P.O. Box 2325. BOSTON. M ASSACHUSETTS O2107 United States Nuclear Regulatory Commission September 27, 1983 Midland Site Resident Office Route 7 J. O. No. 14358 Midland MI. 48640 Ref. MPF 53 Attention:
Mr. R.
Cook DOCKET NO. 50-339/330 MIDLAND PLANT UNITS 1 & 2 INDEPENDENT ASSESSMENT OF UNDERPINNING REPORT No. 53 A copy of the Independent Assessment of Underpinnin6 Weekly Report No. 53 for the period of September 18, 1983 through September 24, 1983 is enclosed with this letter. Included as attachments are the minutes of the daily meetings held during the week between members of the Assessment Team and Site Engineering, Construction, and Quality Assurance personnel.
If you have any questions with respect to this report, please contact me at (617) 589-2067.
A.
Stanley Lucks Project Manager Enclosures ASL/pd 8311210386 831104 PDR ADOCK 05000329 G
=
J. O. No. 14358 Midland Plant Units 1 & 2 Independent Assessment of Underpinning Weekly Report No. 53 September 18, 1983 through September 24, 1983 Personnel on Site Stone & Webster Michigan, Inc.
W.
Kilker 9120 - 9/24 B.
Holsinger 9/18 - 9/20 P.
Majeski 9/18 - 9/20 J.
Springer 9/18 - 9/24 Parsons, Brinckerhoff Michigan, Inc.
V.
Madill 9/19 - 9/22 Meetings Attended Date Represented Purpose 9/19 - 9/23 Stone & Webster Daily Assessment s
Bechtel Team Meeting Consumers Pow'er Parsons 9/19 Bechtel Soils Remedial Consumers Power Team Building Stone & Webster' 9/19 and 9/21 Consumers Power Quality Inspection
'Bechtel Point Review Mergentime Stone & Webster 9/20 Stone & Webster Weekly Assessment Team MPCAD Meeting with MPQAD 9/20 Bechtel Review of Weld Stone & Webster Technique Sheets 9/22 NRC Discussion of Stone & Webster Allowable Upward Bechtel Movements During Consumers Power Lead Transfer Mergentime 9/23 Bechtel Weekly Soils l
Consumers Power Review l
Stone & Webster
2
?
e J. O. No. 14358 Midland Plant Units 1 & 2 Independent Assessment of Underpinning Underpinning and Remedial Soils Activities - Construction E8 Grillage: The load transfer was initiated on 9/20. The 24 hour2.777778e-4 days <br />0.00667 hours <br />3.968254e-5 weeks <br />9.132e-6 months <br /> deflection acceptance criteria was satisfied on 9/24 but pier movement shortly thereafter required that rejacking be initiated.
Pier Kc10: No additional work was performed.
Load transfer is delayed pending completion of the E8 load transfer and 3 day rejacking.
Pier Kc9-Kc10 Drift Invert: The invert reinforcing steel was installed in this drift area.
Pier E14:
The pier was excavated and lagged ibll depth to El 565. No Broundwater entered the excavation.
WB Grillage: The load transfer commenced on 9/18.
On 9/23 instrumentation readings indicated the 24-hour deflection acceptance criteria was satisfied allowing the 3-day rejacking period to commence.
Pier Kc3:
The grout patch of the turbine building slab over the pier area was repaired after soundings indicated the presence of a void zone. Sub ~
sequently the grout repair developed cracks so further repair work is required.
Pier Kc2 - Kc3 drift:
The drift was advanced through concrete fill to within a few feet of completion.
Pier W14: The pier was excavated and lag 6ed full depth to El 565. Minor groundwater seepage entered the excavation through the upper fill soils.
UAT: Pressure grouting of the soils adjacent to the west and east UATs continued and is nearing completion. Backfill concrete was encountered in several of the grout hole probes.
SWP3: Exterior well and soldier beam installation continued. The train A service waterline was backfilled allowing access to install several additional soldier beams and dewatering wells.
BWST:
Resolution of all outstanding NCRs has not been completed. No additional
' foundation work was performed.
Yard Area:
Project Engineering initiated an investigation to evaluate the condition of the soils in the vicinity of the partially completed observation well, OBS 4, near the NE corner of the Diesel Generator Building.
Assessment Team Observation - Construction The load transfer of the E/W8 grillage installations was accopolished in accord-ance with the requirements of the project documents.
Throughout the effort, teamwork was apparent between the various supervisors, organizations and craft personnel.
The role of each responsible individual was well defined and well known.
In particular. FSO has continued to take prudent and effective action when upward structural movements met or exceeded the established notification levels. When required, additional data was obtained to supply to Engineering.
EPA upward movement on both the East and West sides has exceded the initial 30 mil notification limit.
Project Engineering has determined that the upward movements observed (60 mils - 90 mils ) 'are not detremental to the EPA structures.
l l
3 J. O. No. 14358 Midland Plant Units 1 & 2 Independent Assessment of Underpinning The FIVP also moved upward durin6 the EPA grillage loading.
The Contractor carefully checked the support system and made any required adjustments to maintain the correct load in the system.
The excavation and support of piers E/W14 progressed according to the design documents. Soils conditions were excellent in both pier locations with only minor groundwater seepage at one of the piers.
Lagging spacing was sufficient to insure good backpacking.
The UAT grouting operation is achieving apparent success. The grout take has been quite high at a number of the holes. The Subcontractor personnel, the Field En61neers and Resident Geotechnical Engineers were knowledgable of the procedures and their respective responsibilities.
After completion of a portion of the effort, the Contractor and Brouting specialists met to review the program and make any adjustments to improve coverage.
Assessment Team Observations - QA/QC 1,
The certification of 4 Q.C. supervisors were reviewed for compliance to project procedures. Three of the supervisors met the procedural certification requirements but one supervisor's certification was jud ed by the Assessment Team to be 6
inadequate resulting in NIR # 15.
2.
A surveillance was made of QA/QC for compliance to the key attributes in the PQCI for load transfer of the W8 grillage. In the Team's opinion, all attributes were properly inspected during the course of the load transfer operation.
3 Observations were made on the Engineering use of the cone penetrometer to evaluate the soil conditions surrounding OBS 4 near the NE corner of the Diesel Generator Building.
In the Team's opinion, the Contractor followed the established site permitting procedures, QA properly verified the equipment calibration records, and the intent of the specification was being met.
i 4
Several of the operations were observed that are involvedin soil stabilizing by grouting the zones around the UAT.
The Assessment Team observations indicated the inspection attributes were being properly inspected. In a particular case, the QC inspector displayed a " team attitude." in expediting the opening of an' Inspection Report so that regrouting of certain holes could proceed without delay.
5.
Observations were made by the Assessment Team of the effort underway to review the Quality inspection points used by the MPQAD personnel.
The effort will include an evaluation of the specification and procedure requirements for a particular activity as well as an evaluation of the corresponding PQCI.
The Assessment Team feels the effort, as planned, is an excellent method of evaluating the adequacy of presently defined Quality Inspection Points and identifying needed changes.
l Nonconformance Identification Reports l
NIR No.
Description Date (Opened) { Closed) 14 Nut Procurement 8/11/83 15
- MPQAD Supervisor 9/19/83 Certification
?
4 J. O. No. 14358 Midland Plant Units 1 & 2 Independent Assessment of Underpinning Open Items 1
The following is a listing of all open items from the Daily Meeting Notes with Bechtel and the Weekly Meeting with MPQAD.
Carry-over items from past weeks which have been closed out this week are also listed.
Item No.
Description Closure 45-8Q Discussion on Mechanism Open of Identifying Quality Concerns t
48-80 Structural Backrill PQCI open Adequacy 51-13 Request for Clarification 52-14 of the Drainage Detail for SWPS Lagging
'W R 51 pg 4 Control Document Open Evaluation
\\
52-40 MPQAD Independent Open Welding Inspection Review 52-22 Reschedule Work on Open DWST 52-26 Signoff for Lead 53-7 Design Organization on NCR's.
4 53-26 SWPS Lagging Installation Open Tolerance 53-27 Fly Ash Grout Placement Open l
Project Engineer Project Manager l
l
Notes of Daily Meeting Independent-Assessment of Underpinning Midland Plant Units 1 & 2 Consumers Power Company Held at Midland Site Location Midland, Michigan September 19, 1983 Present For:
Consumers Power Bechtel MPQAD Stone & Webster G.
Murray J.
Fisher R.
Sevo P.
Majeski R.
Wieland J.
Gaydos B.
Holsinger i
E.
Cviki J.
Springer M.
Blendy D.
Lavelle Parsons J.
Nation None
' Purpose This meeting is held each day to discuss items regarding the Independent Soils Assessment at the Midland Plant, Units 1 & 2.
Discession Item 53 UAT Status Update.
Grouting is scheduled for completion on east side during mid-week and on the i
west side by the end of the week.
(. CLOSED ITEM )
Item 53 WB Grillage Load Tre.nsfer Status.
The W8 grillage load transfer is currently at 120% of'specified load and 40 mils upward movement of the EPA ( the maximum allowable movement, based upon a Modified AUM determined by engineering ),
This load is on hold and the next step is being determined by the FSO organization. ( CLOSED. ITEM )
Item 53 E8 Grillage Load Transfer Status.
The E8 jacks beneath the turbine building only are scheduled for re-activation this evening.
The grillage loading is planned for 9-20. ( CLOSED ITEM )
Item 53 Drilling of Piezometer BB1.
The drilling of piezometer BB1 will begin today. ( CLOSED ITEM )
Item 53 Hydrotest at Train A Service Waterline The hydro test of Train A was completed on 9-18. ( CLOSED ITEM )
Item 53 Incorrect Washer NCR, W8 Grillage.
In response to a question raised by P.
Majeski over the weekend, D.
Lavelle indicated that the incorrect washer installation at W8 grillage was probably -
i a result of,an oversight on the part of the field personnel, resulting from their concentration on a difficult bolt torquin6 problem. ( CLOSED ITEM )
l
.e e
e
~
Notes of Daily Meeting Independent Assessment of Underpinning Midland Plant Units 1 & 2 Consumers Power Company Held at Midland Site Location Midland, Michigan September 19, 1983 Item 53 Signoff for Lead Design Organization on NCR's.
P.
Majeski acknowledged receipt of memoranda delegating signature authority.
( CLOSES ITEM 52-26 )
1 4
Notss of D311y. Meeting Independent Assessment of Underpinnin6 Midland Plant Units 1,& 2 Consumers Power Company Held at Midland Site Location Midland, Michigan September 20, 1983 Present For:
Consumers Power Bechtel MPQAD Stone & Webster R.
Wieland J.
Fisher R.
Sevo P.
Majeski J.
Gaydos Parsons V.
Madill Purpose This meeting is held each day to discuss ?.tems regarding the Independent Soils Assessment at the Midland Plant, Units 1 & 2.
Discussion Item 53 W8 Grillage Load Transfer Status.
J.
Fisher reported the load has been increased to 125 percent of specified load.
The upward movement of the EPA is currently at 44 mils. ( CLOSED ITEM )
Item 53 EB Grillage Load Transfer Status.
J.
Fisher said the jacks beneath the turbine building were activated last night. Lift-off occurred at 107 percent of specified load, which was within the acceptable range. ( CLOSED ITEM )
Item 53 Status of E/W14 Pier Excavation.
Excavation of pier E/W14 is underway.
( CLOSED ITEM )
Item 53 SWPS Status Update.
The installation of dewatering wells and soldier piles is scheduled for completion tomorrow. Backfill with lean flyash around Train A pipelines will commence today. ( CLOSED ITEM )
Item 53 Status of Drill Damaged Concrete Pipe near SWPS.
V.
Madill questioned the status of the plans to repair the 48 inch diameter concrete pipe damaged this summer durin6 a well installation.
J.
Fisher said the repair plan is under review by Bechtel and includes a sheeted pit I
to expose the damaged section. ( CLOSED ITEM )
Item 53 Status of Circulating / Service Water Structure Dama6ed Seal.
I V.
Madill requested a status of the damaged seal between the front of the service water and circulating water structure.
J.
Fisher said a diver had l
filmed the joint and repair plans are underway.
( CLOSED ITEM )
e
y
?
l
[
Notes of Daily Mseting i
Independent Assessment of Underpinning l
Midland Plants Units 1 & 2 i
Consumers Power Company Held at Midland Site Location Midland, Michigan l
September 20, 1983 i
Item 53 Lagging Tolerance Within Bell Area of SWPS Piers.
V.
Madill asked if the tolerance limits on the bell area lagging will be difficult to maintain especially when jack spreading of the sets is required. J.
Fisher will respond.
( OPEN ITEM )
i
/
}
1 9
i
2
+
s h
l\\
Notes of Daily Meeting.
Independent Assessment of Underpinning Midland Plant Units 1 & 2 Consumers Power Company Held at Midland Site Location Midland Michigan September 21, 1983 Present For:
Consumers Power Bechtel MPQAD Stone & Webster R.
Wiel'and J.
Fisher R.
Sevo J.
Springer J.
Gaydos W.
Kilker E.
Cviki P.
Vanderveer Parsons V.
Madill
. Purpose
, This meeting is held each day to discuss items regarding the Independent Soils Assessment at the Midland Plant, Units 1 & 2.
Discussion Item 53 Status of E8 Grillage Load Transfer.
J.
Fisher reported that load transfer to the EPA jacks was initated on 9-20.
The allowable upward movement level was attained and load is presently being held at 110% of specified load. ( CLOSED ITEM )
Item 53 Status of NCRs on BWST.
~
P.
Vanderveer. reported that 5 NCRs remain open but only onefon cut reinforcing bars,is affecting the work. Resolution on the open NCRs is expected shortly.
( CLOSED ITEM )
s Item 53 *;7 -
Filling of 36 Inch Diameter Cans.
J.
Fisher stated plans are being developed to fill the 2-36 inch diameter holes approximat'ely 40 feet deep that were utilized during the freezewall installation. ( CLOSED ITEM )
f l
Item 53 Engineering Evaluation of Soil Adjacent to Observation Well l
l Near the Corner of D,iesel Generator Building.
E.
Cvikl said that Engineering will be utilizing the cone penetrom,eter device to evaluate the soil conditions around the observation well hole where there i
l had been a soil collapse during installation in 1982. A separate specification has been prepared to define this work. ( CLOS'D ITEM )
Item 53-19
- Quality Action Point Review.
Kilker inquired as. o the status of the earlier proposal to review the t
W.number of action points required in the underpinning work.
E.
Cviki said a committee of personnel from MPQAD. Engineering, F30, SMO and Mergentime has met and selected the anchor installation procedure as an evaluation test Within a few weeks the results on this procedure will be finished and case.
a decision will be made on the usefullness of this endeavor. ( CLOSED ITEM )
)
5
Notes of Daily Peeting Independent Assessment of Underpinning Midland Plant Units 1 & 2 Consumers Power Company Held at Midland Site Location Midland, MichiEan September 22, 1983 Present For:
Consumers Power Bechtel MPQAD Stone & Webster G.
Murray J.
Fisher J.
Moran W.
Kilker J.
Gaydos '
J.
Springer i
E.
Cviki P.
VanderVeer*
Parsons D.
Lavalle V.
Madill Part Time' Purpose
+ This meeting is held each day to discuss items regarding the Independent Soils Assessment at the Midland Plant, Units 1 & 2.
Discussion Item 53 Grillage Load Transfer Status.
J.
Fisher reported that on the WB grillage the load is at 125 percent of specifiet load and the 24 hour2.777778e-4 days <br />0.00667 hours <br />3.968254e-5 weeks <br />9.132e-6 months <br /> deflection criteria is expected to be satisfied shortly. The EB Erillage load is now up to 125 percent of -
specified load with an EPA upward deflection of 65 mils due to the load transfer.
E.
Cviki stated Project Engineering is fully aware of the lead / deflection status and is providing input. ( CLOSED ITEM )
It'em 53-21 Status of Near term Work.
n J.'
Fisher reported that upon completion of E/W14 piers the Mergentime s
crew will complete the filling of the 2-36 inch diameter holes put in during the free:ewall installation. Then the crew will return to install piers E/W13. ( CLOSED ITEM )
Idem 53 AUM Criteria.
W.
Kilker asked what the significance of attaining the 125 percent of specified load isiparticularly in light of having to revise upward the AUM ( allowable upward movement ) periodically as the load was increased.
E.
Cviki and D.
Lavelle replied that Engineering considers attaining 125 percent of the specified load important to substantiate design basis Also, upward movements to date ( on the order of 60 mils parameters.
maximum ) are not considered detrimental to the structure and the stress /
strain indicator on the structure have not shown any significant stress change as a result of the loadings. ( CLOSED ITEM )
~%
I 1:
e' Notes of Daily Meeting Independent Assessment of Underpinning Midland Plant Units 1 & 2 Consumers. Power Company Held at Midland Site Location Midland, Mich$gan September 23,.1983 Present For:
Consumers Power Bechtel MPQAD Stone & Webster 4
G.
Murray J.
Fisher R.
Sevo W.
Kilker E.
Cviki J.
Springer P.
Vanderveer J.
Gaydos Parsons None Purpose Jhis meeting is held each day to discuss iaems regarding the Independent Soils Assessment at the Midland Plant Units 1 & 2.
. Discussion Item 53-23: BWST NCR Status.
P.
Vanderveer reported that NCR resolution is complete except for field fabrication of reinforcing dowels. Sign-off and training to this procedure is' required. ( CLOSED ITEM )
I Item 53-24: E/W8 Grillage Load Transfer Status.
J.
Fisher & E. Cviki stated that the pier deflection criteria for 24 hours2.777778e-4 days <br />0.00667 hours <br />3.968254e-5 weeks <br />9.132e-6 months <br /> should be satisfied shortly to allow wedging-off the load. Upward movement of the EPAs has been ipproximately 60 mils and 70 mils for the W8 and E8 units, respectively.
G. i Murray said 70 mils is approximately the value that the NRC understands to be the upward limit. ( CLOSED ITEM )
Item 53-25:
Revision to Soil Backfill Specification.
E.
Cvikl ssid the SCN containing' clarifications to Assessment Team comments
'l has been signed-off. (Reference Items 49-6,50-4 and 50-29.)( CLOSED ITEM )
Item 53-26:
SWPS Pier Bell Lagging Installation Tolerance.
s In response at an earlier Team question ( Item 53-14), J.
Fisher said the 11 inch tolerance limit for the non-spread lagging sets is considered by the Contractor to be attainable. However, discussions are continuing on the feasibility of attaining a it, inch limit on the spreader sets. ( CLOSES OUT '
ITEM 53-14) ( OPEN ITEM )
e Item 53-27:
Lean FlyAsh Grout Placement for SWPS Soldier. Piles.
J.
Springer said the SWP procedures do not' appear to reference-flyash_ grout
~
placement. J.
Gaydos will investigate.-( OPEN ITEM )-
~f 1
. (
/
't
~
n 4r
r Notes of MPQAD Meeting Independent' Assessment of Underpinning Midland Plant Units 1 & 2 I
Hela at Midland Site Location Midland, Michigan September 20, 1983 Present For:
MPQAD Stone & Webster J.
Meisenheimer B.
Holsinger D.
Horn P.
Majeski R.
Oliver M.
DeWitt Purpose This meeting is held to obtain and discuss information relative to Q. A.
activities for soils underpinning work at the Midland Plant Units 1 & 2.
Item 53 Status of NIR # 14.
4 Meisenheimer reported that corrective action was taken but that the J.NIR disposition is being held pending determination of any root cause.
( CLOSED ITEM )
I Item 53-2C Status of NIR # 15 MPQAD is evaluating the nonconformance. ( CLOSED ITEM )
Item 53 Status of Mechanism of Identifying Quality Concerns.
A draft procedure has been prepared for a " steering committee" review.
( CLOSED ITEM. ITEM 45-80. REMAINS OPEN )
MPQAD will update progress.
Item 53 40 -
Status of PQCI For Structural Backfill.
The Assessment Team indicated that the draft of the reissued PQCI did not Additional comments were given to fully addr;as the original comments.