ML20081M629

From kanterella
Jump to navigation Jump to search
Amend 123 to License NPF-12,deleting License Conditions 2.C.13,2.C.14 & 2.C.32
ML20081M629
Person / Time
Site: Summer 
Issue date: 03/29/1995
From: Bateman W
Office of Nuclear Reactor Regulation
To:
Shared Package
ML20081M632 List:
References
NUDOCS 9504030018
Download: ML20081M629 (5)


Text

.

p1 ctoo y*

1 UNITED STATES l

J j

NUCLEAR REGULATORY COMMISSION a

WASHINGTON, D.C. 2056H001

%,.....[

)

o SOUTH CAROLINA ELECTRIC & GAS COMPANY SOUTH CAROLINA PUBLIC SERVICE AUTHORITY DOCKET NO. 50-395 VIRGIL C. SUMER NUCLEAR STATION. UNIT NO.1 i

AMENDMENT TO FACILITY OPERATING LICENSE Amendment No.123 License No. NPF-12 1.

The Nuclear Regulatory Commission (the Commission) has found that:

A.

The application for amendment by South Carolina Electric & Gas Company (the licensee), dated October 29, 1993, as supplemented March 11, 1994, May 18, 1994, September 20, 1994, and October 20; 1994, complies with the standards and requirements of the Atomic-Energy Act of 1954, as amended (the Act), and the Commission's rules and regulations set forth in 10 CFR Chapter I; B.

The facility will operate in conformity with the application, the provisions of the Act, and the rules and regulations of the l

Commission; C.

There is reasonable assurance (1) that the activities authorized by this amendment can be conducted without endangerinq the health and safety of the public, and (ii) that such activities will be conducted in compliance with the Commission's regulations; D.

The issuance of this amendment will.not be inimical to the common defense and security or to the health and safety of the public; and E.

The issuance of this amendment is in accordance with 10 CFR Part 51 of the Commission's regulations and all applicable requirements have been satisfied.

2.

Accordingly, Operating License NPF-12 is amended as indicated in the attachment to this license amendment.

)

9504030018 9503297 PDR ADOCK 05000395 P

PDR

. 3.

This license amendment is effective as of its date of issuance and shall be implemented within 30 days of issuance.

FOR THE NUCLEAR REGULATORY COMISSION 1

maw William H. Bateman, Director Project Directorate II-1 Division of Reactor Projects - I/II Office of Nuclear Reactor Regulation

Attachment:

Pages 7 and 12 to Operating License NPF-12 Date of Issuance: March 29, 1995

'l 4

sy ATTACHMENT TO LICENSE AMENDMENT NO. 123 TO FACILITY OPERATING LICENSE NO. NPF-12 DOCKET NO. 50-395 Replace the following pages of Operating License No. NPF-12 with the enclosed pages. The revised pages are indicated by marginal lines.

. Remove Paaes Insert Paaes 7

7 7a 1

l 12 12 i

e

. I c.

The reporting of the inservice inspection examination results shall be documented in a manner to define qualitatively whether, the weldment and the heat I

affected zone and adjacent base metal on both sides of the weld were examined by ultrasonic angle beam techniques.

(12) Desian Description - Control (Section 4.3.2. SER)

SCE&G is prohibited from using part-length rods'during power operation.

(13) Deleted (14) Deleted (15) Deleted (16) Cable Tray Separation (Section 8.3.3. SSER 4) s

.) '

Prior to startup after the first refueling outage, SCE&G shall implement the modifications to the cable trays discussed in Section 8.3.3 of Supplement No. 4 to the Safety Evaluation Report or demonstrate to the NRC staff that faults induced in non-Class IE trays will not result in failure of cable in the adjacent Class 1E cable trays.

(17) Alternate Shutdown System (Section 9.5.1. SSER 4)

Prior to startup after the first refueling outage, SCE&G shall install a source range neutron flux monitor independent of the control corcplex as part of the alternate system.

1 l

Amer.dment No. 123 l

. (31). Final NRC Anoroval of Emeraency Preparedness (ASLB Sucolemental Partial Initial Decision.- Auaust 4.1982.

Section VIII.9) i Prior to exceeding 5% of full power, final NRC staff approval of the state of emergency preparedness for the-f

. Virgil C. Summer Nuclear Station site shall be required.

(32)' Deleted (33)

Emeraency Preparedness Exercise (Section 13.3. SSER #5)

Prior to March 31, 1983, SCE&G shall conduct an emergency exercise similar to that conducted on May 5, 1982 but which includes full participation of the local governments and partial State participation.

2.D An exemption to the requirements of Paragraph III.B A of Appendix G to 10 CFR Part 50 is described in Section 5.3.1 of Supplement.

No. I to the Office of Nuclear Reactor Regulation's Safety Evaluation Report. A limited exemption to the requirements of ?

Section IV.F.l(b) of Appendix E to 10 CFR Part 50 is described in a letter from B. J. Youngblood, NRC to 0.W. Dixon, Jr., dated November 2, 1982. These exemptions are authorized by law'and will i

not endanger life or property or the common defense and security.

and are otherwise in the public interest. The facility will operate, to the extent authorized herein, in conformity with the application, as amended, the provisions of the Act, and the rules and regulations of the Commission, j

2.E SCE&G shall fully implement and maintain'in effect all provisions of the Commission-approved physical security, guard training and qualification, and safeguards contingency plans including amendments made pursuant to provisions of the Miscellaneous Amendments and Search Requirements revisions to 10 CFR 73.55 (51 FR 27817 and 27822) and to the authority of 10 CFR 50.90 and 10 CFR 50.54(p). The plans, which contain Safeguards Information protected under 10 CFR 73.21, are entitled:

" Virgil C. Summer Nuclear Station Physical Security Plan," with revisions submitted through December 15, 1987; " Virgil C. Summer Nuclear Station Guard Training and Qualification Plan," with revisions submitted through March 24,1987; and " Virgil C. Sumer Nuclear Station Safeguards Contingency Plan," with revisions submitted through Narch 24, 1987. Changes made in accordance with 10 CFR 73.55 shall be implemented in accordance with the schedule set forth therein.

Amendment No. 123

__