Arizona Public Service Company
- 'U p.
P.O BOX 21666. PHOENIX. ARIZONA 85036 h/
1 u 2'h m.
T.',{'(
October 24, 1983 j
ANPP-28070-BSK/RQT 0h) 7 U. S. Nuclear Regulatory Commission Region V Creekside Oaks Office Park 1450 Maria Lane - Suite 210 j
Walnut Creek, CA 94596-5368 Attention: Mr. T. W. Bishop, Director, Division of Resident, Reactor Projects and Engineering Programs e
Subject:
Time Extension for Report - DER 82-61 A 50.55(e) Potentially Reportable Condition Relating To Reactor Coolant Pump Diffusor Ring-Cap Screws May Fail j
and Damage Pump File: 83-019-026; D.4.33.2
Reference:
(A) Telephone Conversation between J. Eckhardt and G.
Duckworth on October 21, 1982.
(B) ANPP-22368, dated November 22, 1982 (Interim Report)
(C) ANPP-23026, dated February 16, 1983 (Time Extension (D) ANPP-23278, dated March 17, 1983 (Time Extension) 4 (E) ANPP-23798, dated May 18,1983 (Interim Report)
(F) ANPP-27395, dated July 25, 1983 (Time Extension) 4
Dear Sir:
The NRC was notified of a potentially reportable deficiency in Reference ( A), Interim Reports were transmitted by References (B) and l
(E), and Time Extensions were requested by References (C), (D), and (F).
In Reference (F), it was estimated that a Final Report would be available by October 20, 1983.
Due to the extensive investigation and evaluation required, it is now l
expected that this information will be finalized by January 23, 1983, at l
which time a complete report will be submitted.
There is no new information or change to the Interim Report at this time.
Very truly r,
c b.
C,lLL O LQ E. E. Van Brunt, Jr.
APS Vice President,
- E * "
8311070299 831024
{DRADOCK 05000528 ANPP Project Director r
PDR EEVBJr/RQT:ru cc: See Attached Page 2 O $$ f l
Mr. T. W. Bishop DER 82-61 Page 2 cc:
Richard DeYoung, Director Office of Inspection and Enforcement U. S. Nuclear Regulatory Commission Washington, D. C. 20555 T. G. Woods, Jr.
G. C. Andognini J. A. Roedel D. B. Fasnacht A. C. Rogers B. S. Kaplan W. E. Ide J. Vorees J. R. Bynum D. D. Green /P. P. Klute A. C. Gehr W. J. Stubblefield W. G. Bingham R. L. Patterson R. W. Welcher R. M. Grant D. R. Hawkinson L. E. Vorderbrueggen G. A. Fiorelli S. R. Frost J. Self D. Canady Records Center Institute of Nuclear Power Operations 1100 Circle 75 Parkway - Suite 1500 Atlanta, Georgia 30339 i