Interim Deficiency Rept Rdc 62(82) Re GE Supplied Hfa Relays.Due to Delay in Turnover of Sys,Insp of Unit 1 Delayed Until First Quarter 1984.Unit 2 Relays Delayed Until 1985.Final Repts Expected 840427 & 851220,respectively
ML20081M375
Person / Time
Site: Perry  
Issue date: 10/31/1983
From: Edelman M
CLEVELAND ELECTRIC ILLUMINATING CO.
To: James Keppler
NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION III)
References
RDC-62(82), NUDOCS 8311170239
Download: ML20081M375 (1)


Text

Dn:8 F

,o. A

,cr e

s n:

< r t.f, u a

. Lw re 1 -,

t

.4 P.. box $000 - CLEVELAND. oHlo 44101 - TELEPHONE (216) 622-9800 - ILLUMINATING BLDG.

- 55 PUBLIC SOUARE Serving The Best Location in the Nation MURRAY R. EDELMAN VICE PRESIDENT NUCLE A R Mr. James G. Keppler Regional Administrator, Region III Of fice of Inspection and Enforcement U.S. Nuclear Regulatory Commission 799 Roosevelt Road Glen Ellyn, Illinois 60137 RE: Perry Nuclear Power Plant Docket Nos. 50-440; 50-441 Potential Significant Deficiency on General Electric Supplied HFA Relays [RDC 62(82)]

Dear Mr. Keppler:

As stated in our interim report to you dated September 17, 1982, an inspection is to be conducted to evaluate a possible deficiency in HFA relays supplied to Perry Nuclear Power Plant by the General Electric Company. Our letter to you dated November 5,1982, identified that this inspection would be completed by October 31, 1983, for Units 1 and 2.

Due to delays in the turnover of one system containing HFA relays, Nuclear Test Section will finish the inspection of the Unit I relays during the first quarter of 1984.

For the systems inspected to date, no relays containing incorrect wipe settings were identified. The final report on the Unit I relays will be submitted by April 27, 1984.

The inspection for the Unit 2 relays has been postponed until 1985 due to the current low priority placed on Unit 2 work. Our next report concerning the Unit 2 relays will be submitted by December 20, 1985.

Please call if there are any additional questions.

Sincerely, Murray R. Edelman Vice President Muclear Group MRE:pab cc:

Mr. M. L. Gildner U.S. Nuclear Regulatory Commission NRC Site Office c/o Document Management Branch Washington, D.C.

20555 Director Office of Inspection and Enforcement Records Center, SEE-IN U.S. Nuclear Regulatory Commission In titute of Nuclear Power Operations Washington, D.C.

20555 1100 Circle 75 Parkway, Suite 1500 Atlanta, Georgia 30339 8311170239 831031 PDR ADOCK 05000440 NOV 7N S

PDR 3477' }O