ML20081M747

From kanterella
Jump to navigation Jump to search
Monthly Operating Rept for Sept 1983
ML20081M747
Person / Time
Site: Robinson Duke Energy icon.png
Issue date: 09/30/1983
From: Morgan R, Norris H
CAROLINA POWER & LIGHT CO.
To: Deyoung R
NRC OFFICE OF INSPECTION & ENFORCEMENT (IE)
References
RSEP-83-1272, NUDOCS 8311170358
Download: ML20081M747 (4)


Text

OPERATIkDATAREPORT

,a}~

OS -

6 e

DOCKET NO.

NnciruratoSrial RSEP/83-1272 P g6 1'of 3' CONPLETED BY H.

RAY NORRIS JPERAYING STATUS-TELEPHONE (803)383-4524 u---------

f.' UNIT NAME: ROBINSON UNIT 1 2 I NOTES I

L PEPORTING PERIOD: SEPTEMBER 83 l

1 There are presentl'y 157 Spent 2

LICENSED THERMAL POWER (MWT)l'2300 1

Fuel Assemblies in the Spent 4.' NAMEPLATE RATING (GROSS MWE) 739 0 '

1 6

Fuel Pool.

L. DESIGN. ELECTRICAL RATING (NET -MWE)i ' 700.0 1

j L

!>.--MAX DEPENDABLE CAPACITY (GROSS MWE) 700.0 l'

7. MAX' DEPENDABLE CAPACITY.(NET MWE). 665.0 O. 'IF CHANGES OCCUR IN-CAPACITY RATINGS- (ITEMS 3 THRU 7) SINCE LAST REPORT,

-CIVE REASONS-No change.

s

'?. POWER LEVEL LTO. WHICH RESTRICTED Ili ANY (NET MWE) 1955 MWt reactor power.

N REASONS FOR ftESTRICTION IF ANY: Although the unit is not restricted by any outside gg:ncy, the power level is presently. reduced.due to steam generator considerations..

.I

-YR_TO C,UMUL THIS

,ATIVE,

  • MONTH DATE

-720.00 6551.00 110237.00,

.-HOURS IN REPORTING PERIOD 2a'NUi1B'ER.OF' HOURS. REACTOR CRITICAL 349.85

~~ ~ 392.31.

5377.94

'82217.71

' J00.08 3.. REACTOR RESERVE 5HUTDOWN HRS

.75.48 i

7 3., UNIT RESERVE S'HUTDOWN. HOURS 344.85, 5261.87 80097.91 1.

HOURS GENERATOR l0N LINE

.00

~.00 23.20

.MWH) 557641.44 92.19768.96 159,984360.48-6.' CROSS THERMAL,. ENERGYrGEN.

(

?.

GROSS ELEC. ENERGY GEN. ~(MWH)

.173703.00 2922302.00. '51431065.00 3.' NET ELEC. ENERGY GCNERATED (MWH) 156625.00

.2729620.00 48601722.00.-

~

?. UNIT SERVICE FACTOR.

47.~.90 80.32 72.66

9. UNIT AVAILABILITY FACTOR 47.90:

80.32

-72.68

'. UNIT-CAP. FACTOR (USING.MDC NET)_

32;71 62.66 66.30

3. : UNIT-CAP. FACTOR (USING DER NET) 31'.08 59.52 62.98 L UNITEFORCED OUTAGE RATE f

52.10 10.12 13.96 4.

SHUTDOWNS SCHED. OVER NEXT 6' MONTHS (TYPE, DATE, AND DURATION OF-EACH)

Typ22, December 10,i983,fourfeek-steamgene'ratorinspectionoutage.

-J 5.

IF SHUTDOWN AT END OF REPORT PERIO'D, ESTIMATED DATE OF' START'UPi On line.

4. UNITS IN CTEST STATUS (PRIOR ~ TO - COMMERCI AL OPERATION); FORCAST ACHEIVED I.NITI ALE C'RI' TIC AL'iTY

~

INITIAL ELECTRICITY COMMERCIAL OPERATIUN -

~

. t i.' i 6

' 9 M

'311170358 830930 8

PDR ADOCK 05000261

'l l

R pop

,R: gs 2' cf 3 APPENDIX B AVERACE DAILY POWER LEVEL.

DOCKET NO. 050-0261 UNIT ROBINSON UNIT 2 DATE 10/03/83 COMPLETED BY h".

RAY NORRIS TELEPHONE (803)383-4524

'TEMDER 1983 AY AVG. DAILY POWER LEVEL DAY AVG. DA'ILY POWER LEVEL (MWE-NET)

(MWE-NET)-

529 17

-q4 e

527 18

-24 3

531 19

-23 s

4~

531 20

-24 l3 181 21 195 99 29

'o'

/

/

'9 23 304 S

--O 24 386

,9

-8 25

'523

-8 26 548

-8 27 s 546

-8 28 549

!?

-8 29 550

'o

-10 30 549

~

i5

-14

-20

\\ '

I O

~l F

i e16 - 8 s

\\

4 DOCKET NO. 50-261 _

UNIT SHUTDOWNS AND POWER REDUCTIONS UNIT NAME H. B. Robinson DATE 831005 COMPLETED BY A. E. Scott REPORT MONTil September TELEPHONE 801-1A1-As24

\\

"E h.

._k Licensee Cause & Corrective E

.! E 3

E,%

No.

Date g

gg jgy Event u7 a3 Action to H

cs E j;5 Reporiat

,# o ju Prevent Recurrence-O i

10-01 830901 S

0 A

4 HB HTEXCH Power reduction to approximately 80%

due to steam generator considerations 10-02 830905 F

375.15 A

4 83-23 CJ HTEXCH Unit removed from" service due to primary-secondary leakage in "A" steam generator.

One tube leak in

(

the hot leg and one in the cold leg l

were plugged. Unit tripped during a manual shutdown.

(

l 2

3 4

F: Forced Reason:

Method:

Exhibit G - Instructions S: Scheduled A Equipment Failure (Explain) 1-Manual for Preparation of Data B-Maintenance of Test 2-Manual Scrain.

Entry Sheets for Licensee n

Event ReporI (LER) File (NUREG-Y C-Refueling 3 Automatic Scram.

D Regulatory Restriction 4-Other (Explain) 0161) m E Operator Training & License Examination 5

F-Administ rative eo Fsh: bit ! - Same Source 5

G Operational Error (Explain)

(9/77)

Il-Other (Explain)

/

s.

v Carolina Power & Light Company H. B. ROBINSON STEAM ELECTRIC PLANT Post Office Box 790 Hartsville, South Carolina 29550 October 7, 1983 Robinson File No:

15505 Serial: RSEP/83-1272 Mr. Richard C. DeYoung, Director Office of Inspection & Enforcement U. S. Nuclear Regulatory Commission Washington, D. C.

20555 H. B. ROBINSON STEAM ELECTRIC PLANT, UNIT NO. 2 DOCKET No. 50-261 LICENSE NO. DPR-23 MONTHLY OPERATIONS REPORT

Dear Mr. DeYoung:

In accordance with Technical Specification 6.9.1.c for the H. B. Robinson Steam Electric Plant, Unit No. 2, Carolina Power & Light Company herewith submits the report of operation statistics and shutdown experience for the month of September, 1983.

Very truly yours, j

R. E. Mo gan General Manager H. B. Robinson SE Plant l

AES/aes Enclosure cc.

R.' A. Hartfield (2)

~'

J. P. O'Reilly (1)

,, ncg 37 ggicuGD g

83 0

a ccrentd 27,u, 4

}

I \\

_