AlabamaPower the southem electrc satem October 24, 1983 Director, Office of Nuclear Reactor Regulation ATTN: Document Centrol Desk USNRC Washington, DC 20555
Dear Sir:
In accordance with Alabama Power Compaay Administrative Procedure FNP-0-AP-4, Control of Plan; Documents and Records, attached are revisions to Emergency Plan Implementing Procedures.
Please verify that you have the procedures with the corresponding copy numbers that are listed on the Document Transmittal Form.
Please sign and return the forms as soon as possible to tite following address:
Alabama Power Cnmpany Farley Nuclear tant Box 470 Ashford, AL 36312 ATTN: Document Control Supervisor If you should have any questions, please call me at (205) 899-5156 Ext. 422.
Sincerely, M
r.'P Do[cument Control Sup/
J yB Hudspeth ervisor JBH:hre cc: Larry W. Enfinger File i
d x ces 8311000150 831102
/
hDRADOCK 05000348
$ f2 PDR W
4 l
REGULATORY INFORMAT10N DISTRIBUTION SYSTE:4 (RIOS)
ACCESSION NdR:a01;20;;;, -
00C.0 ATE: 83/10/24 NOTARIZED: NO 00CKET s FACIL:50-348 Joseon M.
Farley Nuclear Plant, Unit 1,
Alaoama Power- 05000348 50-3o4 Josepn M.
Forley. Nuclear Plant, unit 2, Alaoama Power 05000364 A U T H. N A ' E _,.
AUTHOR AFFILIATION m
NUDSPETW,J.B.
Alaoama Power Co.
RECIP.NAME RECIPIENT AFFILIATION Occument Management branch
SUBJECT:
Forwards Central riles version of Rev 4 to Emergency P'1an Ir.olementing Procedure FNP-0-LIP-7, " Security Support to Emergency Plan * & Temporary Cnange notice 26A to f
F4P-0-EIP-8, " Notification Roster."
COPIES RECEIVED:LTR _/_ ENCL }. SIZE:,~
__7I _
08STRIBUT!dN CODE: X005S
' " ~ ~ ~~
TITLE: Emer7 Plan (CF Avail)
NOTES:
RECIPIENT COPIES RECIPIENT COPIES IJ CODE /NAME LTTR ENCL 10 CODE /NAME LTid ENCL NRN OR61 BC 1
0 REEVES,E.
01 1
1 INTERNA L 02 1
1 FEMA TECH HAZ09 1
1 IE/0EPER/EPB 03 2
2 It/DEPER/IRo 1
1 NRR/OSI/AEd 1
1 NRR/OSI/RA6 1
0 dEG FILES Ol 1
1 i
TOTAL NUMBE4 0F COPIES HEwulRED: LTTR 10 ENCL "9"
PRCCEDURE REQUEST FORM FNP-0-AP-1 1.
Procedure Number @?-C -6 /F P 3evision Number M Procedure Title w-W.: h Ar.,
CV Safety Related C
Non-Safety Related C
New Procedure Request C
Procedure Revision, New Revision Number
/
Temporary Procedure Change, Effective until nexc per:nanent
~
dure Change, Req'd. by Plant N NS5db b ' '
C ora ro CONTROt.!.ED CCPY C
Temporary Procedure Change, One Time Use, TCN O
Delete procedure IXTNOT REPRODUCE CCPY NO.C33 2.
Chan,e Sem ry 1.1 Procedure Psge Nu=cers Affected by Change cA 1 2.2 Description of Changes cp, a c~.LJ me 2.3 Reason for Change U;/V w A..w-3 J -- h h[/
s/12ru'~sG lma M Qbx 3.
Prepared By c/dt$G,
, ;kl. Cio,
/
t o-7 -D Signature Title Date Reviewed ByV//Yhr,,A/_,
,[d b
, //1 7 d a.
Signature Title
/
Date 5.
Cross-Disetplinary/ECP.C Revtew W. J. W ~
^, Ti t h Date Signature Groun PD/4 -
AJfn
, M -w.fy 6.
Temporary Change Approval (Signature /Date) l Member Group Staff T/,Me~
/ /d 083 C
Shift Foreman
//
/
l Senior Reactor Cperator v
/
?lant Manager p/d, W
! w.V--f3 7.
Final Approval (Signature /Date, requtred vi nin 50 days of temporar7 approval; Group Supervisor j
Plant Superin encen.
MSAER 71:a ? resident Nuclear Ge:eration l
l 7
Plant Manager
^
Figure i Gen. Rev. '. 3 I
)
1 l
l l
FARLZY WCLIAR PLANT NUCLIAR SAFETY EVALUATION CHICK LIST i
I (1) UNIT /d
., e.
(2) CHECK LIST APPLICA3LE TO: cn F c *<>- 0 Revision
??
TCN eu6 (3) SAFETY EVALUATION - PART A The procedure, procedure change or sodifiestion to which this evaluation is applicable represents:
(3.1) Yes No
/
A change to the plant as described in the ISAR?
I (3.2) Tes No
/
A change to procedures as described in the ?SAR?
I (3.3) Yes No A test or e.xpe '~~ ot described in the ISAR?
(3.4) Tes No A cnange :: :n % --- 21 icec:.fications c:
Cperattng License'?
If the answer to question 3.1, 3.2 or 3.3 is '"fES," complete Item U+) and attach a 10 CFR 50.59 evaluation.
If the answer :o all of :he above is "No," omic Ites t'4) and Item (9).
If the answer to question 3.4 is "Yes,"
comotete a 10 CFR 50.92 check list.
(4) SAFETY EVALUATION - PART 3 (4.1) Yes No Will the probability of an accident previously evaluated in the ISAR be increased?
(4.2) Yes No Will the consequences of an accident previously evaluated in the ISAR be increased?
(4.3) Yes No May the possibility of an accident which is different :han any already evaluated in the ISAR be created?
(4.4) Yes No Will the probability of a malfunction of equ:.pment 4.nportant to safety previously evaluated an the FSAR be increased?
(a.5) Tes No Will :he consequences of a malfunction of equipment =poc:an :: saie:7 fifferent : an any alreadv evalus.ed in :he ?SAR be increased?
(i.6) Tes No May the po'ssib:.li:y of a talfunction of equipmen; impor an :: safa-; diffs ::: h:2 any already evalus ed in -he ISAR be created'?
(1.7) Yes No Will the margin of safety as defined in :he bacia o any Technical Specifica-ion be reducac?
If the answer o any of the above questions is "Yes," an unreviewed safety question is involved. I:qlain the basis for each answer provided in Section 1 (5)
RIMA.*J<S : (A::ach addi-ional paget if necessary)
'/ Dm5 2A'I
'O (s) ?RI? ARID 3Y:
e.... 3 Y:
M%e, f< d'
,....;. /e - 7 a,..,
... c.
~
.n 3
s.
- 3) ? CRC RE'IIIW:
&/.4 K2* C 2A~
A0-Za-/>
- o..,.AR3 c. e.ns..
, An.
e Dis::ibutton 3 r:.g:.nal: Cocument :an.:cl File AOM
l Tigure 3 Gen. Rev. 13
_ _ ~.
--