating Repts for Nov 1997 for Bvps,Units 1 & 2 L-97-057, Monthly Operating Repts for Oct 1997 for Beaver Valley Power Station,Units 1 & 21997-10-31031 October 1997 Monthly Operating Repts for Oct 1997 for Beaver Valley Power Station,Units 1 & 2 L-97-040, Monthly Operating Repts for Sept 1997 for Bvps,Units 1 & 21997-09-30030 September 1997 Monthly Operating Repts for Sept 1997 for Bvps,Units 1 & 2 ML20216H6031997-08-31031 August 1997 Monthly Operating Repts for Aug 1997 for Beaver Valley Power Station ML20210K5821997-07-31031 July 1997 Monthly Operating Repts for Jul 1997 for Bvps,Units 1 & 2 ML20140D7261997-05-31031 May 1997 Monthly Operating Repts for May 1997 for BVPS ML20141B3501997-04-30030 April 1997 Monthly Operating Repts for Apr 1997 for Beaver Valley Power Station,Units 1 & 2 ML20137T1441997-03-31031 March 1997 Monthly Operating Repts for Mar 1997 for Beaver Valley Power Station Units 1 & 2 ML20136G4651997-02-28028 February 1997 Monthly Operating Repts for Feb 1997 for Beaver Valley Power Station,Unit 1 & 2 ML20134K1521997-01-31031 January 1997 Monthly Operating Repts for Jan 1997 for Beaver Valley Power Station,Units 1 & 2 ML20133F4831996-12-31031 December 1996 Monthly Operating Repts for Dec 1996 for Beaver Valley Power Station Unit 1 & 2 ML20132B1001996-11-30030 November 1996 Monthly Operating Repts for Nov 1996 for Beaver Valley Power Station Unit 1 & 2 ML20134H4921996-10-31031 October 1996 Monthly Operating Repts for Oct 1996 for Beaver Valley Power Station,Units 1 & 2 ML20128N1911996-09-30030 September 1996 Monthly Operating Repts for Sept 1996 for Beaver Valley Power Station Unit 1 & 2 ML20117M2091996-08-31031 August 1996 Monthly Operating Repts for Aug 1996 for Beaver Valley Power Station Units 1 & 2 ML20117B2481996-07-31031 July 1996 Monthly Operating Rept for July 1996 for Beaver Valley Power Station ML20115D4061996-06-30030 June 1996 Monthly Operating Repts for June 1996 for BVPS ML20117M1791996-05-31031 May 1996 Monthly Operating Repts for May 1996 for Beaver Valley Power Station,Units 1 & 2 ML20111B2441996-04-30030 April 1996 Monthly Operating Repts for Apr 1995 for Beaver Valley Power Station ML20101R0621996-03-31031 March 1996 Monthly Operating Repts for Mar 1996 for Beaver Valley Power Station ML20100R2841996-02-29029 February 1996 Monthly Operating Repts for Feb 1996 for Beaver Valley Power Station ML20097D4541996-01-31031 January 1996 Monthly Operating Repts for Jan 1996 for Beaver Valley Power Station ML20096B2531995-12-31031 December 1995 Monthly Operating Repts for Dec 1995 for Beaver Valley Power Station ML20095D8651995-11-30030 November 1995 Monthly Operating Repts for Nov 1995 for Beaver Valley Power Station ML20094H3631995-10-31031 October 1995 Monthly Operating Repts for Oct 1995 for Beaver Valley Power Station ML20092F4251995-08-31031 August 1995 Monthly Operating Repts for Aug 1995 for Beaver Valley Power Station ML20087F1331995-07-31031 July 1995 Monthly Operating Repts for Jul 1995 for Beaver Valley Power Station ML20086G1601995-06-30030 June 1995 Monthly Operating Repts for June 1995 for Beaver Valley Power Station Unit 1 & 2 1999-09-30
[Table view] Category:TEXT-SAFETY REPORT
MONTHYEARL-99-154, Monthly Operating Repts for Sept 199 for Bvps,Units 1 & 2. with1999-09-30030 September 1999 Monthly Operating Repts for Sept 199 for Bvps,Units 1 & 2. with L-99-139, LER 99-S01-00:on 990813,uncompensated Loss of Ability to Detect within Single Intrusion Security Detection Zone Occurred.Caused by Procedure non-compliance.Involved Personnel Received Counseling Re Event.With1999-09-0202 September 1999 LER 99-S01-00:on 990813,uncompensated Loss of Ability to Detect within Single Intrusion Security Detection Zone Occurred.Caused by Procedure non-compliance.Involved Personnel Received Counseling Re Event.With L-99-140, Monthly Operating Repts for Aug 1999 for Bvps,Units 1 & 2. with1999-08-31031 August 1999 Monthly Operating Repts for Aug 1999 for Bvps,Units 1 & 2. with L-99-126, Monthly Operating Repts for Jul 1999 for Beaver Valley Power Station,Units 1 & 2.With1999-07-31031 July 1999 Monthly Operating Repts for Jul 1999 for Beaver Valley Power Station,Units 1 & 2.With L-99-107, Monthly Operating Repts for June 1999 for Bvps,Units 1 & 2. with1999-06-30030 June 1999 Monthly Operating Repts for June 1999 for Bvps,Units 1 & 2. with ML20209D9531999-06-27027 June 1999 Inservice Insp Ninety-Day Rept Bvps,Unit 2 Outage 7,Year 1999 L-99-096, Monthly Operating Repts for May 1999 for BVPS Units 1 & 2. with1999-05-31031 May 1999 Monthly Operating Repts for May 1999 for BVPS Units 1 & 2. with L-99-078, Special Rept:On 990326,seismic Monitoring Instruments Were Declared Inoperable.Caused by Resolution of Potential TS Compliance Issue & Work Scheduling Issue.Instrumentation Was Returned to Svc Following Calibr & Declared Operable1999-05-0303 May 1999 Special Rept:On 990326,seismic Monitoring Instruments Were Declared Inoperable.Caused by Resolution of Potential TS Compliance Issue & Work Scheduling Issue.Instrumentation Was Returned to Svc Following Calibr & Declared Operable L-99-079, Monthly Operating Repts for Apr 1999 for Beaver Valley Power Station,Units 1 & 2.With1999-04-30030 April 1999 Monthly Operating Repts for Apr 1999 for Beaver Valley Power Station,Units 1 & 2.With ML20205L0401999-04-0909 April 1999 SER Accepting Util Relief Requests for Inservice Insp Second 10-year Interval for Beaver Valley Power Station, Unit 2 L-99-054, Special Rept:On 990320,meteorological Tower Wind Speed Sensors Were Declared Inoperable.Caused by Calibration Completed by Vendor Did Not Adequately Cover Full Operating Range of Sensors.Removed Sensors & Sent Offsite1999-04-0505 April 1999 Special Rept:On 990320,meteorological Tower Wind Speed Sensors Were Declared Inoperable.Caused by Calibration Completed by Vendor Did Not Adequately Cover Full Operating Range of Sensors.Removed Sensors & Sent Offsite L-99-058, Monthly Operating Repts for Mar 1999 for Bvps,Units 1 & 2. with1999-03-31031 March 1999 Monthly Operating Repts for Mar 1999 for Bvps,Units 1 & 2. with ML20196K7981999-03-25025 March 1999 Rev 4 to COLR, for Cycle 8 L-99-038, Monthly Operating Repts for Feb 1999 for Bvps,Units 1 & 2. with1999-02-28028 February 1999 Monthly Operating Repts for Feb 1999 for Bvps,Units 1 & 2. with ML20203E1181999-02-10010 February 1999 SER Accepting Proposed Revs to Plant,Units 1 & 2 Quality Assurance Program Description L-99-019, Special Rept:On 990120,meteorological Tower Wind Speed Sensors Declared Inoperable.Caused by Processor Card for Sensor Locked Up & Needed to Be Reset.Heater That Fit Around Shaft of Sensor Replaced1999-02-0505 February 1999 Special Rept:On 990120,meteorological Tower Wind Speed Sensors Declared Inoperable.Caused by Processor Card for Sensor Locked Up & Needed to Be Reset.Heater That Fit Around Shaft of Sensor Replaced ML20196F7011999-01-31031 January 1999 BVPS Unit 2 Heatup & Cooldown Limit Curves During Normal Operation at 15 EFPY Using Code Case N-626 ML20203D4811999-01-31031 January 1999 Monthly Operating Repts for Jan 1999 for Bvps,Units 1 & 2, in Accordance with NRC GL 97-02.With ML20207E6631999-01-28028 January 1999 Rev 0 to EMECH-0713-1, Operational Assessment of SG Tubing at Beaver Valley Unit 1,Cycle 13 ML20210G7041999-01-22022 January 1999 BVPS Unit 1 Facility Changes,Tests & Experiments for 980123-990122 ML20207E5861998-12-31031 December 1998 Annual Rept 1998 for Toledo Edison ML20207E5601998-12-31031 December 1998 Annual Rept 1998 for Pennpower ML20198B9021998-12-31031 December 1998 BVPS Unit 1 Simulator Four Yr Certification Rept for 1995-1998 ML20207E5901998-12-31031 December 1998 Dqe 1998 Annual Rept to Shareholders ML20199C9971998-12-31031 December 1998 Monthly Operating Repts for Dec 1998 for Bvps,Units 1 & 2. with ML20207E5521998-12-31031 December 1998 Annual Rept 1998 for Ohio Edison ML20207E5761998-12-31031 December 1998 Annual Rept 1998 for Illuminating Co ML20204J6751998-12-31031 December 1998 1998 Annual Rept for Dbnps,Unit 1,PNPP,Unit 1 & BVPS Units 1 & 2 ML20199F5341998-12-29029 December 1998 Safety Evaluation Granting Relief Requests 1-TYP-3-B3.140-1, 1-TYP-3-B5.70-1,1-TYP-3-RH-E-1-1,1-TYP-3-B-G-1, 1-TYP-3-APP-I-1,1-TYP-3-UT-1,1-TYP-3-N-509,1-TYP-3-N-521, 1-TYP-3-N-524,1-TYP-3-B3.120-1 & 1-TYP-3-C6.10-1 ML20198K8551998-12-21021 December 1998 SER Granting Relief Request PRR-5 for Third 10-year Inservice Testing for Beaver Valley Power Station,Unit 1 ML20198A1631998-12-0909 December 1998 SER Approving Implementation Program to Resolve USI A-46 at Facility That Has Adequately Addressed Purpose of 10CFR50.54(f) Request L-98-229, Monthly Operating Repts for Nov 1998 for Bvps,Units 1 & 2. with1998-11-30030 November 1998 Monthly Operating Repts for Nov 1998 for Bvps,Units 1 & 2. with ML20195J3131998-11-12012 November 1998 Safety Evaluation Granting First & Second 10-yr Interval Inservice Insp Request for Relief L-98-210, Monthly Operating Repts for Oct 1998 for Bvps,Units 1 & 2. with1998-10-31031 October 1998 Monthly Operating Repts for Oct 1998 for Bvps,Units 1 & 2. with ML20206G0291998-10-31031 October 1998 BVPS Unit 2 Facility Changes,Tests & Experiments for Period 971101-981031 ML20154R9121998-10-20020 October 1998 Safety Evaluation Accepting Proposed Changes to QA Program Description in Chapter 17.2 of BVPS-2 Ufsar.Proposed Changes Would Modify QA Organization to Allow Warehouse QC Inspectors to Report to Manager of Nuclear Procurement Dept ML20154P7491998-10-19019 October 1998 SE Accepting Second ten-year Interval Inservice Insp Request for Relief RR-1-TYP-2-B5.40-1,Rev 0,for Plant, Unit 1 ML20198F7611998-10-0606 October 1998 Duquesne Light Co,Beaver Valley Power Station 1998 Emergency Preparedness Ingestion Zone Exercise, Conducted on 981006 ML20154C6711998-10-0101 October 1998 Safety Evaluation Concluding That Revised Model Identified in Dl Submittal Was Appropriate for Analysis of Installed Conduit Ampacity Limits.Determined That There Are No Outstanding Safety Concerns with Respect to Ampacity ML20154D5001998-09-30030 September 1998 Special Rept on Overview of BVPS-1 & BVPS-2 TS Compliance Issues & Corrective Action Taken L-98-197, Monthly Operating Repts for Sept 1998 for Beaver Valley Power Station,Units 1 & 2.With1998-09-30030 September 1998 Monthly Operating Repts for Sept 1998 for Beaver Valley Power Station,Units 1 & 2.With ML20154E2171998-09-28028 September 1998 Follow-up Part 21 Rept Re Defect with 1200AC & 1200BC Recorders Built Under Westronics 10CFR50 App B Program. Westronics Has Notified Bvps,Ano & RBS & Is Currently Making Arrangements to Implement Design Mods L-98-188, Special Rept:During 1998,Unit 2 SG Eddy Current exam,26 Tubes Were Improperly Encoded in SG 2RCS-SG21C During Previous Outage.Use of Independent Databases to Track New Indications Being Implemented as Preventive Measure1998-09-21021 September 1998 Special Rept:During 1998,Unit 2 SG Eddy Current exam,26 Tubes Were Improperly Encoded in SG 2RCS-SG21C During Previous Outage.Use of Independent Databases to Track New Indications Being Implemented as Preventive Measure L-98-178, Monthly Operating Repts for Aug 1998 for Bvps,Units 1 & 2. with1998-08-31031 August 1998 Monthly Operating Repts for Aug 1998 for Bvps,Units 1 & 2. with ML20155B5871998-08-28028 August 1998 Non-proprietary Rev 1 to 51-5001925-01, Risk Assessment for Installation of Electrosleeves at BVPS & Callaway Plant ML20236X2351998-08-0505 August 1998 Part 21 Rept Re Defect Associated W/Westronics 1200AC & 1200BC Recorders Built Under Westronics 10CFR50,App B Program.Beaver Valley,Arkansas Nuclear One & River Bend Station Notified.Design Mod Is Being Developed L-98-168, Monthly Operating Repts for July 1998 for Bvps,Units 1 & 21998-07-31031 July 1998 Monthly Operating Repts for July 1998 for Bvps,Units 1 & 2 L-98-157, Special Rept:On 980423,inoperability of Seismic Monitoring Instrument Noted.Caused by Obsolescence of Instrument & Inability to Obtain Necessary Spare Parts.Design Change Is Being Pursued to Obtain Replacement Product1998-07-29029 July 1998 Special Rept:On 980423,inoperability of Seismic Monitoring Instrument Noted.Caused by Obsolescence of Instrument & Inability to Obtain Necessary Spare Parts.Design Change Is Being Pursued to Obtain Replacement Product L-98-139, Monthly Operating Repts for June 1998 for Bvps,Units 1 & 21998-06-30030 June 1998 Monthly Operating Repts for June 1998 for Bvps,Units 1 & 2 L-98-119, Monthly Operating Repts for Bvps,Units 1 & 21998-05-31031 May 1998 Monthly Operating Repts for Bvps,Units 1 & 2 1999-09-30
[Table view] |
Text
. _ _ _ - - . _ _ _ _ - - _ _ _ _ _ _ _ - _ _ _ _ - _ - _ . -
-+ .
. _ i -r :.= ,
- 4) .
~(4pF M T we noa mn ansono Nuricar Group P O Don 4 mppmowt rA 1sonma4
-July 9, 1991 Beaver Valley Power Station.
Unit 1 - Docket No. 50-334, License No.- DPR-66 Unit-2 --Docket No.-50-412, License No. NPF-73 Wmthly Operatincr Rooort L U. S.' Nuclear Regulatory Ocunission t w = ant Control Desk '
Washington, D.C. 20555 Gentlemen:
.In accordance with Apperdix A, Technical Specifications, the Monthly Operating Report is subnitted - for Unit 1 and Unit 2 tor the month-of June, 1991.
Very truly yours,
') -
t
,. . .s-
. D. Sieber ice President Nuclear Group-
. MAW /mmg, Enclosures.
cc: NRC Regional Office
-King of Prussia, PA l
abbbb I 9107170248 910630 PDR- ADOCK 05000334 R PDR [h ' ff
, _ . . . _ . . _ . _ . , _ . , , _ _ _ _ . . . . . _ . u_-.~.~..__...
l 1&RRATIVE SUMh7RY OF l
FONDUX OPEPATDIG EXPERIDiCE I UNIT I l
CJNE 19".
June 1 '1he unit remained shutdown for the unit's 8th refueling through outage.
June 26 June 27 'Ihe unit entered Mode 4 at 1616 hours0.0187 days <br />0.449 hours <br />0.00267 weeks <br />6.14888e-4 months <br />.
June 28 'Ihe unit rumained in Mo.ie 4 to prepare to enter Mode 3.
June 29 At 1830 hours0.0212 days <br />0.508 hours <br />0.00303 weeks <br />6.96315e-4 months <br /> the unit entered Mode 3.
June 30 '1he unit remained in Mode 3 to prepare to enter Mode 2.
~,
OPERATING DATA REPORT DOCKET NO.: .50 334 REPORT DATE: 07/07/91 COMPLETED BY: M.A. WINCER TELEPHGNE: (412) 393 7621 OPERATINC STATUS 1.: UNIT NAME: BEAVER VALLEY POWER STATION, UNIT 1 Notes
- 2. REPORTING' PERIOD: JUNE 1991 3;-LICENSED THERMAL POWER (MWt): 2652
- 4. NAMEPLATE RATING (Gross MWe): 923
- 5. DESIGN ELECTRICAL RATING (Net NWe): 835 6 MAX, EEPENDABLE CAPACITY (Gross MWe): 860
- 7. MAX. DEPENDABLE CAPACITY (Net MWe): 810
- 8. .IF CHANGES _0CCUR IN CAPACITY RATINGS SINCE IAST REPORT, GIVE REASONS:
9, POWER. LEVEL TO WHICH RESTRICTED, IF ANY (Net MWe): None 10, REASONS FOR RESTRICTIONS .IF ANY: N/A
-THIS MONTH YEAR TO DATE CUMUIATIVE
- 11. HOURS IN REPORTING PERIOD: 720.0 4343,0 132935.0 12 NO. 0F HRS, REACTOR WAS' CRITICAL; 0.0 2104,4 82398,8
- 13. REACTOR RESERVE SHUTDOWN HCURS: 0.0 0.0 4482.8
- 14. HOURS GENERATOR WAS ON LINE: 0.0 2070,5 80615.5
--15.-UNIT RESERVE SHUTDOWN HOURS: 0.0 0,0 0.0
- 16. GROSS THERMAL' ENERGY GEN. (MWH): 0.0 5316347,0 191604794.5 17 GROSS ELECf.-ENERGY GEN. (MWH): 0.0 1715918.0 61548647,0 18._ NET ELECTRICAL ENERGY GEN.-(MWH): -5050.0 1613780.0 57477980.0 19.. UNIT SERVICE FACTOR::(PERCENT) 0,0 47,7 62.8
'20. UNIT AVAILABILITY FACTOR:(PERCENT) 0.0 47.7 62.8 121. UNIT CAPACITY FACTOR'(MDC): PCT 0,0 45.9 .56.2
-22.' UNIT CAPACITY FACTOR (DER): PCT 0.0- 44.5 54,5
!23.' UNIT FORCED OUTAGE RATE: (PERCENT) 0.0 15.3 16.3 24 -SHUTDOWNS SCHEDULE 1 0VER NEXT SIX MONTHS (TYPE,DATE,AND DURATION OF EACH):
- 25. IF SHUT DOWN AT END OF REPORT PERIOD, ESTIMATED D4TE OF STARTUP:
26,' UNITS IN TEST STATUS (PRIOR TO COMMERCIAL OPERATION):
FORECAST ACHIEVED INITIAL CRITICALITY N/A N/A INITIAL ELECTRICITY -N/A N/A COMMERCIAL OPERATION N/A N/A
.~ .~. .- ..-.-- _ .. .. . . . . - -. . . - -- . -
. AVERAGE IAILY UNIT POWER 11 VEL DOChTI'!O. 50-334 UNIT BVPS Unit 1 IATE _JullLR. 1991 CmPIETED BY M. A. Wimer TEIIRIONE (412) 393-7621
}WIH June 1991 IRY AVERAGE DAILY POWER IIVEL IAY AVERME IRILY POWER IEVEL (MWe-Net) (MWe-Net) 1 0 17 0 2 0 18 0 3 0 19 . 0 4 0 20 0 5
5 0 21 0 6 0 22 0 7 0 23 0 8 0 24 0 9 0 25 , 0 10 0 26 0 11 0 27 0 12 0 28 0 13 0 29 0 14 0 30 0 15 0
- 16. O INSTRUCI'ICRE On this format, list the average daily unit power level MWe-Net for each day in the reputting manth. Ctanpute to the nearest whole megawatt.
l l
- c
.. 4 4 UNIT SNUTDOWNS AND POWER REDUCTIONS : Docket No.- 50-334' **
Unit Name SVPS Unit #1' Date July 9. 1991 Completed Sy' N.A. Winner REPORT MONTN JUNE 1991 Telephone- (412) 393-7621 4
Method of- Licensee Cause & Corrective -
! Duration ' Shutting Event : System Component Action to No. Date. Typet ;(Nours) -Reason 2. 'Doun Reactor 3 Report # code 4 Code 5 Prevent Recurrence
, 15 910601 S 720 C 4' N/A- RC fuELXX Unit remained shutdown for the l Unit's 8th refueling. outage.
4 A
1 l
l 1 2 3 4 i
i F-Forced Reason: . Method: Exhibit G-Instructions for S-Scheduled A-Equipment Failure (Explain)' 1-Manual Preparation of Data Entry Sheets i B-Maintenance'or test 2-Manual Scram for Licensee Event Report-(LER) File l
C-Refueling ,
3-Automatic Scram (NUREG0161).
I D-Regulatory Restriction 4-Cont'd. from Previous Month
) E-Operator Training & License Exam 5-Reduction 5 F-Administrative 9-Other Exhibit 1-Same Source.
, G-Cperational Error (Emplain)'
M-Other (Emptain) I
-f
.i P
G D4
, i
\'
f
NARRATIVE SLM ERY OF lotmILY OPERATDG EXPERIDICE UNIT II JUNE 1991 June 1. 'Ihe unit operated at a nominal value of 100% output.
through JVne 7 i
June 8- At 0009- hours the unit's output was rarhM to 75% to load 1 follcw.
June 9' 'At 1440 hours0.0167 days <br />0.4 hours <br />0.00238 weeks <br />5.4792e-4 months <br /> the unit's output was escalated to a ncminal value of 100%
h 10 'Ibe unit operated at a ncuninal value of 100% output.
throu@t June 20 June 21- At 1900 hours0.022 days <br />0.528 hours <br />0.00314 weeks <br />7.2295e-4 months <br /> the unit's output was rach M to 55% to load follow.
I June 22 At 2056 hours0.0238 days <br />0.571 hours <br />0.0034 weeks <br />7.82308e-4 months <br /> the unit's output was escalated to a nominal' value of 100%.
June 23 'Ihe unit operated at a ncminal value of.100% output.
through June 28 June 29 At -0005 hours the unit's output was rar* M to 30% to repair the aaala at 'A' Heater Drain punp.
June 30 At 0910 hours0.0105 days <br />0.253 hours <br />0.0015 weeks <br />3.46255e-4 months <br /> the unit's output was escalated to 50% to load follow.
1 E-
' UNIT SNUTDOWNS'AND POWER REDUCTIONS Docket No. 50-412
- Unit Name SVPS Unit #2 Date July 9. 1991 Completed By M.A. Winner REPORT.MONTN JUNE 1991 Telephone ~ (412) 393-7621 i
Method of Licensee Cause & Corrective
Shutting Event. Syster Component Action to No. Date Typel (Nours); Reason 2 Down Reactor 3 Report # . Code 4 Code 5 Prever-t Recurrence . j i
.4 910608 5 0 N 5' N/A ZZ ZZZZZZ' Output reduced from 1001 to.751 to '
' toad follow.
5 910621 S 0 N 5 N/A ZZ ZZZZZZ output reduced from 100% to 55% to load follow.
i '
6 910629 F 0 e 5 N/A NN PUMPXX Dutput reduced from 1001 to 30% to repair sesta on A Mester Drain Pump.
7 910630- S 0 N 5 N/A ZZ ZZZZZZ Output increasea from 30% to 50% to
- toad follow.
1 ;
1 2 3 4 F-Forced Reason: Method Exhibit G-Instructions for ,
S-Zeheduled A-Equipment-Failure (Explain) 1-Manuel Preparation of Data Entry Sheets t B-Maintenance or Test 2-Manual Scram for Licensee Event Report (LER) File (
C-Refueling 3-Automatic Scram (NUrEG0161). ;
D-Regulatory Restriction 4-Cont'd. from Previous Month E-Operator Training & License Exam 5-Reduction 5 F-Administrative 9-Other Exhibit 1-Same Source. >
G-Operational Error (Emptain) ,
N-Other (Explain)
I b
W
-- r e e
OPERATING DATA REPORT DOCKET NO.: 50 412 REPORT DATE: 07/08/91 COMPLETED BY: M.A.WINGER TELEPHONE: (412) 393-7621 Q1ERATINC STATUS
- 1. UNIT NAME: BEAVER VALLEY POWER STATION, UNIT 2 Notes
- 2. REPORTING PERIOD: JUNE 1991
- 3. LICENSED THERMAL POWER (MWt): 2652
- 4. NAMEPIATE RATING (Gross MWe): 923
- 5. DESIGN ELECTRICAL RATING (Net MWe): 836
- 6. MAX. DEPENDABLE CAPACITY (Gross MWe): 870
- 7. MAX DEPENDABLE CAPACITY (Net MWe): 820
- 8. IF CHANGES OCCUR IN CAPACITY RATINGS SINCE IAST REPORT, GIVE REASONS:
- 9. POWER LEVEL TO VHICH RESTRICTED, IF ANY (Net MWe): None
- 10. REASONS FOR RESTRICTIONS, IF ANY: N/A I.
THIS MONTH YEAR TO DATE CUMULATIVE
- 11. HOURS IN REPORTING PERIOD: 720.3 4343.0 31718.0
- 12. NO OF HRS. REACTOR WAS CRITICAL: 720.0 4343.0 26690.3
- 13. REACTOR RESERVE SHUTDOWN HOURS: 0.0 0.0 0.0
- 14. HOURS GENERATOR WAS ON LINE: 720.0 4343,0 26504.8
- 15. UNIT RESEhVE SliUTDOWN HOURS: 0.0 0.0 0.0
- 16. GROSS THERMAL ENERGY GEN. (MWH): 1764771.0 11282586,0 64410202.4
- 17. GROSS ELECT, ENERGY GEN. (MWH): 557700.0 3617600.0 20654400.0
- 18. NET ELECTRICAL ENERGY GEN. (MVH): 526682.0 3430393.0 19473717.0
- 19. UNIT SERVICE FACTOR: (PERCENT) 100.0 100.0 83.6
- 20. UNIT AVAILABILITY FACTOR:(PERCENT) 100.0 100.0 83.6
- 21. UNIT CAPACITY FACTOR (MDC): PCT 89.2 96.3 74.0
- 22. UNIT CAPACITY FACTOR (DER): PCT 87.5 94.5 73.4
- 23. UNIT FORCED OUTAGE RATE: (PERCENT) 0.0 0.0 4.4
- 24. SHUTDOWNS SCHEDULED OVER NEXT SIX MONTHS (TYPE,DATE AND DURATION OF EACH):
- 25. IF SHUT DOWN AT END OF REPORT PERIOD, ESTIMATED DATE OF STARTUP:
- 26. UNITS IN TEST STATUS (PRIOR TO COMMERCIAL OPERATION):
FORECAST ACHIEVED INITIAL CRITICALITY N/A N/A INITIAL ELECTRICITY N/A N/A COMMERCIAL OPERATION N/A N/A
AVERAGE DAILY UNIT I%'ER IEVEL DOCKET 10. ,_50-412 UNIT BVPS Unit 2 DATE July 9. 1991 CINPIETED BY M. A. Wimer TELEPilONE (412) 393-7621
!OtTIH , June 1991 DAY AVERAGE DAIIX IOWER LEVEL DAY AVERAGE DAILY IG'ER IEVEL (MWe-Net) (MWe-Net) 1 785 17 790 2 794 18 _ 785 3 794 19 789 4 806 20 786 i
5- 802 21 720 6 806 22 , 420 7 802 23 790 8 601 24 . 798 9 662 25 798 10 802 26 789
-11 794 27 794 12 794 28 785 13 802 29 _
208 l-14 798 . 30 287 l
15 781 16 785 t.
INSTRUCTICNS On this format, list the average daily unit pomr level MWe-Net for each day in the I12 pitting nonth. Chupute to the nearest whole megawatt.
l