ML20081H347
| ML20081H347 | |
| Person / Time | |
|---|---|
| Site: | Palisades |
| Issue date: | 10/25/1983 |
| From: | Krich R CONSUMERS ENERGY CO. (FORMERLY CONSUMERS POWER CO.) |
| To: | NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION III) |
| References | |
| NUDOCS 8311070397 | |
| Download: ML20081H347 (1) | |
Text
g f
jab E
E' IPMBNAA BRID
[
1-010685C298 10/25/83 rn
}
ICS IPMMVID MVN l
06831 MT VERNON IL 10-25 1258P CDT MVIB
~
g ICS IPMBDGS y
1-010348C298 10/25/83 TLX CONSPOWER JKN 284 CONSUMERS POWER JACKSON '.il 12:26 EDT 10-25 PMS U S NUCLEAR REGULATORY COMMISSION 312 932 2500 PALISADES PLT SECT CHIEF 799 ROOSEVELT ROAD GLEN ELLYN IL 60137 E
c MSG 4t MLB432 e
('
E TO:
U S NUCLEAR REGULATORY COMM.'SSION y
ATTN: PALISADES PLANT SECTION CHIEF 3
C.
799 ROOSEVELT AVENUE q
GLEN ELLYN, ILLINOIS 3
~
(-
FROM:
R M KRICH, PALISADES CC:
VICE-PRESIDENT, NUCLEAR OPERATIONS, P-26-1178
(.
NUCLEAR LICENSING ADMINISTRATOR, P-24-614B THIS CONFIRMS PROMPT NOTIFICATION OF AN OCCURRENCE REPORTABLE PER e
('
T.S.
6.9.2.A(9).
A RECENT ANALYSIS PERFORMED BY THE A/E (BECHTEL)
.9 HAS RESULTED IN THE DISCOVERY OF A DESIGN DEFICIENCY IN THE SUPPORT E
CONFIGURATION FOR THE ONE-INCH DIAMETER FILL AND DRAIN PIPING TO E
c T-82D (D SAFETY INJECTION TANK).
THE SUPPORT CONFIGURATION FOR THIS y
RUN OF PIPING DOES NOT PROVIDE ADEOUATE VERTICAL AND LATERAL SUPPORT m
3 TO MEET FSAR SEISMIC CRITERIA FOR OBE ANS SSE CONDITIONS.
SUPPORTS
(.
FOR THIS PIPING WILL BE REDESIGNED AND INSTALLED DURING THE CURRENT REFUELING / MODIFICATION OUTAGE.
AN EVALUATION OF SIMILAR PIPING ON THE REMAINING SAFETY INJECTON TANKS (T-82A, B AND C) WILL BE
(
CONDUCTED TO DETERMINE IF THE SAME CONDITION EXISTS.
CORRECTIONS WILL BE MADE AS NECESSARY.
INITIAL REPORT WAS MADE VIA TELECON TO NRC REGION III ON OCTOBER 24,
~
1983.
THE RESIDENT INSPECTOR WAS ALSO NOTIFIED ON OCTOBER 24, 1983.
1256 EST c
e.
1522 EST
=
E IPMBNAA BRID k