ML20081H607
| ML20081H607 | |
| Person / Time | |
|---|---|
| Site: | Clinton (NPF-062) |
| Issue date: | 03/21/1995 |
| From: | Pickett D Office of Nuclear Reactor Regulation |
| To: | Illinois Power Co |
| Shared Package | |
| ML20081H613 | List: |
| References | |
| NPF-62-A-099 NUDOCS 9503240326 | |
| Download: ML20081H607 (6) | |
Text
yy e" 5'?
p l
ye
/*,
UNITED STATES
((
'j
,j NUCLEAR REGULATORY COMMISSION k
's WASHINGTON. D.C. 2(MM001 s,...../
ILLIN0IS POWER COMPANY. ET AL.
DOCKET NO. 50-461 CLINTON POWER STATION. UNIT NO. 1 AMENDMENT TO FACILITY OPERATING LICENSE Amendment No. 99 License No. NPF-62 l.
The Nuclear Regulatory Commission (the Commission) has found that:
A.
The application for. amendment by Illinois Power Company * (IP), and Soyland Power Cooperative, Inc. (the licensees) dated February 14, 1995, complies with the standards and requirements of the Atomic i
Energy Act of 1954, as amended (the Act), and the Commission's rules and regulations set forth in 10 CFR Chapter I; i
8.
The facility will operate in conformity with the application, the provisions of the Act, and the rules and regulations of the l
Commission, C.
There is reasonable assurance (i) that the activities authorized '
by this amendment can be conducted without endangering the health and safety of the public, and (ii) _that such activities will be conducted in compliance with the Commission's regulations; f
D.
The issuance of this amendment will not be inimical to the common defense and security or to the health and safety of the public; and E.
The issuance of this amendment is in accordance with 10 CFR Part 51 of the Commission's regulations and all applicable requirements have been satisfied.
2.
Accordingly, the license is amended by changes to the Technical Specifi-cations as indicated in the attachment to this license amendment, and i
paragraph 2.C.(2) of Facility Operating License No. NPF-62 is hereby amended to read as follows:
i
- Illinois Power Company is authorized to act as agent for Soyland Power Cooperative, Inc. and has exclusive responsibility and control over the physical construction, operation and maintenance of the facility.
i 9503240326 950321 PDR ADOCK 05000461 P
PDR MM M
' (2)
Technical Specifications and Environmental Protection Plan The Technical Specifications contained in Appendix A and the Environmental Protection Plan contained in Appendix B, as revised through Amendment No. 99, are hereby incorporated into this license.
Illinois Power Company shall operate the facility in accordance with the Technical Specifications and the Environmental Protection Plan.
3.
This license amendment is effective as of its date of issuance.
i FOR THE NUCLEAR REGULATORY COMMISSION Q
v' Douglas V. Pickett, Project Manager Project Directorate III-3 Division of Reactor Projects - III/IV Office of Nuclear Reactor Regulation
Attachment:
Changes to the Technical i
Specifications Date of Issuance: March 21. 1995 1
b f
b b
c
i 5
ATTACHMENT TO LICENSE AMENDMENT NO. 99 FACILITY OPERATING LICENSE NO. NPF-62 DOCKET NO. 50-461 Replace the following pages of the Appendix "A" Technical Specifications with the attached pages.
The revised pages are identified by amendment number. and contain vertical lines indicating the area of change.
l t
i Remove Paaes Insert Paaes I
3.8-16 3.8-16 3.8-27 3.8-27
't 3.8-36 3.8-36 l
p 4
a 6
k l
AC Sources--Shutdown 3.8.2
..c-t l
3.8 ELECTRICAL POWER SYSTEMS
-3.8.2 AC Sources--Shutdown LC0 3.8.2 The following AC electrical power sources shall be OPERABLE:
a.
One qualified circuit between the offsite transmission network and the onsite Class IE AC electrical power distribution subsystem (s) required by LCO 3.8.10,
" Distribution Systems--Shutdown";
b.
One diesel generator (DG) capable of supplying one division of the Division 1 or 2 onsite Class IE AC electrical power distribution subsystem (s) required by LC0 3.8.10; and c.
One qualified circuit, other than the circuit in
[
LC0 3.8.2.a, between the offsite transmission network and the Division 3 onsite Class IE AC electrical power l
distribution subsystem, or the Division 3 DG capable of supplying the Division 3 onsite Class IE AC electrical power distribution subsystem, when the High Pressure i
Core Spray System is OPERABLE for compliance with LC0 3.5.2, "ECCS-Shutdown."
APPLICABILITY:
MODES 4 and 5, During movement of irradiated fuel assemblies in the primary or secondary containment.
ACTIONS
NOTE----------------------------------
1 LC0 3.0.3 is not applicable.
(continued) l l
CLINTON 3.8-16 Amendment No. pp,99
7 I
DC Sources--Shutdown 3.8.5 3.8 ELECTRICAL POWER SYSTEMS 3.8.5 DC Sources-Shutdown LC0 3.8.5 The following shall be OPERABLE:
a.
One Class IE DC electrical power subsystem capable of supplying one division of the Division 1 or 2 onsite Class IE DC electrical power distribution subsystem (s) required by LC0 3.8.10, " Distribution Systems -
Shutdown";
b.
One Class IE battery or battery charger, other than the DC electrical power subsystem in Le,0 3.8.5.a, capable of supplying the remaining Division 1 or Division 2 onsite Class IE DC electrical power distribution subsystem (s) when required by LC0 3.8.10; and c.
The Division 3 and 4 DC electrical power subsystems capable of supplying the Division 3 and 4 onsite Class IE DC electrical power distribution subsystems, when the High Pressure Core Spray System is OPERABLE for compliance with LCO 3.5.2, "ECCS-Shutdown."
APPLICABILITY:
MODES 4 and 5, During movement of irradiated fuel assemblies in the primary or secondary containment.
CLINTON 3.8-27 Amendment No. 95,99
Inverters--Shutdown
)
3.8.8 3' 8 ELECTRICAL POWER SYSTEMS 1
3.8.8 Inverters--Shutdown r
LCO 3.8.8 The following Divisional inverters shall be OPERABLE:
I a..
One Divisional inverter capable of supplying one division of the Division 1 or 2 onsite Class IE uninterruptible AC bus electrical power distribution-subsystem (s) required by LCO 3.8.10, " Distribution Systems - Shutdown"; and b.
The Division 3 and 4 Divisional inverters capable of supplying the Division 3 and 4 onsite Class IE uninterruptible AC bus electrical power distribution subsystems, when the High Pressure Core Spray System is OPERABLE for compliance with LC0 3.5.2, "ECCS-Shutdown."
APPLICABILITY:
MODES 4 and 5, During movement of irradiated fuel assemblies in the primary or secondary containment.
6 i
t i
i i
CLINTON 3.8-36 Amendment No. 55,99
.