ML20082B391

From kanterella
Jump to navigation Jump to search
Special Rept:On 910609,Channel 3 (Upper Reactor Vessel) of Vibration & Loose Parts Monitoring Sys Declared Inoperable Due to Lack of Signal on Channel.Channel Not Repaired Until Future Outage
ML20082B391
Person / Time
Site: Catawba Duke Energy icon.png
Issue date: 07/09/1991
From: Tuckman M
DUKE POWER CO.
To:
NRC OFFICE OF INFORMATION RESOURCES MANAGEMENT (IRM)
References
NUDOCS 9107150124
Download: ML20082B391 (2)


Text

il I

,m.,-,,~.

4, s,,,..,

b f,vr/himrnn/4,I g,.,, j y s,,,j, g s

6

,l' U lb-2 f oii

\\ u g, cy. t y,,,arv.,

n e.u,,

a c.. ~1 1,.

, ;,,,;,. s ;,

k ouxepowen July 9,1991 U. S. Nue: car Regulatory Commission A'ITN: Document Control Desk WashinEton, DC 20555

Subject:

Catawba Nuclear Station Unit i Docket No. 50-413 Special Report Vibration and loose Parts Monitoring System Pursuant to Technical Specification 3.3.3.9, find attached a Special Report concerning the inoperability of the Unit i Vibmtion and loose Parts Monitoring System Channel #3 (Upper Reactor Vessel),

l Very truly yours, b, ).

M. S. Tuckman CRIJSR7991 Attachment xc: S. D. Ebneter Regional Administrator, Region II R. E. Martin, ONRR W. T. Orders Senior Resident Inspector 9107150124 910709

-PDR ADOCK 05000413 i ti S

.PDR-

\\

e SP!..iAL ltEPOltT CATAWilA NUCLEAlt STATION, UNIT 1 Vibration and loose Parts Monitoring System Channel 3 On June 9,1991 Channel #3 (Upper lleactor Vessel) of the Vibration and loose Parts Monitoring System was declared inoperable due to a lack of signal on the channel. A missile shield must be removed to repair the channel. Therefore, the channel will not be repaired until a future outage. Channel #4, which is the other Upper Itcactor Vessel Channel, is functioning and provides coverage.

Since the channel has been inoperable for more than 30 days, it is reportable to the NitC pursuant to Technical Specification 3.3.3.9.

>