ML20082B906

From kanterella
Jump to navigation Jump to search
Final Significant Deficiency Rept 35 Re Nonconforming HVAC Fabrication & Installation.All Deficiencies Will Be Corrected by 840601
ML20082B906
Person / Time
Site: Limerick  Constellation icon.png
Issue date: 11/02/1983
From: Kemper J
PECO ENERGY CO., (FORMERLY PHILADELPHIA ELECTRIC
To: Murley T
NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION I)
References
35, NUDOCS 8311210366
Download: ML20082B906 (1)


Text

.

PHILADELPHIA ELECTRIC COMPANY 2301 M ARKET STREET P.O. BOX 8699 PHILADELPHI A. PA.19101 (215)841-4502 JOHN S. KEMPER NW 2GM VIC E #R ESID E N T ansemaa nsMG AND RESE ARCH Mr. Thomas E. Murley

$ Y j e-United States Nuclear Regulatory Commission Office of Inspection and Enforcement, Region I 631 Park Avenue King of Prussia, PA 19406 Subj ec t : Significant Deficiency Report No. 35 Final Report f or HVAC Fabrication and Installation Deficiencies Limerick Generating Station, Units 1 & 2 NRC Construction Pemit Nos. CPPR-106,107

Reference:

a)

Interim Report of March 23, 1981 b)

Final Report of September 29, 1981 c)

J. S. Kemper to R. C. Haynes letter dated January 20, 1982

Dear Mr. Murley:

In our letter dated January 20, 1982, on the above subject deficiency, it was stated that w anticipated correcting all the HVAC nonconforming conditions by September 1,1983. However, due to scheduling changes beyond the control of the Philadelphia Electric Company, nonconforming conditions that exist in HVAC duct fabricated for Unit 2, but not yet installed, have not yet been corrected. It is now expected that all nonconf orming conditions will be corrected by June 1,1984.

If there are any questions on this matter, we would be pleased to discuss them with you.

Sincerely LCD/drd /831031/1-2 Copy to: Director of Inspection and Enforcement United States Nuclear Regulatory Camission Washington, D.C.

20555 S. K. Chaudhary, Resident NRC Inspector 4

gL 4

8311210366 831102 PDR ADOCK 05000352 g

PDR l

P