ML20082A711

From kanterella
Jump to navigation Jump to search
Forwards Rev 1 to ISI Rept Unit 1 Catawba 1992 Refueling Outage 6
ML20082A711
Person / Time
Site: Catawba Duke Energy icon.png
Issue date: 03/20/1995
From: Rehn D
DUKE POWER CO.
To:
NRC OFFICE OF INFORMATION RESOURCES MANAGEMENT (IRM)
Shared Package
ML20082A714 List:
References
NUDOCS 9504040200
Download: ML20082A711 (3)


Text

. _,,

% s.:

Yy l-

~.,

' ^hF DukelbwerCanpany.

11ce hesident D. L kN Catawba Nuclear Generation Department (803)U13205 ottice

,'4800 ConcordRoad York.SCTJ145 (803)8313426 Fax o

mggmg March 20,1995 -

f t

U.S. Nuclear Regulatory Commission

' Attention: Document Control Desk Washington, D.C. 20555 -

Subject:

~ Catawba Nuclear Station, Unit 1 Docket No. 50-413 Unit 1 Refueling Outage 6 1992 Inservice inspection Report, Rev.1 Gentlemen:

Please make the following changes and/or additions to the above subject report as shown below to correct, " Items Completed" and " Percentage Completed", information for.

ASME Section XI Category B-G-1.

Delete Add l

NIS-1,2 pages dated 12/21/92 ~

NIS-1,2 pages dated 3/1/95 Cover Sheet, dated 12/11/92 Cover Sheet, dated 2/27/95 -

Table of Contents, Rev. 0 Table of Ccatents, Rev.1 i

Section 1 Section i 1

Pages 1-3, Rev. O, dated 12/9/92 Pages 1-3, Rev.1, dated 2/27/95 Section 2 Section 2

' Pages 1-5, Rev. O, dated 12/9/92 Pages 1-5, Rev.1, dated 2/27/95 Section 1 Section 3 Page 1 Rev. O, dated 12/9/92 Page 1 Rev.1, dated 2/27/95 Page 10 Inspection Listing, 12/18/92 Page 10 Inspection Listing,2/27/95 i

Section 4 Section 4 Page 1 Rev. O, dated 12/9/92 Page i Rev.1, dated 2/27/95 Page 3 Inspection Results, 12/18/92 Page 3 Inspection Results,2/27/95 i

[

040027 9504040200 950320 1

hDR ADOCK 05000413

.l 4

%,,,,wm, PDR i

.J

.; n n.

.-1 Document Control Desk -

Page 2 March 20,1995 i

Delete Add-Siqjigal Section 5 Pages 1-4 Rev. O, dated 12/9/92 Pages 1-4 Rev.1, dated 2/27/95 If you have any questions, please call L.J. Rudy at (803) 831-3094.-

Very truly yours

~

D.L. Rehn

' LJR/s Attachment l

t h

~

4' Document Control Desk Page 3 :

March 20,1995 r.

)

- xc (with attachment):

t S.D. Ebneter, Regional Adminirtrator Region II j

. R.J. Freudenberger, Senior Resident Inspector R.E. Martin, Senior Project Manager ONRR 4

)

t t

t 1

-